Jaipur Vidyut Vitran Nigam Limited Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Jaipur Vidyut Vitran Nigam Limited - JVVNL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Feb 2025
Closing Date10 Mar 2025
Tender Amount₹ 84,00,00,000 
Notes
Download

Costs

  • EMD

    ₹ 10,00,000
  • Document Cost

    ₹ 2,950
  • Tender Fee

    ₹ 590

Summary

Annual Labour Rate Contract For Jaipur Discom For Erection, Testing And Commissioning Work

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Levelling of ground

-

-

-

... More
Levelling of ground up to 30 cm.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)

1

1

1.51

... More
Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting)

1

6

6.74

... More
Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line.

1

29

29.98

... More
CHAPTER NO.2: EARTH WORKS INCLUDING FOUNDATION ACTIVITIES

-

-

-

... More
Excavation of pit in soil (ordinary) to erect various supports and stay sets including stacking of excavated soil from the edge of excavation (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13).

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit

-

-

-

... More
8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep

1

87

87.26

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

1

92

92.99

... More
10/11 Mtr/ 1.2mx0.6mx1.65 m deep

1

98

98.88

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

1

305

305.16

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

1

322

322.53

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

1

72

72.7

... More
6'x 5/8" -0.75x0.5x1.35 m

1

63

63.85

... More
Excavation of pit in Hard soil (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13).

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail Size of pit

-

-

-

... More
8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep

1

95

95.93

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

1

102

102.29

... More
10/11 Mtr/ 1.2mx0.6mx1.65 m deep

1

108

108.65

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

1

335

335.69

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

1

354

354.9

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

1

79

79.97

... More
6'x 5/8" -0.75x0.5x1.35 m

1

70

70.37

... More
Excavation of pit in ordinary rock which does not require blasting/murrad (in Jodhpur discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit

-

-

-

... More
8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep

1

241

241.14

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

1

255

255.72

... More
10/11 Mtr/ 1.2mx0.6mx1.65 m deep

1

273

273.07

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

1

1310

1310.5

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

1

1566

1566.22

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

1

232

232.47

... More
6'x 5/8" -0.75x0.5x1.35 m

1

209

209.21

... More
Excavation of pit in Hard rock ( Where blasting/drilling is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit

-

-

-

... More
8 Mtr/R.S.Joist/M.S. Rail 1.2mx0.6mx1.35 m deep

1

811

811.48

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

1

958

958.7

... More
10/11 Mtr/ 1.2mx0.6mx1.65 m deep

1

1135

1135.39

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

1

2651

2651.24

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

1

2903

2903.07

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

1

663

663.94

... More
6'x 5/8" -0.75x0.5x1.35 m

1

589

589.23

... More
Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter.

-

-

-

... More
Soft /loose soil

1

60

60.29

... More
Hard /dense soil

1

77

77.04

... More
Hard soil mixed with boulders

1

107

107.88

... More
Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken ) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix.

1

2371

2371.19

-

-

-

... More
The rates are all lead of cement,lime,ballast, sand,surkhi and grit etc.at site of work.

-

-

-

... More
For all concrete work coarse sand shall be used no extra will be paid .

-

-

-

... More
Concrete mix prepared by power driven mechanical mixer shall be used .

-

-

-

... More
Under exceptional coditions, where mechanical mixer and vibrator are not used(with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator

-

-

-

... More
Thickness of the cement concrete should not exceeed 100 mm.

-

-

-

... More
Plaster on new surface on walls in cement, sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick.

1

128

128.32

-

-

-

... More
The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift.

-

-

-

... More
The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc.

-

-

-

... More
Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate ) rounding off edges etc.but excluding cost of nosing of steps etc. complete.

-

-

-

... More
25 mm thick with 12.5 mm thick nominal size aggregate.

1

167

167.39

... More
75 mm thick with 20 mm thick nominal size aggregate.

1

398

398.92

-

-

-

... More
The rates for all items inculde all form of work , laying ,curing and finishing etc. The rates are for complete work at site, inclusive of all leads.

-

-

-

... More
The rates cover the preparation and cleaing of all places

-

-

-

... More
Providing and fixing of reinforced ferro cement drain cover designed for Class -A leading duly marked on cover with adequate steel reinforced cement having thickness 75 mm to 150 mm with anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks addmixture like plasticizer bond improving compound , shrinking resistance compound abrasion resistant complete as per approved design etc with span 300 to 450 mm and standard size 600x800 mm ( when trench is working as a culvert).

-

-

-

... More
75 mm

1

2231

2231.7

... More
100 mm

1

2510

2510.67

... More
125 mm

1

2789

2789.63

... More
150 mm

1

3068

3068.59

... More
Supply & fixing of Fibre reinforced ferrocement drain cover (light duty) designed for Road side drain for Class-B loading duly marked on cover with adequate steel reinforcement having thickness 38 mm anti corrosive bitumen painted M.S. Plate, rim and on M.S. lifting hooks, additives and addmixture like plasticizer, shrinkage resistance compound,abrasion resistance etc. as per approved drawing & design complete in all respect with span 300 to 450 mm and standard size 600x1200 mm (when trench is working as an ordinary trench).

1

1089

1089.67

... More
Masonry for foundation and plinth

-

-

-

... More
Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6(1 Cement : 6 Sand) including labour charges.

1

1924

1924.83

... More
Brick masonry for foundation and plinth in Cement sand mortar 1:6 ( 1 Cement : 6 Sand ) including labour charges.

1

2817

2817.52

-

-

-

... More
Rates provided are for the complete finished items inclusive of cost of water and materials with all leads labour, all type of taxes, royalty, scaffolding curing, laying fixing, finishing etc.hire charges for tools and plants templates and other appliance.

-

-

-

... More
In case of non availability of stone header of proper size cement concrete header of mix 1:3:6(M-10) with 25 mm graded stone aggregate with smooth finish may be provided by the contractor at no extra cost.

-

-

-

... More
CHAPTER NO.3: TRANSPORTATION OF MATERIAL

-

-

-

... More
Safe carriage of PCC poles including loading / un-loading

-

-

-

... More
a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole

-

-

-

... More
Within 10 Kms.

1

231

231.74

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

4

4.75

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

2

2.45

... More
b) 8 Mtr. Long PCC pole

-

-

-

... More
Within 10 Kms.

1

157

157.61

... More
Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof.

1

4

4.75

... More
Above 30 Kms. Add for each Kms. or part thereof

1

2

2.45

... More
c) 9 Mtr.long 200 Kg. PCC pole

-

-

-

... More
within 10 Kms.-

1

194

194.46

... More
Above 10 Km. & upto 30 Km. add for each Km. or part thereof

1

4

4.75

... More
Above 30 Km. add for each Km. or part thereof

1

2

2.45

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site

-

-

-

... More
Within 10 Kms.

1

325

325.65

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

4

4.61

... More
Above 30 Kms. Add for each Kms. or partthereof.

1

2

2.86

... More
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.

-

-

-

... More
Within 10 Kms.

1

390

390.29

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

5

5.57

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

3

3.52

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.

-

-

-

... More
Within 10 Kms.

1

474

474.71

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

4

4.61

... More
Above 30 Kms. Add for each Kms or part thereof.

1

3

3.52

... More
Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading from store to site (these Charges will be 1.5 times for both sides)

-

-

-

... More
a) 10 & 16 KVA

-

-

-

... More
Within 10 Kms.

1

196

196.51

... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.

1

5

5.57

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

3

3.79

... More
b) 25 & 40 KVA

-

-

-

... More
Within 10 Kms.

1

238

238.51

... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.

1

6

6.78

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

4

4.61

... More
c) Above 40 KVA & upto 100 KVA

-

-

-

... More
Within 10 Kms.

1

387

387.71

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

6

6.78

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

4

4.61

... More
d) Above 100 KVA & upto 315 KVA

-

-

-

... More
Within 10 Kms.

1

889

889.63

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

11

11.52

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

9

9.21

... More
e) Above 315 KVA upto 500 KVA

-

-

-

... More
Within 10 Kms.

1

1749

1749.48

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

16

16.12

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

11

11.52

... More
Safe Carriage of 6.35/0.24 KV Single phase distribution transformer including loading /unloading from store to site (These charges will be 1.5 times for both sides).

-

-

-

... More
16/25 KVA

-

-

-

... More
Within 10 Kms.

1

196

196.51

... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.

1

5

5.57

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

3

3.79

... More
5/10 KVA

-

-

-

... More
Within 10 Kms.

1

176

176.18

... More
Above 10 Kms. & upto 30 Kms Add for each Km.or part thereof.

1

5

5.42

... More
Above 30 Kms. Add for each Kms. or part thereof.

1

3

3.52

... More
Safe carriage of Damaged/repair distribution transformer from ACOS to repairing firm /repairing firm to ACOS per transformer (upto 100 kVA, 3 Phase)/upto 25 KVA, 1 Phase.

-

-

-

... More
Within 10 Kms

1

136

136.2

... More
Above 10 Kms & upto 30 Kms Add for each Km or part thereof

1

4

4.35

... More
Above 30 Kms & upto 50 Kms . Add for each Km or part thereof

1

3

3.52

... More
Above 50 Kms . Add for each Km or part thereof

1

2

2.57

... More
Safe carriage of Damaged/repair distribution transformer from Acos to repairing firm /repairing firm to Acos per transformer (Above 100 KVA to 315 KVA & 500 KVA)

-

-

-

... More
Within 10 Kms

1

203

203.27

... More
Above 10 Kms & upto 30 Kms Add for each Km or part thereof

1

6

6.5

... More
Above 30 Kms & upto 50 Kms . Add for each Km or part thereof

1

5

5.15

... More
Above 50 Kms . Add for each Km or part thereof

1

3

3.94

... More
Safe Carriage of 33/11 KV Power Transformer

-

-

-

... More
a) Upto 1.6 MVA

-

-

-

... More
Within 10 Kms

1

3455

3455.6

... More
Above 10 Kms & upto 30 Kms . Add for each Km or partthereof

1

34

34.56

... More
Above 30 Kms & upto 50 Kms . Add for each Km or partthereof

1

23

23.45

... More
Above 50 Kms . Add for each Km or part thereof

1

12

12.2

... More
b) Above 1.6 MVA & Upto 3.15 MVA

-

-

-

... More
Within 10 Kms

1

4268

4268.68

... More
Above 10 Kms & upto 30 Kms . Add for each Km or partthereof

1

42

42.7

... More
Above 30 Kms & upto 50 Kms . Add for each Km or partthereof

1

28

28.46

... More
Above 50 Kms . Add for each Km or part thereof

1

14

14.23

... More
c) 5.0 MVA

-

-

-

... More
Within 10 Kms

1

5081

5081.77

... More
Above 10 Kms & upto 30 Kms . Add for each Km or part thereof

1

50

50.81

... More
Above 30 Kms & upto 50 Kms . Add for each Km or part thereof

1

33

33.61

... More
Above 50 Kms . Add for each Km or part thereof

1

16

16.27

... More
Safe carriage of transformer from stores to stores( upto 100 KVA three phase/upto 25 KVA single phase.)

-

-

-

... More
Within 10 KMs.

1

136

136.2

... More
Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof

1

4

4.35

... More
Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof

1

3

3.52

... More
Above 50 Kms.Add per each km,or part thereof

1

2

2.57

... More
Safe carriage of transformers from stores to stores(Above 100 KVA and upto 500 KVA)

-

-

-

... More
Within 10 KMs.

1

203

203.27

... More
Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof

1

6

6.5

... More
Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof

1

5

5.15

... More
Above 50 Kms.Add per each km,or part thereof

1

3

3.94

... More
Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores

-

-

-

... More
Within 10 KMs.

1

889

889.63

... More
Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof

1

11

11.52

... More
Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof

1

9

9.21

... More
Above 50 Kms.Add per each km,or part thereof

1

6

6.91

... More
Safe carriage of panels including loading/ unloading and stacking in Nigam stores

-

-

-

... More
Within 10 KMs.

1

711

711.72

... More
Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof

1

9

9.21

... More
Above 30 Kms. and upto 50 Kms.Add per each km,or part thereof

1

7

7.32

... More
Above 50 Kms.Add per each km,or part thereof

1

5

5.43

... More
Safe Carriage of 33/11 KV Power Transformer

-

-

-

... More
8.0 MVA

-

-

-

... More
Within 10 Kms

1

6400

6400.29

... More
Above 10 Kms & upto 30 Kms . Add for each Km or part thereof

1

63

63.99

... More
Above 30 Kms & upto 50 Kms . Add for each Km or part thereof

1

41

41.97

... More
Above 50 Kms . Add for each Km or part thereof

1

19

19.54

... More
Transportation of Single phase Sub-Station Structure from sub-division store to the site & Erect it on the existing pole at a height of 5 Mtr. from the ground level

1

315

315.82

... More
CHAPTER NO.4: LOADING AND UNLOADING OF MATERIAL

-

-

-

... More
Safe loading of steel fabricated / unfabricated conductor drum & other line material.

1

220

220.54

... More
Safe loading of power/ distribution transformer.

-

-

-

... More
(A) 33/11 KV power transformer.

-

-

-

... More
Upto 1.6 MVA

1

3178

3178.09

... More
Above 1.6 MVA & upto 3.15 MVA

1

3839

3839.29

1

5035

5035.67

... More
Above 5 MVA

1

7678

7678.59

... More
(B) 11/.4 KV Distribution Transformer

-

-

-

... More
10 & 16 KVA

1

97

97.75

... More
25 & 40 KVA

1

123

123.68

... More
Above 40 KVA & upto 100 KVA

1

166

166.35

... More
Above 100 KVA & upto 315 KVA

1

290

290.02

... More
Above 315 KVA

1

622

622.86

... More
(C ) 6.35/0.24 KV Transformer

-

-

-

... More
25 KVA

1

123

123.68

... More
Upto 16 KVA

1

85

85.91

... More
Safe unloading of steel fabricated/ unfabricated conductor drum & other line material.

1

108

108.71

... More
Safe unloading of power/distribution transformers

-

-

-

... More
a) 33/11 KV power transformer.

-

-

-

... More
Upto 1.6 MVA

1

2570

2570.19

... More
Above 1.6 MVA & upto 3.15 MVA

1

3225

3225.06

... More
Above 3.15 MVA

1

4265

4265.88

... More
b) 11/.4 KV Distribution Transformer

-

-

-

... More
10 & 16 KVA

1

44

44.44

... More
25 & 40 KVA

1

55

55.1

... More
Above 40 KVA & upto 100 KVA

1

85

85.18

... More
Above 100 KVA & upto 315 KVA

1

238

238.04

... More
Above 315 KVA

1

491

491.16

... More
(c ) 6.35/0.24 KV Transformer

-

-

-

... More
Upto 16 KVA

1

44

44.44

... More
25KVA

1

55

55.1

... More
CHAPTER-5: ERECTION OF SUPPORTS & STAYS

-

-

-

... More
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.

-

-

-

... More
R.S.Joists

1

1783

1783.8

... More
M.S.Rails

1

1740

1740.28

... More
Lattice Structure

1

4888

4888.53

... More
Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
(A) IN URBAN AREA

-

-

-

... More
PCC Poles 8 Mtr. Long (200Kg)

1

388

388.06

... More
PCC Poles 9 Mtr. Long (400 Kg)

1

590

590.78

... More
PCC Poles 11 Mtr. Long

1

672

672.3

... More
PCC Poles 9 Mtr. Long (200Kg)

1

488

488.19

... More
(B) IN RURAL AREA

-

-

-

... More
PCC Poles 8 Mtr. Long (200Kg)

1

309

309.02

... More
PCC Poles 9 Mtr. Long (400 Kg)

1

449

449.9

... More
PCC Poles 10 / 11 Mtr. Long

1

519

519.03

... More
PCC Poles 9 Mtr. Long(200Kg.)

1

378

378.93

... More
Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long

1

1297

1297.81

... More
PCC Poles 8 Mtr. Long /R.S. Joist

1

914

914.55

... More
PCC Poles 9 Mtr. Long(200 Kg.)

1

1105

1105

... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire

-

-

-

... More
8"x3/4" with 7/8 SWG stay wire

1

278

278.81

... More
6"x5/8" with 7/10 SWG stay wire

1

241

241.31

... More
Erection & fixing of steel struts in the excavated pit in position.The top end of the strut will be properly holed/welded with the main support muffed in cement concrete of ratio 1:3:6 as per item No.5.7.The nuts and bolts will be provided by the contractor as per Nigams specification for which payment will be made at the prevailing store issue rate.The cost of muffing and grouting will be paid extra.

-

-

-

... More
R.S.Joists

1

1722

1722.75

... More
M.S.Rails

1

1559

1559.72

... More
Lattice Structure

1

3410

3410.02

... More
P.C.C Poles 8 Meter

1

370

370.7

... More
P.C.C Poles 9 Meter(200Kg.)

1

418

418.44

... More
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.

1

2823

2823.89

... More
Supplying and laying of randum rubble stone boulder having weight not less than 20 kgs.

1

462

462.77

... More
Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station.

1

3160

3160.02

... More
NOTE:-

-

-

-

... More
The approved design of cement concrete work will be given by the AEn./Incharge of the works.

-

-

-

... More
The payment of cement concrete work as per accurate measurement will be made in addition to the work of support erection.

-

-

-

... More
The rates are inclusive of all the material such as river send stone grit,water and T&P etc.unless otherwise specified.

-

-

-

... More
The quality of cement and other material shall be got checked and approved by the AEN. Incharge,

-

-

-

... More
The cement shall be supplied departmentally if avaiable otherwise contractor will have to arrange the same at his level.

-

-

-

... More
If the stay required to be grouted in cement then the rates as indicated in item 5.6 will be applicable & paid in addition to above rates and the charges for back filling with soil will be deducted @ 10.00 per cum.

-

-

-

... More
If stay insulator is not availabe with the Nigam. Then the contractor will have to provide the same as per Nigams Specification for which he will be paid in accordance with Prevailing Discom store issue rates

-

-

-

... More
Dismantling charges for all the items will be 60% of item Rates of erection charges . However charges for transportation of the material from works site in the sub-division store shall be paid as item rate of chapter III (transportation of material).The payment will be made after issuance of certificate by the AEn.concerned that all the dismantled material has been safely received in the sub-divisional store.

-

-

-

... More
The nuts and bolts will be privided/supplied by the contractor which will confirm to relevant ISS.

-

-

-

... More
CHAPTER-6: ASSEMBLY & INSTALLATION OF VARIOUS ITEMS

-

-

-

... More
Fixing of cross arms with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33 KV cross arms

1

51

51.92

... More
11 KV cross arms

1

32

32.09

... More
Fixing of top hampers with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33 KV Top Hampers

1

14

14.87

... More
11 KV Top Hampers

1

12

12.4

... More
Fixing of LT brackets with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
4' long

1

19

19.84

... More
2' long

1

17

17.36

... More
Fixing of guarding Bracket arms with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33 KV line

1

49

49.45

... More
11 KV line

1

27

27.12

... More
L.T.Line

1

27

27.12

... More
Fixing of earth wire clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

1

12

12.4

... More
Fixing of fabricated cantilever breacket on erected support as per design. The nuts&bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,

1

56

56.88

... More
Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33 KV line

1

135

135.91

... More
11 KV line

1

91

91.43

... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
33 KV line

1

81

81.52

... More
11 KV line

1

59

59.37

... More
Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 Nos. disc.& 1set of H/W) on terminal point including fixing of hardware and strips.

1

46

46.96

... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1 Nos. disc & 1 set of H/W ) on terminal point including fixing of hardware and strips.

1

22

22.31

... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.

1

33

33.63

... More
Fixing of shackle insulator with hardware.

1

9

9.92

... More
Fixing of 33kv pin insulator with pins.

1

14

14.87

... More
Fixing of 11 KV pin insulator with pins.

1

9

9.92

... More
Fixing of L T pin insulator with pins.

1

6

6.2

... More
Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(A)G.O. switch . with earthing blade.

-

-

-

... More
33kv G.O.switch

1

1235

1235.98

... More
11kv G.O.switch

1

963

963.97

... More
(B)G.O. switch . without earthing blade.

-

-

-

... More
33kv G.O.switch

1

1112

1112.29

... More
11kv G.O.switch

1

865

865.1

... More
11 KV SFU (three phase)

1

963

963.97

... More
6.35 KV SFU (single phase)

1

482

482.46

... More
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
33kv Horn Gap fuse set.

1

512

512.84

... More
11kv Horn Gap fuse set.

1

444

444.96

... More
Assembly and installation of 11 KV drop out cum Isolator on erected structure as per design, complete in all respect including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

1

225

225.58

... More
Installation of lightening arrestors on erected structure /support (1 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
(A)sub-station type

-

-

-

... More
33 KV L.A. each

1

170

170.95

... More
11 KV L.A. each

1

148

148.32

... More
(B)pole mounted type

-

-

-

... More
11 KV L.A. each

1

42

42

... More
Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
10 and 16 KVA

1

619

619.92

... More
25 and 40 KVA

1

621

621.01

... More
Above 40 KVA & up to 100 KVA

1

828

828.52

... More
Above 100 KVA & up to 315 KVA

1

941

941.34

... More
Above 315 KVA

1

1056

1056.03

... More
Installation testing as per Nigams norm & commissioning of 6.35/.24 KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
Upto 10 KVA

1

464

464.93

... More
16/25 KVA

1

621

621.01

... More
Installation of LT MCB (Distribution Box) on sub -station structure .The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,including connection on both ends with suitable lugs duly crimped (lugs & cable will be supplied by Nigam)

1

118

118.71

... More
Erection of LT Distribution / LT piller Boxes of 800/400/200/160/100 Amps. Capacity.Each 37"x24" base as per JVVNL standard including excavation,bricks,sand,cement masonary of size 4"x3"x10"and 3' in ground and 1 1/2'above road level with muffing to support and mounting the piller .Themasonary will have 4" X 4" opening 2"below ground level two in the rear sideand one each in the remaining sides to facilitate entry and exist of incomingand outgoing PVC cable.Earthing of the piller shall be connected to DPearth with 7/10 SWG StayWire & lugs.

-

-

-

... More
800 AMP.

1

2471

2471.92

... More
400 AMP.

1

2212

2212.35

... More
200/160 AMP.

1

2212

2212.35

... More
100 AMP.

1

2212

2212.35

... More
Laying of 1100 V, LT 3.5/4 core PVC/XLPE cable, of aluminiumconductor and fixing with cable clamps making conections/jumpers by alluminium lugs/ PG clamps of required size onLV side of distribution transformer/ LT distribution mains onone end and with MCB with /with isolater unit/ pillar box on theother end. Lugs should be crimped with crimping tool.Lugs/P.G.clamps will by provided by the contractor ,for which payment will be made as per prevalling Discom store issue rates.(outgoing feeder cable will also be considered as circuit)

-

-

-

... More
a) 25 Sq.mm

1

160

160.72

... More
b) 35 Sq.mm

1

160

160.72

... More
c) 50 Sq.mm

1

160

160.72

... More
d) 70 Sq.mm

1

222

222.4

... More
e) 95 Sq.mm

1

222

222.4

... More
f) 120 Sq.mm

1

593

593.26

... More
g)150 Sq.mm

1

593

593.26

... More
h)185 Sq.mm

1

672

672.3

... More
I) 240 Sq.mm

1

791

791.01

... More
j) 300 Sq.mm

1

1038

1038.21

... More
k)400 Sq.mm

1

1038

1038.21

... More
Fixing of danger plates on supports/structure

1

7

7.43

... More
Fixing of a set of 4 Nos 11 KV V cross arms(Chakri) made of MS channel with bracing of MS Flat.The nut and bolts shall be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

1

177

177.93

... More
Fixing of a set of 4 Nos 33 KV V cross arms(Chakri) made of MS channel with bracing of MS Flat.The nut and bolts shall be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

1

244

244.72

... More
Fixing of PG clamp of Weasel /Rabbit Conductor

1

4

4.97

... More
Fixing of PG clamp of Dog /Racoon Conductor

1

4

4.97

... More
Fixing of PG clamp of Panther Conductor

1

7

7.91

... More
Fixing of metering cum protection box on LT side of distribution transformer at stores

1

39

39.53

... More
Fixing of LT capacitors in metering cum protection box on LT side of distribution transformer at site.

1

49

49.45

... More
Tag Welding of Nuts and Bolts(with sealing bolts) at different 5 to 6 places at welded strips already provided on M&P boxes fitted on 11/0.4 KV 3 phase 25/40/63 KVA transformers as per latest drawing and design of Nigam in the stores for which adequate space and electricity will be provided by Nigam and handling of tranformer will be done by Nigam.

1

51

51.15

... More
Welding of door(s)(continuous welding of patties and tag welding of Nuts & Bolts with sealing bolt ) of M&P box fitted on 11/0.4 KV,3 phase 10/16/25/40/63/100 KVA transformers at 5 to 6 places with two nos. patties at site(one made of flat size 75x30x5 mm or 75x40x5 mm and other patti made of flat size 55x30x5 mm or 55x40x5 mm. These two patties will form one pair. Patti of size 75x30x5 mm /75x40x5 mm is to be welded on side of the box and other patti of size 55x30x5 mm or 55x40x5 mm is to be welded on door of the box to form locking arrangement through Nuts & Bolts(size 1/2"x1 1/2") as per latest drawinf and design of nigam.Patties and Nuts & Bolts will be provided by Nigam.

1

426

426.19

... More
Welding of single phase transformer(s)with base of transformer welded with substation structure at four points.Tag welding of all bolts & nuts of subatation structure,upper ring of transformer(s)and continuous welding of upper lid of transformer at three places of 2" siz including material.In case base of transformer with sub station structure and lid of transformer with ring is welded with piecec of flat iron then the flat iron would be provided by the Nigam.

1

426

426.19

... More
Making Push-Fit type arrangement insheet metal single phase and three phase meter boxes.

1

25

25.58

... More
Assembly,installation & commisioning of 11 KV Roaster switchs on erected structures with stting for accurate operation including fixing of allied accessories completed in all respect with post insulators and jumpering on both ends for connection with systm.The nuts & bolts will be supplied by contractor for which payment will be made as per prevailing Dicom store issue rates.

1

1619

1619.54

... More
Assembly,installation & commisioning of 33/11 KV gang operated isolating switch including installation and dismantling of fabricated steel required for mounting of 33/11 KV Gang operated isolating switch for sectionalizing 33/11 KV lines with setting for accurate operation including fixing of allied accesories complete in all respect with post insulator and jumpering on both ends for connection with the system,.

1

1619

1619.54

... More
Dismantling of existing 6.35/0.24 KV transformer and structure from 3 m height structure and installation, testing as per Nigam’s norms & commissioning of 6.35/0.24 KV transformer on existing support and raising height of structure from 3 m to 5 m from ground along with earth connections from existing earthing, including welding of transformer with base channels and by welding of Nuts and Bolts. (clamps of suitable size and earth strip if required will be supplied by Nigam.)/existing S.F.U shall also be lifted at proper place if possible otherwise same shall be deposited in AEN store along with other removed material.

1

1363

1363.82

... More
Tag Welding of single-phase transformer at different three places in Nigam’s stores one (at welded strips already provided) +2(with additional patties of size 55X30X5 mm)

1

37

37.5

... More
Providing of single phase CT meter in M&P box

1

37

37.94

... More
Fixing and replacement of MCCB in M&P box including clamping and making cable connections.

1

30

30.84

... More
Welding of door(s)(continuous welding of patties and tag welding of Nuts & Bolts with sealing bolt ) of M&P box fitted on 6.35KV /0.24 KV, single phase transformer at 3 to 4 places with two nos. patties at site(one made of flat size 75X30X5 mm or 75X40X5 mm and other made of flat size 55X30X5 mm or 55X40X5 mm. These two patties will form one pair. Patti of size 75X30X5 mm /75X40X5 mm is to be welded on side of the box and other patti of size 55X30X5 mm or 55X40X5 mm is to be welded on door of the box to form locking arrangement through Nuts & Bolts(size 1/2"x1.5") as per latest drawing and design of Nigam. Patties and Nuts & Bolts will be provided by Nigam.

1

405

405.9

... More
Tag Welding of Nuts and Bolts(with sealing bolts) at different 5 to 6 places at welded strips already provided on M&P boxes fitted on 11/0.4 KV 3 phase 16/10KVA three phase transformers as per latest drawing and design of Nigam in the stores for which adequate space and electricity will be provided by Nigam and handling of tranformer will be done by Nigam.

1

48

48.7

... More
Welding of door(s) (continuous welding of patties and tag welding of Nuts & Bolts with sealing bolt ) of M&P box fitted on 11/0.4 KV,3 phase 10/16/25/40/63 KVA transformers at 5 to 6 places with two nos. patties at Sub-Division Store (one made of flat size 75x30x5 mm or 75x40x5 mm and other patti made of flat size 55x30x5 mm or 55x40x5 mm. These two patties will form one pair. Patti of size 75x30x5 mm /75x40x5 mm is to be welded on side of the box and other patti of size 55x30x5 mm or 55x40x5 mm is to be welded on door of the box to form locking arrangement through Nuts & Bolts(size 1/2"x1 1/2") as per latest drawinf and design of nigam.Patties and Nuts & Bolts will be provided by Nigam.

1

177

177.92

... More
Continuous welding of three sidessliding front cover of meter chamber (size 400x2+390=1190 MM) of M&P Box for 10/16/25/40 KVA for three phase transformers including tag welding of 12 nos. nut & bolts used in TN-2217 and onwards.

1

63

63.16

... More
Replacement of defective items in LT Pillar Boxes (Only Labour Charges):-

-

-

-

... More
Knife Switches 200 A / 400 A

1

183

183.35

... More
  U- Contacts 200 A / 400 A

1

70

70.06

... More
Isolator / LBS / Rotary Switch 200 A / 400 A.

1

200

200.54

... More
MCCB 160 A / 200 A.

1

85

85.95

... More
MCB 32 A / 63 A (For LT Distribution Boxes)

1

45

45.85

... More
Erection of 11 KV RMU complete with accessories on existing foundation including use of special tools & conducting all pre-commissioning test before energization,connecting the cables etc. complete in all respect with erection & grouting of structure (excluding civil works for which payment shall be made extra as per clause No. 2.6 of CLRC). The relays will be tested by Discom.

1

4062

4062.97

... More
Erection of 2 Pole & 4 Pole DT Structure of 11KV RMU complete in all respect (excluding civil works for which payment shall be made extra as per clause No. 2.6 of CLRC).

-

-

-

... More
2 Pole Structure (Approx. 548 Kg)

1

977

977.51

... More
4 Pole Structure (Approx. 691 Kg)

1

1231

1231.9

... More
NOTE:-

-

-

-

... More
Dismentling charges for all the items (excluding item No. 6.37) will be 60% of item rates of erection charges.However charges for transportation of the material from works site to the sub-division store shall be paid as item rate of chapter III(Transportation of material).The payment will be after issuance of certificate by the AEn.concerned that all the dismentled material has been safely received in the sub-divisional store.

-

-

-

... More
The Quality of the material supplied by the contractor be got checked and approved by the Circle S.E.

-

-

-

... More
The nuts & bolts provided / Supplied by the contractor shall be confirm to relevant ISS.

-

-

-

... More
In case of pole, upper end of the G.I wire provided for earthing shall be bolted with cross arm.

-

-

-

... More
CHAPTER-7: STRINGING OF CONDUCTOR/ EARTH WIRE

-

-

-

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.

-

-

-

... More
(A) IN URBAN AREA

-

-

-

... More
ACSR PANTHAR

1

7993

7993.24

... More
ACSR DOG

1

2915

2915.03

... More
ACSR RACCOON

1

2692

2692.78

... More
ACSR RABBIT

1

2369

2369.63

... More
ACSR WEASEL

1

1454

1454.95

... More
Insulated RABBIT HT/LT

1

2915

2915.03

... More
(B) IN RURAL AREA

-

-

-

... More
ACSR PANTHAR

1

6830

6830.26

... More
ACSR DOG

1

2584

2584.3

... More
ACSR RACCOON

1

2506

2506.8

... More
ACSR RABBIT

1

2205

2205.98

... More
ACSR WEASEL

1

1312

1312.84

... More
Insulated RABBIT HT/LT

1

2584

2584.3

... More
Laying, jointing,stringing,tensioning and clamping of ACSR PANTHAR with proper sag as directed ,using compression type hardwares including binding on pin insulators,jumpering on section points with compression type jumpering cones.

1

8360

8360.22

... More
Laying , jointing,stringing,tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc.including proper binding at each end.The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(A) IN URBEN AREA

-

-

-

... More
G.I.Earth wire 6 SWG

1

1023

1023.34

... More
G.I.Earth wire 8 SWG

1

855

855.35

... More
G.I.Earth wire 10 SWG

1

850

850.22

... More
(B) IN RURAL AREA

-

-

-

... More
G.I.Earth wire 6 SWG

1

894

894.23

... More
G.I.Earth wire 8 SWG

1

736

736.47

... More
G.I.Earth wire 10 SWG

1

682

682.22

... More
Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire laces at an interval of two meter each or required as per location using EYE bolt, nuts and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts will be provided by thecontractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(A) For 4 wire stringing

-

-

-

... More
6 SWG with laces of 8 SWG

1

845

845.11

... More
8 SWG with laces of 10 SWG

1

689

689.97

... More
Fixing of G.I. Laces on Guard wire at an interval of one meter each or required as per location using EYE bolt ,nuts and bolts with washers etc.including binding,if required .The EYE bolts and other nuts and bolts will be provided by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
For 2 Guard wire

1

29

29.76

... More
For 3 Guard wire

1

32

32.24

... More
For 4 Guard wire

1

36

36.12

... More
Drawing of overhead ABC conductor (Areal bunched cable)on existing erected pole/support including laying. Jointing,stringing complete in all respect.

-

-

-

... More
1cX25 + 25 Sq mm

1

2067

2067.43

... More
3cx16+25 Sq mm

1

3101

3101.14

... More
3cx25 + 25 Sq mm

1

3618

3618

... More
3cx50 + 35 Sq mm

1

4548

4548.34

... More
Fixing of suspension clamps suitable for ABC cable

1

51

51.61

... More
Fixing of dead end clamps suitable for ABC cable

1

51

51.61

... More
Fixing of LT connectors type "A" suitable for ABC cable with cover.(including termination of service lines)

1

25

25.88

... More
Fixing of LT connectors type "B" suitable for ABC cable(including cable termination)

1

25

25.88

... More
Laying of 11 KV AB Cable on existing erected pole/support including laying jointing stringing including fixing of hardware /accessories complete in all respect

-

-

-

... More
3C x 70/50 Sq.mm.

1

6615

6615.78

... More
1C x 70/50 Sq.mm.

1

5582

5582.05

... More
Fixing of D Loops using ,ACSR Weasel/Rabbit Conductor having 9"Long 4" Deep with 6" binding on each side with binding wire on erected conductor (Rs.1.50 for 1phase service& Rs.3.00 for 3 phase service line will be paid extra for shifting of existing service line on D-Loops.)

1

10

10.4

... More
NOTE:-

-

-

-

... More
Dismantling charges for all the items will be 50% of item rates of erection charges.However charges for transportation of the material from works site to the sub-division store shall be paid as item rate of chapter-III(Transportation of material ).The payment will be made after issuance of certificate by the AEn. concerned that all the dismentled material has been safely received in the sub-divisional store.

-

-

-

... More
The quality of material supplied by the contractor be got checked and approoved by the Circle S.E.

-

-

-

... More
The nuts and bolts provided / supplied by the contractor shall be confirm to relevant IS for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
CHAPTER-8: EARTHING OF LINE AND SUB-STATIONS

-

-

-

... More
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)

1

335

335.22

... More
3 Nos. of earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16" dia.at flattened top and tightening of M.S.flat 50x6mm/25x3mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.

1

224

224.62

... More
Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder:

-

-

-

... More
Excavation of trench of 0.65 Mtrs.depth and 0.5 Mtr.width

-

-

-

... More
Normal soil

1

121

121.19

... More
Hard Soil

1

152

152.66

... More
Ordinary rock ( where blasting is not required.)

1

299

299.09

... More
Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust.

1

25

25.73

... More
Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust.

1

38

38.74

... More
Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr.length as per design and requirment to be driven in earth by mechanical means and Providing & .fastening of suitable clampswith the M.S. Rod, connection of earth wire/stay wire/MS flat in clamp depending on type of soil:

-

-

-

... More
Where drilling is not required

1

190

190.31

... More
Where drilling is required

1

623

623.01

... More
Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming & watering with lead up to 50 Mtr, and lift up to 1.5 Mtr.

1

5

5.12

... More
Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material.

1

7

7.13

... More
Earthing on 6.35/.24 KV S/S made with 4 nos. MS Rod 20 mm dia,electrodes (black) of 3 Mtr. Length to be driven in earth by mechanical means and jointing through transformers body, 11 KV neutral ,LT neutral & LA with MS flat 40x5 mm ( black 32 mtr.) .The MS Flat will be welded at the top of the electrode.

1

244

244.95

... More
Earthing of new 33/11 KV S/S with bentonite compound (including material ) involving following activities.

1

5656

5656.75

... More
Digging of 10.5 ft. deep pit of 4 ' dia ( approx 132 cu.ft)

-

-

-

... More
Supply of 2" G.I pipe with cap(including fabrication of 30 holes in the periphery of pipe)

-

-

-

... More
Making chamber for water pouring including cast iron manhole cover

-

-

-

... More
Supply cost of 200 kg bentonite compound with making slurry

-

-

-

... More
Supplu of black cotton soil approx 80 cu.ft.

-

-

-

... More
Connecting electrode with Mesh Earthing

-

-

-

... More
Pipe Earthing for Power Transformer at 33 / 11 KV S/S:- Supply & erection of earthing electrode shall consist of G.I. Pipe 100 mm,of 3 Mtr Length. The electrode shall be buried as far as practicable 3 meters below ground level. Wherever possible, earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fence. It shall be kept clear of the buildings foundations and in no case it shall be nearer than 2 meters from the outer face of the wall. The electrode shall be surrounded with layer of charcoal dust and salt mixture through out the length. The 100 mm GI pipe shall be provided with holes of 12 mm dia. drilled at 75 mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. A Clamp with Pati of 12" of M.S. Flat of size 50X6 mm shall be fixed (Bolted) on the top edge of the pipe which in turn shall be connected to Neutral / Body of the Power Transformer through M.S. Flat size 50X6 mm. The G.I. cap over the GI pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC inspection cover resting over a RCC frame, embedded in masonry.

1

5117

5117.12

... More
Note:-

-

-

-

... More
The quality of material supplied by the contractor be got checked and approved by the Circle S.E.

-

-

-

... More
The nuts and bolts provided / supplied by the contractor will be confirmed to relevant ISS.

-

-

-

... More
Supply & Erection of Maintenance free Gel Earthing with Pipe in pipe / Pipe in strip technology filled with anti corrosive conductive compound ( CPRI Tested ) below the ground in 150 - 200 mm dia. earth pit & surrounding filled with required mineral filling compound ( MFC should have hygroscopic property to retain the moisture for long time to create low resistance zone ) and C.C. finished chamber covered with hinged type with locking arrangement C.I. Cover, C.I. Frame of size 300mm x 300mm complete testing of earth resistance as required. The value of Earth resistance shall be obtained 0.5 Ohm in individual earthing. G.I Pipe (IS: 1239 marks) GI pipe 3000 mm long, 80 I 40 mm, Terminal 12 mm GI Strip. Earthing as per 18:3043-1987

1

6767

6767.47

... More
CHAPTER-9: METER AND SERVICE LINES

-

-

-

... More
Fixing of single phase meter box at the premises of existing/new consumer with 4 Nos Anchor fastners of rust proof size M-6x50 mm on the wall as per the position of the holes already provided on the meter box. The meter box must be housed perfectly vertical/plumb line,anchor fasteners are to be supplied/provided by the contractor (including self carriage from S/D store to consumer's site)

-

-

-

... More
IN URBAN AREA

-

-

-

... More
Plastic Box

1

59

59.34

... More
Metal Box

1

75

75.86

... More
IN RURAL AREA

-

-

-

... More
Plastic Box

1

77

77.2

... More
Metal Box

1

98

98.6

... More
Fixing of single phase meter cum meter box(complete unit) at the premises of existing/new consumerwith 4 Nos Anchorfastners of rust proof size M-6x50 mm on the wall as per the position of theholes already provided on the meter box. The meter box mustbe housed perfectly vertical/plumb line,anchor fasteners are to be supplied/provided by the contractor(including selfcarriage from S/D store to consumer's site and depositing removed meter and meter box if any in S/D Store.)

-

-

-

... More
IN URBAN AREA

1

76

76.02

... More
IN RURAL AREA

1

95

95.06

... More
Fixing of three phase meter box size 340x750x240 mm at the premises of existing/new consumers with 4 nos. Anchor fastners with rust proof size M-6x50 mm on the wall as per the position of holes already provided on the meter box. The meter box must be housed perfectly vertical/plumb line,anchor fasteners are to be supplied/provided by the contractor

-

-

-

... More
IN URBAN AREA

-

-

-

... More
Plastic Box

1

83

83.09

... More
Metal Box

1

106

106.87

... More
IN RURAL AREA

-

-

-

... More
Plastic Box

1

108

108.19

... More
Metal Box

1

138

138.89

... More
Fixing of three phase meter cum meter box(complete unit)at the premises of existing/new consumerswith 4 Nos Anchor fastners with rust proof size M-6x50 mm on the wall as per the positionof holes already provided on the meter box. The meter box must be housed perfectly vertical/plumb line,anchor fasteners are to be supplied/provided by the contractor including safe carriage from S/D store to consumers site and depositing removed meter and meter box if any in S/D store).

-

-

-

... More
IN URBAN AREA

1

104

104.51

... More
IN RURAL AREA

1

132

132.98

... More
Fixing of single phase energy meter in meter box by providing machine screws making holes on backelite sheet as per requirement & also making connections at meter terminals and MCB using Thimbles(by crimping) including providing M-seal compound inside meter box. The bakelite sheet must be fixed properly with Screws to restrict the movements vertically or horizontally. The meter is also required to be checked for proper functioning after making connections of service lines with distribution mains by licenced contractor only. The screws will be provided by contractor. Payment for lugs will be made extra @ Rs.1.00 per wire for single phase connection if not available with JVVNL& provided by contractor.(including safe carraige)

-

-

-

... More
IN URBAN AREA

1

37

37.94

... More
IN RURAL AREA

1

49

49.45

... More
Fixing/installation of three phase energy meter in meter box / M&P box by providing machine screws making holes backelite sheet as per requirement & also making connections at meter terminals and MCB using Thimbles(by crimping) including providing M-seal compound inside meter box. The bakelite sheet must be fixed properly with Screws to restrict the movements vertically or horizontally. The meter is also required to be checked for proper functioning after making connections of service lines with distribution mains by licenced contractor only. The screws will be provided by contractor. Payment for lugs will be made extra @ Rs.1.50 per wire for single phase connection if not available with JVVNL & provided by contractor.

-

-

-

... More
IN URBAN AREA

1

61

61.7

... More
IN RURAL AREA

1

80

80.3

... More
Replacement of defective energy meter at consumer's premises / meter installed in M&P box 3 Phase Transformer (3Phase meter) including fixing of screw and making connections at meter terminals with lugs(by crimping) & ensuring proper supply and perfect working of the meter installed. The work includes re-fixing of the meter box if not fixed properly the screw will be provided by the contractor. Payment for lugs will be made extra @ Rs. 1.00 per wire for single phase meter and @ Rs. 1.50 per wire for 3 phase meter, if not available with Discom and provided by the contractor. The removed meters shall be deposited with the concerned Junior Engineer Incharge with complete details in prescribed Performa of Discom.

-

-

-

... More
IN URBAN AREA

-

-

-

... More
Single phase energy meter

1

37

37.94

... More
Three phase energy meter

1

61

61.7

... More
IN RURAL AREA

-

-

-

... More
Single phase energy meter

1

49

49.45

... More
Three phase energy meter

1

80

80.29

... More
Laying of 1100 volt heavy duty armoured XLPE cable of aluminum coudctor of following size conforming to IS: 7098 (Pt-I) (latest amended) overhead service line from pole to meter terminals for release of new LT connections/replacement of damaged/obsolete service line (except agriculture one). The cable must be fixed on wall with clamps /hooks properly at a interval of one meter.

-

-

-

... More
2 Core 2.5/ 4/ 6 sq. Mm

1

4

4.71

... More
4 Core 6/10 sq. mm

1

7

7.08

... More
4 Core 16/25 sq. mm

1

8

8.26

... More
4 Core 50 sq. mm

1

11

11.8

... More
Removal of meter & meter box & service line of PDC consumers and depositing in Nigam's store including transporation.

-

-

-

... More
Three phase

1

230

230.41

... More
Single phase

1

213

213.73

... More
Fixing of spring load bus bar box with 4 Nos. anchor fastners of rust proof size M-8x75mm on the wall as per the position of the holes already provided on the box. The bus bar box must be housed perfectly vertical/ plumb line, anchor fastners are to be provided / supplied by the contractor ( including self carriage from S/d. store to site) including making terminations of the main cable from pole / tapping point to bus bar box and consumer's service lines from box to meter.

-

-

-

... More
Single phase bus bar box

1

136

136.02

... More
Three phase bus bar box

1

157

157.49

... More
Supply & fixing of cable holding lamp made of MS flat 30x4mm size, 200mm length in all (100+75+25mm) duly machined i.e. banding, drilling etc. as per drawing and painted by synthetic enamel paint (traditional pink colour) with 2nos. Anchor fastners of rust proof size M-6x65mm on the wall as per route of the cable laid surface mounted on the wall. The clamp must be installed perfectly in horizontal line anchor fastners are to be provided / supplied by the contractor ( including self carriage from S/dn. store to site).

1

103

103.32

... More
Supply & fixing of cable tray made of slotted anble painted by synthetic enamel paint (traditional pink colour) with minimum 2nos. Anchor fastners per meter length of rust proof size M-6x65mm on the wall as per rounte of the cables / service line to laid surface mounted on the wall. The cable tray must be installed perfectly in horizontal line, ancher fastners are to be provided/ supply by the contractor( including self carriage from S/dn. store to site)

-

-

-

... More
40x40mm 20 SWG

1

103

103.32

... More
NOTE:-

-

-

-

... More
The quality of material supplied by the contractor be got checked and approved by the Circle S.E.

-

-

-

... More
The nuts and bolts provided / supplied by the contractor will be confirmed to relevant ISS.

-

-

-

... More
CHAPTER-10: ERECTION OF 33KV SUB-STATIONS & BUS BAR

-

-

-

... More
Erection of steel supports in the excavated pit in alignment after checking then same with plumb line as per approved design and drawing of 33/11KV Sub- station.The support should be grouted and muffed in cement concrete ratio 1:3:6 as per chapter -5 code No.5.7.The remaining portion of the pit will be back filled with soil.The charges for grouting & muffing will be paid by extra as per chapter code no 5.7 The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Store issue rates.

-

-

-

... More
R.S.Joists

1

1621

1621.53

... More
Fabricated structure AB type

1

1868

1868.9

... More
Fabricated structure AB-1 type

1

1868

1868.9

... More
Isolator / C.T.structure

1

1868

1868.9

... More
Erection of PCC poles in excavated pit in alignment after checking the same with plumb line as per approved design & drawing of 33/11kv sub-station.The pit should be back filled with the soil with proper ramming below 30cm ground level and then muffed above 15cm average ground level with cement concrete ratio1:3:6.The charges for muffing will be paid extra as per chapter code no 5.7 The nuts & bolts will be supplied by the contractor for which payment will be made at the prevailing store issue rates.

-

-

-

... More
(A) IN URBAN AREA

-

-

-

... More
PCC Poles 8 Mtr. Long

1

352

352.75

... More
PCC Poles 9 Mtr. Long

1

537

537.12

... More
PCC Poles 10/11 Mtr. Long

1

611

611.21

... More
(B) IN RURAL AREA

-

-

-

... More
PCC Poles 8 Mtr. Long

1

280

280.89

... More
PCC Poles 9 Mtr. Long

1

408

408.99

... More
PCC Poles 10/11 Mtr. Long

1

471

471.87

... More
Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge.

-

-

-

... More
ACSR PANTHER

1

30

30.39

... More
ACSR DOG/RABBIT

1

23

23.47

... More
Supply, stacking & spreading of stone boulders 40 mm. Mono size.(Less voids 17%)

1

990

990.1

-

-

-

... More
The quality of material supplied by the contractor shall be got checked & approved by the circle SE.

-

-

-

... More
The nuts & bolts provided / supplied by the contractor will confirm to relevant ISS.

-

-

-

... More
CHAPTER-11: LAYING OF HT/LT CONTROL CABLE INSTALLATION OF C&R PANEL KIOSKS BREAKERS ETC.

-

-

-

... More
Laying of HT/LT control cable installation of C&R panel Kiosks Breakers etc.

-

-

-

... More
Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom.

-

-

-

... More
33 KV OCB

1

5013

5013.96

... More
33 KV VCB/SF-6 Breaker

1

5013

5013.96

... More
11 KV OCB/KIOSK

1

4062

4062.97

... More
11 KV VCB (Outdoor )

1

5013

5013.96

... More
11 KV VCB (Indoor )

1

4062

4062.97

... More
Installation of control panel including checking of wiring and conducting all pre-commissioning tests before energization, satisfactory operation of all equipment existing thereof. ( The relay will be tested by Discom ).

-

-

-

... More
33 KV Control Panel

1

1236

1236.88

... More
11 KV Control Panel

1

1236

1236.88

... More
Installation of current/potential transformers on supporting structure including checking of wiring & conducting all pre-commissioning tests before energization & satisfactory operation in all respect (The CT/PT set will be tested by Discom).

-

-

-

... More
33 KV CT(1 set of 3 Nos. ) OR PT Set

1

1236

1236.88

... More
11 KV CT(1 set of 3 Nos.) OR PT Set

1

1236

1236.88

... More
Erection & commissioning of battery set and battery charger including all required connection/wiring from battery set to battery charger and A.C.mains complete in all respect.

-

-

-

... More
110 Volts D.C.

1

1236

1236.88

... More
24 Volts D.C.

1

1236

1236.88

... More
Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags.

-

-

-

... More
2x2.5 Sq.mm.

1

13

13.43

... More
3x2.5 Sq.mm.

1

15

15.79

... More
4x2.5 Sq.mm.

1

18

18

... More
5x2.5 Sq.mm.

1

20

20.24

... More
10x2.5 Sq.mm.

1

22

22.44

... More
12x2.5 Sq.mm.

1

24

24.65

... More
4x4 Sq.mm.

1

20

20.24

... More
6x4 Sq.mm.

1

24

24.65

... More
Supply andFixing of metallic junction box size 450x300x250 mm outdoor type floor mounting fabricated out of cold rolled steel sheet 16 SWG with required branching and support of M.S. Angle 45x45x5mm The box should be printed with the coat of Zinc Chromate primer and 2 coats of light grey paint. Removal of gland plate of 3 mm. Thickness with rubber gasket for cable entry at bottom gland plate should be spacious to fix 6 Nos. cable glands of 25mm size double hinged door with pad lock provision should be gasket with foam & rubber to make junction box dust & water proof supply of junction box will include following items.

1

2543

2543.88

... More
The top cover of junction box should have slope of 10 mm so that water is not collected on top of the box.

-

-

-

... More
18 Nos. terminal blocks of 30 Amp. Bolted type with end plate and screws fixed on 36 cm mounting channel for terminal block with bolts & nuts of 25x9 Sq.mm.on side support inside junction box. The terminal blocks should be detachable type, which can be removed or added individually and suitable for 4/6 Sq.mm.coppers lugs. The terminal blocks should be preferably of GEC/Alsthom/ Essun/Malamin PVC or equivalent make.

-

-

-

... More
The supports of junction box made of M.S.Angle size 45x45x5mm with cleat having 1.2 meter length of each support should be grouted in cement concrete ratio 1:3:6.

-

-

-

... More
Laying, connecting, testing and commissioning of 1100 Volt PVC cable at 33/11 KV Sub-Station including connections of leads cutting stripping of cable insulation providing compression type terminals fixing of cable glands crimping of lugs clamping of cable cores etc. complete in all respect as per requirement of Engineer Incharge. PVC cable size.

-

-

-

... More
4 Core 6 Sq.mm. to 25 Sq.mm.

1

15

15.79

... More
3.5 Core 50 Sq.mm.to 95 Sq.mm.

1

33

33.66

... More
Supply,transportation and laying of sand layer of 75 mm below the power cable and 75 mm above the same alongwith using 200x100x75 mm size Class-II bricks in channel shape comprising of following sizes as under the back filling in the layer of compacted 100 mm thick earth,. Cable will be laid as per the methods of IS:1255 and details in 11.13

-

-

-

... More
For Single Power Cable, the trench width will be 350 mm using 20 Nos of bricks of above specification.

1

81

81.49

... More
For Double Power cable, the trench width will be 470 mm using 35 Nos of bricks of above specification.

1

136

136.67

... More
For Triple Power Cable, the trench width will be 590 mm using 50 Nos of bricks of above specification.

1

191

191.58

... More
Laying energisation & commissioning of underground cable for working voltage of 11 KV/33 KV Aluminium conductor ,Power cable XLPE/PILCA armoured in RCC class NP-2 Non-pressure pipes of sizes mentioned against each refilling of earth in the remaining excavated area making necessary connection including testing etc. as required (It includes providing, laying & jointing RCC class NP-2 Non-pressure pipes conforming to IS:458 of approved make with collars, jointed with CM 1:20 depth of cable shall be 1.2 meter. (Cable shall be provided by the Nigam).

-

-

-

... More
(A) 33 KV Cable

-

-

-

... More
3x185 sq. mm in pipe of dia 300 mm

1

539

539.33

... More
3x300 sq. mm in pipe of dia 300 mm

1

539

539.33

... More
(B) 11 KV Cable

-

-

-

... More
3x150 sq. mm in pipe of dia 250 mm

1

404

404.43

... More
3x185 sq. mm in pipe of dia 250 mm

1

404

404.43

... More
3x240 sq. mm in pipe of dia 300 mm

1

539

539.33

... More
3x300 sq. mm in pipe of dia 300 mm

1

539

539.33

... More
3x400 sq. mm in pipe of dia 300 mm

1

539

539.33

... More
Providing and fixing of G.I. Pipe B-Class (IS:1239 marks) at the starting and finishing point of 33 & 11 KV under ground cables and to lay & clamp vertically with the existing support including labour charges.

-

-

-

... More
Providing and fixing of G.I. Pipe of 125 mm diameter. B-Class (IS:1239 mark),at the starting and finishing point of 11 KV under ground cables and to lay & clamp vertically with the existing support including labour charges.

1

1375

1375.33

... More
Providing and fixing of G.I. Pipe of 150 mm diameter. B-Class (IS:1239 mark),at the starting and finishing point of 33 KV under ground cables and to lay & clamp vertically with the existing support including labour charges.

1

1559

1559.54

... More
Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S.

1

19775

19775.39

... More
The installation work to be carried out as per drawing/design, under the supervision of concerned Assistant Engineer

-

-

-

... More
Mounting structure

-

-

-

... More
The requisite steel members will be supplied by contractor including the hardware. Contractor shall joint/weld the members to form the mounting structure as per drawing. Necessary tools, welding, machines, lifting devices etc. shall be arranged by contractor.

-

-

-

... More
Civil works

-

-

-

... More
Erection of lattices in alignment including excavation and concreting of structure foundation including cement, sand and grit 20 mm size (crusher broken) having ratio 1:3:6 and grit 40 mm size for ratio 1:5:10 and curing for period as required (21 days). Area of concreting will be as per the drawing.

-

-

-

... More
Metering Equipments:

-

-

-

... More
The requisite metering equipments (CTPT set, meter,meter box & suitable conductors for jumpers), will be provided by the concerned Assistant Engineer in healthy condition at site. The cables from CTPT set to meter box laid down in 50 mm GI pipe with suitable bends & nipples, shall be provided by contractor alongwith the consumable items such as PVC tapes, petroleum jelly etc. The cable should be PVC multi strand copper 4 core 2.5/4 Sq. mm ISI marked and firm & tight connections shall be made by suitable connector e.g. at CTPT sets by using clamps and at meter/TTB by suitable lugs etc. The CTPT sets so installed shall be earthed by means of the MS Flat (size 50x6 mm) by joining it with the nearest earthing available at the sub-station. Requisite earthing material shall be made available by the contractor.

-

-

-

... More
Meter:

-

-

-

... More
Meters should be fixed firmly inside the tamper proof box, as per drawing. All the meter fixture will be provided by contractor including all consumables.

-

-

-

... More
Meter Box

-

-

-

... More
The meter box shall be provided by the concerned Assistant Engineer. However, hardware or any other items required to fix the meter inside the meter box will be provided by contractor. The meter box will be fixed firmly with sufficient strength at a place as per drawing. The test terminal block(TTB) link type shall be provided by contractor in the meter box.

-

-

-

... More
Painting:

-

-

-

... More
All surfaces interior and exterior of lattice structure shall be white aluminum painted.

-

-

-

... More
Commissioning of Metering Equipments:

-

-

-

... More
Installed meters inside the box and metering equipments duly mounted on the mounting structure will be powered up by connecting load in the presence of the concerned Assistant Engineer who will arrange the necessary shut down. The completion certificate shall be furnised by contractor.be filled accordingly. Since the work involves higher A.C. voltage level, the contractor shall take full care regarding safety norms, so as to avoid any accidental hazards.

-

-

-

... More
CHAPTER-12: PAINTING WORKS

-

-

-

... More
Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide)

-

-

-

... More
On new surface

1

32

32.47

... More
On old surface

1

24

24.35

... More
Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint)

-

-

-

... More
On new works with two coats.

1

48

48.7

... More
On old works with one coats.

1

34

34.55

... More
Spary painting on old surface with synthetic enamel paint (ICI Asian,Burger or equivalent make) to give an even shade (minimum two coats) with preparation of surface by rubbing applying primer coats and putty etc.complete in all respect on steel works / equipments.(including cost of paint)

1

111

111.58

... More
NOTE:-

-

-

-

... More
Rates are inclusive of paints brush ,sand paper spray gun and any scaffolding material,if required.

-

-

-

... More
Rates are inclusive of cleaning ,stains ,smear splashing and dropping of every kind from such places and things/equipments.

-

-

-

... More
The quality of material supplied by the contractor be got checked and approoved by the Circle S.E.

-

-

-

... More
NOTE:-

-

-

-

... More
Rates are inclusive of paints brush ,sand paper spray gun and any scaffolding material,if required.

-

-

-

... More
Rates are inclusive of cleaning , stains , smear splashing and dropping of every kind from such places and things/ equipments.

-

-

-

... More
The quality of material supplied by the contractor be got checked and approoved by the Circle S.E.

-

-

-

... More
CHAPTER-13: LIGHTING FIXTURES

-

-

-

... More
Instalation and commisioning of the following type of new fixtures including wiring and required connections to connect all allied accessories fixtures as required but without material.

-

-

-

... More
HPMV/HPSV lighting fixtures

1

179

179.18

... More
Halogen lamps/ flood light fixtures

1

144

144.21

... More
Tube light fixtures

1

102

102.72

... More
Supply and fixing of material as indicated here under:-

-

-

-

... More
PVC wire 2.5 sq.mm singal core aluminium

1

8

8.71

... More
G.I.pipe bracket 40mm dia of required size and shape including clamp of MS flat 40x4sq.mm with MS nuts & bolts and washers for HPMV / HPSV lighting fixtures.

1

299

299.49

... More
G.I. bracket 30mm dia of required size and shape including clamp of MS flat 40x4sq.mm with MS nuts & bolts and washers for HPMV / HPSV lighting fixtures.

1

266

266.56

... More
G.I.pipe bracket 16mm dia of required size and shape including clamp of MS flat 40x4sq.mm with MS nuts &bolts and washers for HPMV / HPSV lighting fixtures.

1

181

181.26

... More
Maintenance of existing lighting fixtures including replacement of all defective spares & wire if required and commissoning thereof.

-

-

-

... More
HPMV/HPSV lighting fixtures

1

194

194.54

... More
Halogen lamps/ flood light fixtures

1

111

111.43

... More
Tube light fixtures

1

65

65.54

... More
Note:-

-

-

-

... More
All spare parts / accessories required to be replaced will be provided by the Nigam.

-

-

-

... More
CHAPTER-14: FABRICATION

-

-

-

... More
Fabrication of steel structures of M.S angle, M.S.channel & M.S.Flat including cutting, drilling as per design and drawing.

-

-

-

... More
11/0.433 KV Substation Structure(185.83 Kg)

1

3437

3437.88

... More
33 KV Line D.P.sets (142.314 Kg)

1

3437

3437.88

... More
11 KV Line D.P.sets (100.493 Kg)

1

3437

3437.88

... More
1.8 Mtr Channel Bracket with clamp (19.271 Kg)

1

3437

3437.88

... More
1.4 Mtr Channel Bracket with clamp (14.462 Kg)

1

3437

3437.88

... More
33/11 KV Rural Sub-Station Structure (4086.879 Kg)

1

3437

3437.88

... More
Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing.

-

-

-

... More
33 KV Cross Arm (Angle ) with clamp and Top Hamper with clamp (22.849 Kg)

1

4427

4427.99

... More
33 KV Cross Arm (channel) with clamp and Top Hamper (26.831 Kg)

1

4427

4427.99

... More
11 KV Cross Arm angle with clamp and Top Hamper (13.797 Kg)

1

4427

4427.99

... More
33 KV D/C Lattice Structures (42' height)(508.06 Kg)

1

4427

4427.99

... More
LT Cross Arm 2' Long with clamp (4.12 Kg)

1

4427

4427.99

... More
LT Cross Arm 4' Long with clamp (7.27 Kg)

1

4427

4427.99

... More
Other steel items

1

4427

4427.99

... More
Cuting of steel article by using gas cutter / hacksaw blades.

-

-

-

... More
(A) MS Rails

1

3

3.23

... More
90 Lbs.rail

-

-

-

... More
75 Lbs.rail

-

-

-

... More
(B) R.S.Joist

1

3

3.23

... More
200x100mm

-

-

-

... More
116x100mm

-

-

-

... More
Drilling of holes in MS Channel / Angle /Flat

-

-

-

... More
15/16" dia holes(23.81 mm dia.)

1

6

6.49

... More
13/16" dia holes(20.63 mm dia.)

1

4

4.28

... More
11/16" dia holes(17.46 mm dia.)

1

4

4.28

... More
Drilling of holes in MS Rails / Joists.

-

-

-

... More
11/16" dia(17.46 mm dia.) holes in MS Rails

1

15

15.21

... More
11/16" dia (17.46 mm dia.) holes in R.S.Joist

1

10

10.77

-

-

-

... More
If fabrication work done in stores premises. Free accomodation and free electricity will be supplied by Nigam.

-

-

-

... More
CHAPTER-15: MAINTENANCE OF LINES

-

-

-

... More
Incharge Assistant/Junior Engineer after necessary inspection testing & checking will identify the maintenance works which will be categorised as below.

-

-

-

... More
Joint inspection & patrolling of lines,feeder wise for identification of maintenance work to be carried out.

1

75

75.86

... More
Removal of Bird's nest & foreign material from line.

-

-

-

... More
For Jaipur city circle

1

606

606.33

... More
For other District Headquarter

1

389

389.81

... More
For others

1

173

173.29

... More
(A)-Providing of numbering on single pole or double pole structure, feeder wise with good quality enamel paint as per requirement.

1

15

15.21

... More
(B)-Providing consumer coding feederwise/Transformerwise with good quality of paint as per requirement.

1

10

10.77

... More
Resagging of conductor section including binding/re-binding of conductor and providing of jumpers at the ends.

-

-

-

... More
With ACSR 'Panther'.

1

1732

1732.38

... More
With ACSR 'DOG'.

1

952

952.76

... More
With ACSR 'Rabbit' / 'Racoon'

1

801

801.18

... More
With ACSR 'Weasel/AAC'ANT.

1

498

498.15

... More
Resagging of earth wire including removing & fixing the wire in the earth clamps.

-

-

-

... More
G.I. Wire 6 SWG

1

368

368.11

... More
G.I. Wire 8 SWG

1

259

259.93

... More
G.I.Wire 10 SWG

1

238

238.23

... More
Replacement of earth wire including fixing/ replacement of earth reels & clamps, if required. Replacement of reels and clamps will be provided by the contractor .

-

-

-

... More
G.I. Wire 6 SWG

1

931

931.21

... More
G.I. Wire 8 SWG

1

822

822.87

... More
G.I. Wire 10 SWG

1

714

714.53

... More
Replacement of old conductor including binding of wire and providing jumpers at the ends.

-

-

-

... More
With ACSR 'Panther'.

1

7362

7362.57

... More
With ACSR 'DOG

1

2836

2836.87

... More
With ACSR 'Rabbit' / 'Racoon'.

1

2750

2750.37

... More
With ACSR 'Weasel/AAC'ANT.

1

1429

1429.21

... More
Replacement of defective/damaged pin insulators including binding rebinding of wire & replacement of pin if required.

-

-

-

... More
33 KV Pin Insulators.

1

25

25.98

... More
11 KV Pin Insulators.

1

19

19.48

... More
LT Pin Insulators.

1

10

10.77

... More
Replacement of defective/damaged 11 KV Disc Insulators including removing/providing jumpers with line conductor.

-

-

-

... More
With ACSR 'DOG'

1

320

320.44

... More
With ACSR'RACOON/RABBIT'

1

249

249

... More
With ACSR 'Weasel/'Squirrel'/ AAC'ANT

1

160

160.14

... More
If an additional disc is provided in case of 11 KV lines:

-

-

-

... More
(I) B&S type

1

23

23.76

... More
(ii) T&C type

1

17

17.27

... More
Replacement of defective/damaged LT Shackle insulators including removing/providing jumpers.

1

47

47.66

... More
Straightening of cross arms with clamp including tightening of nuts &bolts.

-

-

-

... More
33 KV cross arms

1

56

56.23

... More
11 KV cross arms

1

36

36.75

... More
LT Cross arms

1

17

17.27

... More
Change/replacement of cross arms with clamp including removing fixing of insulators, binding of wires & re-jumpering.

-

-

-

... More
33 KV cross arms

1

173

173.29

... More
11 KV cross arms

1

86

86.64

... More
LT Cross arms

1

32

32.47

... More
Straightening/replacement of top hampers including removal/fixing of pin insulators, tightening nuts & bolts with binding etc.

-

-

-

... More
33 KV top hampers

1

28

28.18

... More
11 KV top hampers

1

21

21.55

... More
Straightening of support/pole in alignment after removing the soil and checking the same with plumb line, refilling and ramming etc. PCC pole/M.S. rail/R.S.Joist.

-

-

-

... More
9 Mtr long & above.

1

188

188.49

... More
Upto 8 Mtr long.

1

123

123.4

... More
Replacement of broken/damaged poles in between the line with excavation of pit in alignment after checking the same with plumb line, re-fixing of cross arm bracket, top hampers, clamps insulators & binding/jumpering etc. and removal of broken pole.

-

-

-

... More
(A) 33 KV line support

-

-

-

... More
Double Circuit/Lattice Tower

1

2167

2167.65

... More
Single Circuit

1

1574

1574.29

... More
(B) 11 KV line support

-

-

-

... More
Double Circuit

1

1182

1182.28

... More
Single Circuit

1

998

998.36

... More
(C) L.T. line support

-

-

-

... More
Single phase line

1

851

851.06

... More
Three phase line

1

961

961.46

... More
Charges for excavation in ordinary /hard rock shall be paid as per item No. 2.2 & 2.3 of Chapter No.2.after deducting cost of excavation in ordinary soil.Civil work if required cost will be paid as per chapter No.5.7.

-

-

-

... More
Replacement/providing of broken damaged tension / cut point support with excavation of pit in alignment after checking the same with plumb line and re-fixing of cross arm/bracket, top hamper clamp,insulators & stays etc. with resagging of conductor, binding and jumpering including removal of broken pole.

-

-

-

... More
33 KV line support with ACSR PANTHER

-

-

-

... More
Double Circuit

1

5630

5630.18

... More
Single Circuit

1

4698

4698.98

... More
33 KV line support with ACSR 'DOG'/ 'RACOON'

-

-

-

... More
Double Circuit

1

4547

4547.54

... More
Single Circuit

1

3464

3464.75

... More
11 KV line support with ACSR 'DOG'/ 'RACOON'

-

-

-

... More
Double Circuit

1

4504

4504.14

... More
Single Circuit

1

3270

3270.06

... More
11 KV line support with ACSR WEASEL

-

-

-

... More
Double Circuit

1

2191

2191.4

... More
Single Circuit

1

1873

1873.04

... More
LT line support Three Phase line

-

-

-

... More
Double Circuit

1

1621

1621.96

... More
Single Circuit

1

1479

1479.09

... More
LT line support Single Phase line

1

1281

1281.91

... More
Replacement/ Fixing of stay wire including guy insulator & stay clamp.

-

-

-

... More
G.I. Stay wire 7/8 SWG

1

335

335.79

... More
G.I. Stay wire 7/10 SWG

1

240

240.44

... More
Replacement/ providing of stay set including excavation of pit & back filling with soil & proper ramming fastening clamping of stay wire with stay insulators.

-

-

-

... More
G.I. Stay set 8'x3/4"

1

452

452.54

... More
G.I. Stay set 6'x5/8"

1

376

376.82

... More
Replacement/tightening of jumpers on cut points and re-binding including fixing/replacement of P.G. clamps which will be provided by the contractor for which payment will be made as per prevailing store issue rates.

-

-

-

... More
33 KV line

1

38

38.97

... More
11 KV line

1

38

38.97

... More
L.T.line

1

17

17.27

... More
Repair, jointing of damaged conductor with repair sleeves including resagging (section to section), binding and making jumpers at end points.

-

-

-

... More
With ACSR 'Panther'.

1

7362

7362.57

... More
For additional joint on the same conductor

1

433

433.06

... More
With ACSR 'DOG'

1

1169

1169.28

... More
For additional joint on the same conductor

1

108

108.19

... More
With ACSR 'Rabbit'/ 'Racoon'

1

1082

1082.8

... More
For additional joint on the same conductor

1

108

108.19

... More
With ACSR 'Weasel/AAC'ANT.

1

627

627.9

... More
For additional joint on the same conductor

1

108

108.19

... More
Binding of conductor on pin insulators.

-

-

-

... More
33 KV pin insulators

1

12

12.99

... More
11 KV pin insulators

1

8

8.71

... More
L.T. pin insulators

1

4

4.28

... More
Fixing of line spacer on LT line conductor.(For LT lines having span upto 40 Meters at two appropriate places and for LT lines above 40 Meters span at three appropriate places spacers are to be installed)

-

-

-

... More
Single phase 2- wire (1 spacer 15")

1

9

9.16

... More
Three phase 4- wire (1 spacer 21")

1

17

17.86

... More
Three phase 4- wire (4 spacer 15")

1

21

21.55

... More
Fixing of extension pieces/ brackets for raising of pole height including fixing of pin insulators with pins & rebinding etc.

-

-

-

... More
33 KV line

1

303

303.17

... More
11 KV line

1

238

238.23

... More
LT line

1

108

108.19

... More
Sectionalising of existing line including replacement of bracket,insulators with pin/hardware's providing of stay sets with stay wire and stay insulators, jumpering & binding etc.

-

-

-

... More
33 KV line S/C with ACSR 'Dog'/ 'Racoon'.

1

2706

2706.82

... More
11 KV line S/C with ACSR 'Dog'/ 'Racoon'.

1

2620

2620.19

... More
11 KV S/C line with ACSR 'Weasel'.

1

1515

1515.85

... More
LT line three phase

1

671

671.28

... More
Lt line single phase

1

623

623.61

... More
Replacement of defective / damaged overhead ABC conductor (Areal bunched cable) on existing erected pole / support using existing Suspension & Dead End Clamps including laying, Jointing,stringing complete in all respect & dismentalling of old ABC Conductor (Aerial Bunched Cable) and depositing it to concern ACOS/ Sub-divisional store. If in any case new Suspension / Dead End Clamps / connectors are required then same may be dealt with item No.7.7, 7.8, 7.9 & 7.10. (The payment shall be made in accordance with the quantity mentioned in the MCN. Since the qty in the MCN is by weight, as such for converting into KM refer Measured Weight of Material of CLRC). Rates are inclusive of dismentalling charges.

-

-

-

... More
1CX25 + 25 Sq mm

1

2584

2584.29

... More
3Cx16+25 Sq mm

1

3876

3876.42

... More
3Cx25 + 25 Sq mm

1

4522

4522.5

... More
3Cx50 + 35 Sq mm

1

5685

5685.41

... More
Carrying out petrolling on 11 KV Feeder / LT Feeder and also to provide Single Line Diagram along with Pole Schedule indicating the following activities:- (1 Skilled (ITI Holder) & 2 Semi Skilled persons are to be engaged for this purpose)

-

-

-

... More
LT Line :-

1

36

36.09

... More
Condition of Pole i.e Tilted / Broken.

-

-

-

... More
Condition of Stay Sets i.e. Loose / Broken / Without Guy Insulator / Proper Clamping with Pole or any additional requirement of Stay Sets (if required)

-

-

-

... More
Position of Fixtures i.e. Cross Arm / Top Hamper / Channel Bracket / Angle Bracket etc whether Tilited or Properly Mounted.

-

-

-

... More
Position of Insulators along with Hardwares i.e. Pin Insulators / Shackel Insulators

-

-

-

... More
Position of Jumpering / Binding / PG Clamps (where required) / D Loope (required in LT Line) Pin Insulators.

-

-

-

... More
Position of Sag of Conductor & its clearance from the Ground Level / Adjoining Conductor / Line.

-

-

-

... More
Indicating the Kacha / Pacca Road on the Single Line Diagram and the ground clearance of every span from the Ground Level.

-

-

-

... More
Condition of Conductor and Size / Type of Conductor used in the Feeder.

-

-

-

... More
Distance betwwen consecutive poles.

-

-

-

... More
Condition of Aerial Bunched Cable / Insulated Rabbit Conductor and their Hardware accessories along with pin pointing the cut in AB Cable.

-

-

-

... More
Identifyng the High Risk Points like 220 KV / 132 KV Crossings, Highway Crossings / Railyway Crossings / Double Current (Feeding single pole from Two Different Sources).

-

-

-

... More
Position of Earth wire / Neutral Wire / Guarding.

-

-

-

... More
HT Line:-

1

45

45.11

... More
Condition of Pole i.e Tilted / Broken.

-

-

-

... More
Condition of Stay Sets i.e. Loose / Broken / Without Guy Insulator / Proper Clamping with Pole or any additional requirement of Stay Sets (if required)

-

-

-

... More
Position of Fixtures i.e. Cross Arm / Top Hamper / Channel Bracket / Angle Bracket etc whether Tilited or Properly Mounted.

-

-

-

... More
Position of Insulators along with Hardwares i.e. Pin Insulator / Disc Insulators etc.

-

-

-

... More
Position of Jumpering / Binding / PG Clamps (wherever required) on Disc Insulators / Pin Insulators.

-

-

-

... More
Position of Sag of Conductor & its clearance from the Ground Level / Adjoining Conductor / Line.

-

-

-

... More
Indicating the Kacha / Pacca Road on the Single Line Diagram and the ground clearance of every span from the Ground Level.

-

-

-

... More
Condition of Conductor and Size / Type of Conductor used in the Feeder.

-

-

-

... More
Distance betwwen consecutive poles.

-

-

-

... More
Condition of Aerial Bunched Cable / Insulated Rabbit Conductor and their Hardware accessories along with pin pointing the cut in AB Cable.

-

-

-

... More
Position of 11/0.4 KV or 6.35 / 0.24 KV D.P. Structure [ Position of G.O. / D.O / Horgap Fuse Set / Jumpering / L.A. / Pillar Box / Earthing (Neutral / Body / L.A)] along with measurement of earth resistance detailed as below for which charges shall be paid extra, if applicable:-

-

-

-

... More
Height of Single Phase Transformer

-

-

-

... More
Identifyng the High Risk Points like 220 KV / 132 KV Crossings, Highway Crossings / Railyway Crossings / Double Current (Feeding single pole from Two Different Sources).

-

-

-

... More
Position of Earth wire / Neutral Wire / Guarding.

-

-

-

... More
Position of Line G.O. & its Jumpering.

-

-

-

... More
Condition of Distributon Trnasformer like oil leakage, jumper condition on HV / LV side, silica gel etc

-

-

-

... More
To repair the cut in AB Cable / unsealed points by using m-seal/ self amalgamation tape (material shall be provided by conyractor). Details are to be provided to concerned JEN/AEN alongwith site location.

1

45

45.11

... More
Providing and fixing of M-seal compound on consumer's tapping (single phase as well as three phase) in the case of overhead LT lines. The location shall be identified/decided by the AEN/JEN concerned.

-

-

-

... More
Single phase tapings

1

27

27.07

... More
3-Phase tapings

1

49

49.63

... More
Fixing of M-seal compond on consumer's tapping (single phase as well as three phase) in the case of overhead LT lines. The location shall be identified/decided by the AEN/JEN concerned.

-

-

-

... More
Single phase tapings

1

9

9.02

... More
3-Phase tapings

1

22

22.56

... More
To Supply & Replace the damaged / defective parts of 11 KV G.O. switch (Proper shut down will be provided by Nigam). Rates are inclusive of material.

-

-

-

... More
11 KV G.O (400 Amps)

-

-

-

... More
Contacts / Jaws with Terminal Plate

1

479

479.14

... More
Centre Blade / Pipe

1

1035

1035.87

... More
Post Insulator (12 KV)

1

215

215.66

... More
PG Clamp

1

91

91.14

... More
Identifying the unused material erected/ lying in the field,dismentalling from site, their safe carriage including loading & un-loading and deposition of same in concerded ACOS of S/Dn (PCC poles shall be deposited with concerned Sub-Division or Sub-office) MCN is mandatory in case of ACOS or Receipt of concerned AEN for PCC poles.

-

-

-

... More
PCC poles (All sizes)

-

-

-

... More
Within 10 Kms.

1

396

396.91

... More
Above 10 Kms. & upto 30 Kms. Add for each Km. or part thereof.

1

4

4.94

... More
Above 30 Kms. Add for each Kms. or part thereof

1

2

2.54

... More
Steel( fabricated and unfabricated) i.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat and G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts , ACSR Conductor, Insulators (usable), Hardwares,cables etc.

-

-

-

... More
Within 10 Kms.

1

1409

1409.28

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

4

4.8

... More
Above 30 Kms. Add for each Kms. or partthereof.

1

2

2.97

... More
Fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators, Line structures etc.

-

-

-

... More
Within 10 Kms.

1

3427

3427.27

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof.

1

4

4.8

... More
Above 30 Kms. Add for each Kms or part thereof.

1

3

3.66

... More
Note:-

-

-

-

... More
Since only the Nigam employee is empowerd to work on live line / equipment,thus the Executive Engineer Shall ensure the following from the contractor while engaging Pvt. person (ITI Holder) for working on Live Line / Equipments:-

-

-

-

... More
At the joining, the contractor should submit Accidental Insurance Cover in advance for One Year for the engaged person.

-

-

-

... More
The contractor should submit age proof, copy of ITI Certificate for the engaged person.

-

-

-

... More
The contractor should submit proof of deduction of PF (if applicable) and deposition of same with PF department along with bill otherwise submit exemption certificate for the engaged person.

-

-

-

... More
The person should submit work experience for live line work or should submit a certificate to be issued from Electrical Inspector for working on Live Line.

-

-

-

... More
Identity Card with Photo for the deployed person should be issued by Circle SE and proper record of it should be maintain at circle level.

-

-

-

... More
Monthly / Routine verification of the deployed person should be done by circle office.

-

-

-

... More
Rates for providing and fixing M-seal (putty) compound on HT bushings of Distribution Transformers be also considered on the same rate terms and conditions as detailed above for 3-phase connections.

-

-

-

... More
CHAPTER-16: MAINTENANCE OF 11/0.4KV SUB-STATION

-

-

-

... More
General maintenance of distribution transformer as under:-

-

-

-

... More
Cleaning of dust and oil scale deposits outside the body of transformer with detergent and water.

-

-

-

... More
Tightening all nut and bolts.

-

-

-

... More
Tightening of bushing rod from outside.

-

-

-

... More
Replacement of jumpers and fixing connectors.

-

-

-

... More
Checking and maintenace of breather and explosion.

-

-

-

... More
Making of oil level with tested transformer oil.

-

-

-

... More
Up to 40 KVA transformer

1

200

200.44

... More
Above 40 KVA and Up to 100 KVA transformer

1

301

301.85

... More
Above 100 KVA transformer up to 315 KVA

1

401

401.01

... More
Above 315 KVA transformer up to 630 KVA

1

480

480.29

... More
Above 630 KVA

1

577

577.26

... More
Providing and replacement of damaged L.T. side bushing rod made of brass on the various size of distribution transformer as under:

-

-

-

... More
25 to 160 KVA 12 mm

1

132

132.25

... More
200 to 315 KVA 20mm

1

293

293.14

... More
abobe 315 KVA 30mm

1

293

293.14

... More
Providing and replacement of damaged HT side bushing rod made of brass on the various size of distribution transformer as under:

-

-

-

... More
25 to 750 KVA

1

127

127.83

... More
Providing and replacement of damaged LT side porcelain bushing on the various size of distribution transformer as under:

-

-

-

... More
25 to 160 KVA 1.1 KV 250 Amp.

1

26

26.43

... More
200 to 315 KVA 1.1 KV 630 Amp.

1

33

33.07

... More
abobe 315 KVA 1.1 KV 1000 Amp.

1

33

33.07

... More
Providing and replacement of damaged HT side Porcelain bushing on the various size of distribution transformer as under:

-

-

-

... More
25 to 750 KVA 11 KV 250 Amp.

1

143

143.32

... More
Providing and replacement of damaged rubberized cork gasket washer on bushing on the various size of distribution transformer as under:

-

-

-

... More
LT side

1

33

33.07

... More
HT side

1

55

55.06

... More
Providing and fixing silica gel breather with coupling on the various size of distribution transformer ,if not available as under.

-

-

-

... More
Up to 160 KVA

1

242

242.35

... More
More Then 160 KVA

1

264

264.34

... More
Providing and replacement of damaged top cover tank rubberized cork gasket on the various size of distribution transformer as under:

-

-

-

... More
25 KVA

1

66

66.12

... More
40 KVA

1

77

77.05

... More
63 KVA

1

88

88.11

... More
100 KVA

1

88

88.11

... More
160 KVA

1

132

132.25

... More
200 KVA

1

132

132.25

... More
250 KVA

1

165

165.17

... More
315 KVA

1

881

881.31

... More
500 KVA

1

991

991.58

... More
630KVA

1

991

991.58

... More
750 KVA

1

2203

2203.37

... More
Providing and replacement of defective drain valve made of gun metal on the various size of distribution transformer as under:

-

-

-

1

220

220.36

1

330

330.47

... More
Providing and fixing of 'L' type connectors made of copper flat (size 50x6) having a size 9" suitable bend to connect on the LT side of the transformer and should have at least 2 Nos.of hole to connect two no of LT Cable.

1

198

198.37

... More
Providing and filling of transformer oil top up in the transformer where the oil value are within permissible limits(Oil level should not be below the core of the transformer.

1

57

57.26

... More
Providing and replacement of transformer oil in those transformer where the oil value are not within permissible limits.

-

-

-

... More
Fresh oil as per IS:335

1

57

57.26

... More
Buy back price of the oil taken out from the such transformer.

1

21

21.99

... More
Rapairs and maintenance of 11 KV isolators including replacement of damaged post insulator G.O.jaws/blades, clamps and checking of operating mechanism with oiling /greasing for smooth operation.

1

301

301.85

... More
Maintenace of 11 KV Horn gap fuse set including replacement of parts post insulator etc.

1

125

125.6

... More
Replacement / fixing of complete 11 KV isolator /G.O.switch with all accessories including jumpers.

1

903

903.44

... More
Replacement /fixing of 11 KV horn gap fuse set(3limbs) in place of damaged H.G.fuse set /D.O.fuse set including modification of the structure etc..

1

502

502.43

... More
Replacement / fixing of 11 KV lightening arrestors including jumpers and earth connections.

1

55

55.06

... More
Replacement of damaged distribution transformer by new / repaired transformer including making connections on HV and LV side body and neutral earthing & testing & commissionig of the transformer.The above work includes lifting of transformer from sub-divisional store and transportation upto site and also depositing damaged / removed transformer in sub-divisional store.

-

-

-

... More
Up to 40 KVA

1

1533

1533.97

... More
Above 40 KVA and up to 100 KVA

1

1884

1884.23

... More
Above 100 KVA and up to 315 KVA

1

2437

2437.42

... More
Above 315 KVA and up to 630 KVA

1

4140

4140.58

... More
Above 630 KVA

1

4821

4821.44

... More
Repair and maintenance of LT piller box,Knife switch etc. including replacement of damaged bus bars, fuse units,U contact and insulators etc.

1

350

350.25

... More
Replacement of L.T.fuse board / I.C.T.P/MCB.switch with clamp including Clamping & making cable connections complete in all respect.

1

30

30.84

... More
Measurement of load during peak hours on each phase on L.V side of distribution transformer on outgoing feeders. by clip on Ammeter/Tong tester.

1

74

74.98

... More
To supply & replace burnt / damaged flexible PVC Wire, Lugs and Bakelite Sheet in M&P Box of different ratings of Three Phase & Single Phase transformers in Nigam store:- Note:- (Out going cables is also to be connected on the output terminals duly tightened & crimped properly for out going connections for which required cable shall be provided by Nigam.MCCB shall be provided by Nigam.

-

-

-

... More
Three Phase Transformer:-

-

-

-

... More
25 /40KVA (PVC Wire: 25 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

1416

1416.66

... More
10/16 KVA (PVC Wire: 16 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

976

976.32

... More
Single Phase Transformer:-

-

-

-

... More
25 KVA (PVC Wire: 70 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

591

591.93

... More
16 KVA (PVC Wire: 35 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

402

402.44

... More
10 KVA (PVC Wire: 25 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

333

333.86

... More
5 KVA (PVC Wire: 10 Sq.mm, Lugs: As per Drawing (Annexure-I) & Backalite Sheet)

1

192

192.2

... More
Spary painting on the surface with synthetic enamel paint (ICI Asian,Burger or equivalent make) to give an even shade (minimum two coats) with preparation of surface by rubbing applying primer coats of red oxide (minimum two coats) and putty etc.complete in all respect on M&P Boxes of Transformers .(including cost of paint & Red oxide)

-

-

-

... More
Three Phase Transformer:-

-

-

-

... More
10 KVA & 16 KVA

-

-

-

... More
On new surface

1

172

172.15

... More
On old surface

1

162

162.44

... More
25 KVA & 40 KVA

-

-

-

... More
On new surface

1

235

235.11

... More
On old surface

1

221

221.84

... More
Single Phase Transformer:-

-

-

-

... More
5/10/16/25 KVA

-

-

-

... More
On new surface

1

66

66.26

... More
On old surface

1

62

62.53

... More
NOTE:-

-

-

-

... More
Rates are inclusive of paints brush ,sand paper spray gun and any scaffolding material,if required and also inclusive of cleaning ,stains ,smear splashing and dropping of every kind from such places and things/equipments. The quality of material supplied by the contractor be got checked and approoved by the Circle S.E.

-

-

-

... More
To supply Iron Clits made of Flat size 90MMX90MMX3MM thick & weld it continiously, 2 Nos on each side (Total Six Nos) in case of Three Phase Transformer except bottom side of M&P Box in Nigam store.

1

421

421.84

... More
To supply Iron Clits made of Flat size 90MMX90MMX3MM thick & weld it continiously, 1 No on each side (Total Three Nos) in case of Single Phase Transformer except bottom side of M&P Box in Nigam store.

1

210

210.94

... More
To Supply and Install / Weld the Meter cover on Three Phase Transformer in Nigam store.

-

-

-

... More
Rating: 10 KVA & 16 KVA

-

-

-

... More
The cover shall be supplied with accessories ( Cover Size 650X550, Glass, Kabja, LED, Fabrication Charges, Paint, Shocker, Lock) along with Iron Clits made of Flat size 90MMX90MMX3MM thick (Clits should be welded continiously) 2 Nos on each side (Total Six Nos) except bottom side of M&P Box of Three Phase Transformer

1

837

837.69

... More
Rating: 25 KVA & 40 KVA

-

-

-

... More
The cover shall be supplied with accessories ( Cover Size 810X685, Glass, Kabja, LED, Fabrication Charges, Paint, Shocker, Lock) along with Iron Clits made of Flat size 90MMX90MMX3MM thick (Clits should be welded continiously) 2 Nos on each side (Total Six Nos) except bottom side of M&P Box of Three Phase Transformer

1

994

994.79

... More
To Supply and Install / Weld the Meter cover on Single Phase Transformer in Nigam store.

-

-

-

... More
Rating: 5 KVA / 10 KVA / 16 KVA / 25 KVA

-

-

-

... More
The cover shall be supplied with accessories ( Cover Size 220X370, Glass, Kabja, LED, Fabrication Charges, Paint) along with Iron Clits made of Flat size 90MMX90MMX3MM thick (Clits should be welded continiously) 1 No on each side (Total Three Nos) except bottom side of M&P Box of Single Phase Transformer

1

375

375.01

... More
Replacement of damaged distribution/pillar boxes duly painted Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide),Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint),Spary painting on old surface with synthetic enamel paint (ICI Asian,Burger or equivalent make) to give an even shade (minimum two coats) with preparation of surface by rubbing applying primer coats and putty etc.complete in all respect on steel works / equipments.(including cost of paint)

-

-

-

... More
Cost of 18 gauge doors with installation & paint/sq.ft.

1

63

63.16

... More
Cost of Hinges with installation /piece

1

14

14.44

... More
Cost of Rivet(Kundah) with installation /piece

1

12

12.63

... More
Preparation of spikes made of M.S.Rod of 20 MM dia and 3.0 Mtr. Long length as per design and reqiurement to be driven in earth by mechanical means and providing & fastening of suitable clamps with the M.S.Rod, connection of earth wire/stay wire/MS flat in clamp depending on soil.(refer clause 8.3.4)

-

-

-

... More
Where drilling is not required.

1

149

149.85

... More
Where drilling is equired.

1

490

490.56

-

-

-

... More
The quality of material supplied by the contractor shall be got checked & approved by the circle SE.

-

-

-

... More
CHAPTER-17: OPERATION AND MAINTENANCE OF 33/11 KV SUB-STATION

-

-

-

... More
Incharge Assistant/Junior Engineer after necessary inspection testing& checking will identify the maintenance work which will be categorised as below:

-

-

-

... More
Labour charges for over all inspection of sub-station with two transformer for job requiring works analysis and testing of dielectric strength of oil, insulation resistance value and earth resistivity etc.

1

886

886.2

... More
Add for each power transformer.

1

296

296.24

... More
Labour charges for opening the transformer tank top cover(if required to facilitate maintenance of transformer) after removing required accessories.Including all required T&P Up to 5 MVA transformer.

1

4322

4322.89

... More
Preventing oil leakage by changing main gasket with material after removing cover.

-

-

-

... More
Upto 1.6 MVA transformer

1

1515

1515.25

... More
Above 1.6 MVA & upto 3.15 MVA transformer.

1

1878

1878.35

... More
Above 3.15 MVA & upto 5 MVA transformer.

1

2074

2074.96

... More
Change of HV/LV bushing gasket ring and rubber washers including supply of required material & draining /re-filling of oil as required.

1

1080

1080.72

... More
(a) For additional HV/LV bushing work.

1

194

194.54

... More
* This amount will not be payable incase the work of removing of Top cover gasket is also awarded in the same order.

-

-

-

... More
Change of gaskets of valves/radiator / Buchhloze's Relay including cost of gaskets etc.

-

-

-

... More
Valve's/Buchhloze's Relay

1

121

121.03

... More
Radiator Valves.

1

289

289.59

... More
Providing & Fixing (including replacement) of HV/LV bushing of reputed make & bushing rod of brass matel including cost of gasket & rubber rings .Gasket makes are TABROSS,TIGER, ZEBRA and any other reputed make.

-

-

-

... More
HV Side

-

-

-

... More
Upto 1.6 MVA transformer

1

1331

1331.48

... More
Above 1.6 MVA & upto 3.15 MVA transformer.

1

2541

2541.81

... More
Above 3.15 MVA & upto 5 MVA transformer.

1

2541

2541.81

... More
LV Side

-

-

-

... More
Upto 1.6 MVA transformer

1

520

520.89

... More
Above 1.6 MVA & upto 3.15 MVA transformer.

1

1785

1785.36

... More
Above 3.15 MVA & upto 5 MVA transformer.

1

1785

1785.36

... More
Dehydration/Filteration and reconditioning of transformer oil (electricity shall be supplied by deptt.) as per norms and testing thereof in presence of sub-station Incharge.

1

4

4.28

... More
Cleaning of oil scale deposits over the body and radiators of power transformer with thinner/detergent and de-rusting in perfect manner.

-

-

-

... More
Upto 1.6 MVA transformer

1

1048

1048.4

... More
Above 1.6 MVA & upto 3.15 MVA transformer.

1

1299

1299.03

... More
Above 3.15 MVA & upto 5 MVA transformer.

1

1517

1517.33

... More
Replacement of oil temperature indicator, Winding temperature indicator,silica gel container ,Presser relief device ,Magnetic oil level gauge,.Gas operated Buchhloz relay (including all required accessories.)

-

-

-

... More
Oil temperature indicator

1

2053

2053.41

... More
WindingTemperature indicator

1

2053

2053.41

... More
Silica gel container

1

2053

2053.41

... More
Presser relief device Make ATBUS

1

5619

5619.7

... More
Magnetic oil level gauge.Make ATBUS

1

4538

4538.98

... More
Gas operated Buchhloz relay( Double floating type make ATBUS)

1

4538

4538.98

... More
Spray Painting of the power transformer from out side with two coats of synthetic enamel paint of required shade after cleaning the body and radiators with preparation of surface by rubbing & applying primer coats and putty etc. and making smooth surface with the fine emary cloth including required material and tools.

-

-

-

... More
5 MVA Transformer

1

3242

3242.17

... More
2.5MVA/3.15 MVA Transformer

1

2701

2701.8

... More
1.6 MVA Transformer

1

2377

2377.53

... More
Checking, tightening & replacement of jumpers, clamps connectors of bus bar including transformer & equipments of sub-station.Material to be provided by Nigam ,If required.

-

-

-

... More
33/11 KV S/S with 1 power transformer

1

1219

1219.03

... More
33/11 KV S/S with 2 power transformer

1

1612

1612.38

... More
33/11 KV S/S with 3 power transformer

1

2077

2077.16

... More
Replacement of damaged bus bar conductor including re-jumpering etc.

-

-

-

... More
Bus Bar with ACSR PANTHER

1

639

639.84

... More
Bus Bar with ACSR DOG/RACOON

1

417

417.27

... More
Replacement of damaged pin/post insulators including re-binding and jumpering etc.

-

-

-

... More
33 KV Pin/Post Insulator

1

17

17.27

... More
11 KV Pin/Post Insulator

1

12

12.99

... More
Replacement of damaged disc insulator with hardware, if required including jumpering etc.

-

-

-

... More
On 33 KV side

1

155

155.58

... More
On 11 KV side

1

105

105.98

... More
Replacement of damaged jumpers including fixing P.G. clamps, 'T' clamps and connectors at both ends. Including proper tightaning of M.S. Nuts & Bolts.

-

-

-

... More
ACSR PANTHER

1

82

82.05

... More
ACSR DOG/RACOON

1

36

36.75

... More
Replacement of 33 KV/11 KV lightening arrestors including jumpering and earth connections etc. in all respect.

-

-

-

... More
33 KV L.A.

1

164

164.28

... More
11 KV L.A.

1

54

54.02

... More
Repair & maintenance of 33 KV/11 KV Isolator/ G.O. Switch for smooth operation including replacement of G.O. clamps, jaws, blades & post insulators etc. and checking of operating mechanism, oiling/greasing complete in all respect.

-

-

-

... More
33 KV Isolator/ G.O. Switch

1

443

443.1

... More
11 KV Isolator/ G.O. Switch

1

296

296.24

... More
Welding of fabricated MS Sheet box of 2 mm thickness for locking arrangement of power transformer valves to curb transformer oil having dimensions

-

-

-

... More
200x160x180 mm for filter valve of Power Transformer

1

442

442.8

... More
160x100x120 mm for conservator drain valve

1

299

299.63

... More
40x 50x40 mm for radiator air release cap

1

97

97.41

... More
60x 50x60 mm for conservator cap

1

101

101.84

... More
Removing of unwanted grass / small plants from the 33 / 11 KV Sub- Station

-

-

-

... More
From gravelled land / area

1

197

197.79

... More
From un- gravelled land / area

1

128

128.49

... More
Measurement of earth resistance :-

-

-

-

... More
By providing earth resistance tester by contractor.

1

22

22.56

... More
By providing earth resistance tester by Nigam.

1

18

18.05

... More
Carrying out following activities at 33/11 KV S/s . The necessary material , T&P & safety devices required for maintenance shall be provided by Nigam. Applicable statuary deductions shall be made as per rules.

-

-

-

... More
Providing one skilled person (ITI holder) for shift duty (Per shift of 8 Hrs.) Note:- Engagement of Skilled person is subject to fulfilment of note conditions 1 to 4 given below the chapter.

1

297

297.18

... More
Providing 1 semi-skilled labour for shift duty (Per shift of 8 Hrs.) for assisting in performing the activities as below. Note:- Engagement of Semi-skilled person is subject to fulfilment of note conditions 1 & 3 given below the chapter.

1

284

284.58

... More
To ensure un interrupted power supply during Block hours on the feeders eminating from GSS as directed by AEN / JEN and to maintain porper Log Sheet

-

-

-

... More
To register ON / OFF timimgs of 33 KV feeders in the Log Sheet.

-

-

-

... More
To ensure the Breaker OFF Position , Isolation of 11 KV G.O. Switch & proper earthing by earthing chain before permitting the Shut Down of 33KV / 11 KV Feeders.

-

-

-

... More
Maintain the 33/11KV S/S like repairing the jumpers, change of faulty Disc / Pin Insulator, cleaning of Switch Yard, watering the earthing pits, cleaning & caring the equipments.

-

-

-

... More
Replacing the burnt Fuse during Single Phase & Three Phase supply.

-

-

-

... More
To record the tripping for the & type of fault occurred in any 33 KV / 11 KV feeder and give a try for restoring the supply, if the breaker does not hold i.e. feeder remain faulty then message should be immediately conveyed to the Line man of respective feeder and also to concerned officer.

-

-

-

... More
If any defect has been observed in the installed equipments at the S/S, then message should be immediately conveyed to the concerned JEN / AEN

-

-

-

... More
Keeping watch & ward of Nigam material lying at the premisis of S/S.

-

-

-

... More
Properly hand over the shift to next shift duty staff indicating the position of all equipments / fedders.

-

-

-

... More
To Supply & Replace the damaged / defective parts of 33 KV G.O. switch (Proper shut down will be provided by Nigam). Rates are inclusive of material.

-

-

-

... More
33 KV G.O (800 Amps)

-

-

-

... More
Contacts / Jaws with Terminal Plate

1

1365

1365.22

... More
Centre Blade / Pipe

1

2589

2589.68

... More
Post Insulator (24 KV)

1

347

347.39

... More
PG Clamp

1

251

251.75

... More
To Supply & Replace the damaged / defective parts of 11 KV Roaster Switch (Proper shut down will be provided by Nigam).Rates are inclusive of material.

-

-

-

... More
Contacts / Jaws with Terminal Plate

1

479

479.14

... More
Centre Blade / Pipe

1

659

659.6

... More
Post Insulator (12 KV)

1

215

215.66

... More
PG Clamp

1

91

91.14

... More
NOTE : The Rates are inclusive of all applicable Taxes/ Duty except GST which will be paid extra by Nigam if applicable after production of documentary evidence.

-

-

-

... More
Note:- Since only the Nigam employee is empowerd to work on live line / equipment,thus the Executive Engineer Shall ensure the following from the contractor while engaging Pvt. person (ITI Holder) for working on Live Line / Equipments:-

-

-

-

... More
1. At the joining, the contractor should submit Accidental Insurance Cover in advance for One Year for the engaged person.

-

-

-

... More
2. The contractor should submit age proof, copy of ITI Certificate for the engaged person.

-

-

-

... More
3. The contractor should submit proof of deduction of PF (if applicable) and deposition of same with PF department along with bill otherwise submit exemption certificate for the engaged person.

-

-

-

... More
4. The person should submit work experience for live line work or should submit a certificate to be issued from Electrical Inspector for working on Live Line.

-

-

-

... More
5 Identity Card with Photo for the deployed person should be issued by Circle SE and proper record of it should be maintain at circle level.

-

-

-

... More
6. Monthly / Routine verification of the deployed person should be done by circle office.

-

-

-

... More
7. The unit rates per day ( 8 hrs. of duty) and per month (26 days) shall be allowed as per minimum wages approved by Labour Deptt., Govt. of Rajasthan vide its notification dated 30.7.2021 w.e.f. 1.7.2020

-

-

-

... More
8. The GST applicable on payment to worker @18% shall be paid extra, if applicable on production of documentary evidence.

-

-

-

... More
9. The EPF contribution of employer @12% & ESI @3.25% on aforesaid minimum wages shall be paid extra on production of documentary evidence for deposit of same.

-

-

-

... More
10.Any downward/upward variation in the EPF, ESI & GST rate if occurred during currency of contract then the effect of same be taken into account. If any revision in minimum wages is circulated by Govt. of Rajasthan during currency of contract, then the increased minimum wages be paid to contractor.

-

-

-

... More
11.  The weekly rest shall be allowed as per norms. No worker shall remain on continuous duty more than 8 hrs in a day.

-

-

-

... More
CHAPTER-18: FENCING WORKS

-

-

-

... More
Providing and fixing 180 cm high fencing with angle iron post size 50x50x6mm placed at every 3 meters apart and 45cm in ground embedded in cement concrete 1:3:6 (30x30x60cm) corner and every 10th.post to the strutted with 50x50x6 mm angle iron provided with 6 horizontal lines and 2diagonals of G.I. barbed wire between two post fitted and fixed with G.I. Staples including each works in excavation etc. complete.

1

707

707

... More
Providing and fixing 150 cm high fencing with angle iron post size 50x50x6mm placed at every 3 meters apart and 45cm in ground embedded in cement concrete 1:3:6 (30x30x60cm) corner and every 10th post to the strutted with 50x50x6 mm angle iron provided with 6 horizontal lines and 2diagonals of G.I. barbed wire between two post fitted and fixed with G.I. Staples including each works in excavation etc. complete.

1

504

504.79

... More
Providing and fixing 120 cm high fencing with angle iron post size 50x50x6mm placed at every 3 meters apart and 45cm in ground embedded in cement concrete 1:3:6 (30x30x60cm) corner and every 10th.post to the strutted with 50x50x6 mm angle iron provided with 6 horizontal lines and 2diagonals of G.I. barbed wire between two post fitted and fixed with G.I. Staples including each works in excavation etc. complete.

1

472

472.31

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: (@ 70.00 per Kg

1

63

63.16

... More
Providing and fixing welded mesh/expanded metal mesh in frame work, flat iron beading 20x3mm including top cross laps inside and out sides elding, iron bolts, crews, clips etc. complete (excluding frame work) of size.

-

-

-

... More
Expended metal size 20-25 mm size 18SWG

1

638

638.85

... More
Welded mesh 50 mmx 25 mm x 2.1 mm

1

591

591.93

... More
Welded mesh 25 mmx 25 mm x 2.1 mm

1

615

615.39

... More
Welded mesh 50 mmx 50 mm x 2.1 mm.

1

568

568.47

... More
CHAPTER-19 (A): SUPPLY OF MATERIAL FOR KUTIR JYOTI /BPLCONNECTION IN RURAL AREA

-

-

-

... More
Supply of

-

-

-

... More
Surface type teak wood Board with varnish and entire treatment including fixing gutties etc.For installation of cut-outs holders and bulb and on-off switch.

-

-

-

... More
Size250x300mm

1

54

54.16

... More
240 volt kit kat fuse 5 amp.porcelain base with copper contact on existing Board including making connections etc.as required . MAKE:KENBAR/CROMPTON/GEC/PHILIPS.

1

20

20.96

... More
5 amp.porcelain base single pole tumber switch IS-3854 including making connection etc.as required make:-SK/555,RK/555,KINJAL,EMPERIOR.

1

15

15.95

... More
Brass batten/Angle/pendent holder any ISI approved make including making connections etc.as required.

1

34

34.1

... More
Bulb 40/60 watt make PHILIPS/BAJAJ/GEC.

1

15

15.5

... More
10 Amp. 240 Volts ISI mark MCB.

1

100

100.67

... More
CFL 14 W ISI mark

1

103

103.32

... More
Supply with 4 Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming to IS (latest amendment) procured as per specification of Nigam and approved vendor of Jaipur Discom.

1

48

48.26

... More
Supply of 2.5 mm2 T/C XLPE armoured cable of aluminium conductor confirming to ISS (latest amendment) procured as per specification of Nigam and from the approved vendor of Jaipur Discom

1

36

36.17

... More
Supply of PVC insulated solid aluminum conductor cable 1.5sq.mm. single core 1100V. Grade (IS.694) of standard quality and approved Makes.

1

4

4.57

... More
Supply of Angle 50x50x6 mm for supporting service line with nuts& bolts. (2' long)

1

139

139.47

... More
Supply of 16 mm Dia MS Rod 2 Meter long along with GI. Wire 10SWG with nut& bolts.

1

201

201.47

... More
CHAPTER-19 (B) : TRANSPORTATION /ERECTION FOR KUTIR JYOTI / BPL CONNECTION IN RURAL AREA

-

-

-

... More
Transportation & Fixing of

-

-

-

... More
Surface type teak wood Board with varnish and entire treatment including fixing gutties etc.For installation of cut-outs holders and bulb and on-off switch.

-

-

-

... More
Size250x300mm

1

5

5.57

... More
240 volt kit kat fuse 5 amp.porcelain base with copper contact on existing Board including making connections etc.as required . MAKE:KENBAR/CROMPTON/GEC/PHILIPS.

1

3

3.65

... More
5 amp.porcelain base single pole tumber switch IS-3854 including making connection etc.as required make:-SK/555,RK/555,KINJAL,EMPERIOR.

1

2

2.3

... More
Brass batten/Angle/pendent holder any ISI approved make including making connections etc.as required.

1

5

5.57

... More
Fixing of 10 Amp. 240 Volts ISI mark MCB.

1

18

18.56

... More
Wiring service line from LT Pole to meter of the consumer with 4 Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming to IS (latest amendment) procured as per specification of Nigam and approved vendor of Jaipur Discom duly clipped/hocked and insulating tape complete in all respect.

1

4

4.87

... More
Wiring service line from LT Pole to meter of the consumer with 2.5 Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming to IS (latest amendment) procured as per specification of Nigam and approved vendor of Jaipur Discom duly clipped/hocked and insulating tape complete in all respect.

1

3

3.39

... More
Drawing PVC insulated solid aluminum conductor cable 1.5sq.mm. single core 1100V. Grade (IS.694) of standard quality and approved Makes duly clipped on wooden bottom.

1

1

1.49

... More
Fixing of Angle 50x50x6 mm for supporting service line with nuts& bolts in cements Mortor. (2' long)

1

18

18.56

... More
Fixing of single phase meter box at the premises of existing/new consumer with 4 Nos Anchor fastners of rust proof size M-6x50 mm on the wall as per the position of the holes already provided on the meter box. The meter box must be housed perfectly vertical/plumb line.

-

-

-

... More
Plastic Box

1

60

60.58

... More
Metal Box

1

77

77.37

... More
Fixing of single phase energy meter in meter box by providing machine screws making holes on backelite sheet as per requirement & also making connections at meter terminals and MCB using Thimbles(by crimping) including providing M-seal compound inside meter box. The bakelite sheet must be fixed properly with Screws to restrict the movements vertically or horizontally. The meter is after making connections of service lines with distribution mains by licenced contractor only. The screws will be provided by contractor. Payment for lugs will be made extra @ Rs.1.00 per wire for single phase connection if not available with JVVNL & provided by contractor.

1

38

38.76

... More
Note: Meter & Meter Box will be provided by JVVNL

-

-

-

... More
Earthing with 16 mm Dia MS Rod 2 Meter long and driven them into earth by mechanical means.The work including flattening of top end of MS rod drilling a hole at flattened end and tightening of earth electrods I.e. G.I. Wire 10SWG with nut& bolts the other end will be connected to the earth terminal provided at meter board.

1

46

46.62

... More
Fixing of AC Static Energy meter 5-30 Amp. With LCD Display with moulded box (complete unit ) at the consumer's premises with 4 No. Anchor Fasterners of rust proof size M-6X50 mm on the wall as per the position of the holes provided on the meter box.The meter box must be housed perfectly vertical/plumb line.

1

93

93.1

... More
NOTE:- The Rates are inclusive of all applicable Taxes/ Duty except GST which will be paid extra by Nigam if applicable after production of documentary evidence.

-

-

-

... More
CHAPTER - 20: ERECTION & COMMISSIONING OF CABLE

-

-

-

... More
Laying of 11 KV, XLPE, Cable (Aluminium conductor) underground as per relevant IS/JVVNL standards including excavation of 30 cm x 120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class beicks covering refilling soil in the remaining(Including fixing of G.I.Pipe of required size at both end with 3 Mtr projected above the ground surface & 0.3 Mtr. below ground level)

-

-

-

... More
a) 3x35 Sq mm to 3x185 Sq mm

1

95

95.58

... More
b) 3x240 Sq mm to 3x400 Sq mm

1

107

107.54

... More
Note: per meter shall be paid extra for excavation in Pakka Road.

1

50

50.43

... More
Laying of two (D/C) 11 KV, XLPE, Cable (Al. conductor) underground cable w/o overlapping as per relevant IS/JVVNL standards including excavation of 50 cm width x120 cm deep trench in Kaccha land, 25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn.

-

-

-

... More
a) 3x35 Sq mm to 3x185 Sq mm

1

167

167.32

... More
b) 3x240 Sq mm to 3x400 Sq mm

1

189

189.38

... More
Note: per mtr shall be paid extra for excavation in Pakka Road.

1

89

89.38

... More
Installation of cable termination / straight through joints on 11KV Aluminium conductor XLPE /PILCA Cable with outdoor/ indoor termination end and /or straight through joint including required excavation / remoral/ fixing / refixing/ testing etc. as required

-

-

-

... More
A) (I) Outdoor end terminal 3x35 Sq mm to 3x185 Sq mm

1

1032

1032.94

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

1205

1205.08

... More
B) (I) Indoor end terminal 3x35 Sq mm to 3x185 Sq mm

1

946

946.89

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

1157

1157.16

... More
C) (I) Straight through joint 3x35 to 3x185 Sq mm

1

2151

2151.81

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

2510

2510.55

... More
Laying of 33 KV XLPE Cable ( Aluminium Conductor ) underground as per relevant ISS / JVVNL standard including excavation of 30 cm width x120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn.

-

-

-

... More
A) 3x50 Sq mm to 3x185 Sq mm

1

119

119.52

... More
B) 3x240 Sq mm to 3x400 Sq mm

1

131

131.51

... More
Note:- Per mtr. Rate shall be paid extra for excavation of puccka road

1

50

50.77

... More
Laying of two ( D/C) 33KV, XLPE (Aluminium conductor) undrground cables w/o overlapping as per relevant IS/ JVVNL standard including excavation of 50 cm width x 120 cm deep trench in Kaccha land.25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn.

-

-

-

... More
A) 3x50 Sq mm to 3x185 Sq mm

1

210

210.42

... More
B) 3x 240 Sq mm to 3x400 Sq mm

1

229

229.56

... More
Note:- per meter shall be paid extra for excavation in Pakka Road.

1

89

89.38

... More
Intallation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable type) as per manufacturer's kit guidance and direction including preparation of cable and testing refilling etc as required (Including crimping of lugs) Including required excavation/ removal/ fixing/ reaffixing/ testing etc. as required.

-

-

-

... More
(I) Outdoor end terminal 3x50 Sq mm to 3x185 Sq mm

1

1291

1291.15

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

1577

1577.99

... More
(I) Indoor end termination 3x50 Sq mm to 3x185 Sq mm

1

1032

1032.94

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

1262

1262.35

... More
(i) Straight through joint 3x50 Sq mm to 3x185 Sq mm

1

2907

2907.41

... More
(ii) 3x240 Sq mm to 3x400 Sq mm

1

3366

3366.4

... More
Note:- Rate shall be reduced by 20% for "Push On" typekit

-

-

-

... More
Laying of 33 KV & 11KV XLPE cable without Road cutting i.e. through burrowing machine "VERMIER".(120 cm deep).Use of this technology must be restricted to the situation like:-

-

-

-

... More
(i) When the passages available for laying the proposed cable is totally a metal or cement concrete road.

-

-

-

... More
(ii) When the road cutting is not permitted by the local administration.

-

-

-

... More
A) 33 / 11 KV 3C x 300 Sq.mm cable

1

302

302.28

... More
B) 33 / 11 KV below 3C x 300 Sq.mm cable

1

284

284.23

... More
C) LT 3.5 Core 95 Sq.mm and above

1

284

284.23

... More
When cable laying through manual trench less (Bogie). Use of this technology must be restricted to the situation like:-

-

-

-

... More
(i) When the passages available for laying the proposed cable is totally a metal or cement concrete road.

-

-

-

... More
(ii) When the road cutting is not permitted by the local administration.

-

-

-

... More
(i) 33/11 KV 3CX300 Sqmm. Cable

1

219

219.19

... More
(ii)33/11 KV below 3CX300 Sqmm.

1

182

182.66

... More
(iii) LT 3.5 core 95 Sqmm and above

1

182

182.66

... More
Laying of under ground LT XLPE cable including excavation of 30cmx120cm.deep trench in Kachh land and refilling by 25 cm thick layer of sand 'A' class bricks covering refiling soil in the remaining portion.

-

-

-

... More
3.5 C x 300 sq. mm

1

81

81.18

... More
3.5 C x120-185 sq. mm

1

66

66.42

... More
4 C-25/50 sq. mm

1

36

36.9

... More
4 C-up to 16 sq. mm

1

22

22.15

... More
2C- up to 6 sq. mm

1

17

17.72

... More
Note:- Per mtr. Rate shall be paid extra for excavation of puccka road

1

50

50.77

... More
Under Ground Cable Fault locating Machine Charges (Per Fault)

-

-

-

... More
FOR HT CABLES

-

-

-

... More
For 33 KV/11 KV Cable fault pin pointing (Within JCC)

1

14888

14888.44

... More
For 33 KV/11 KV Cable fault pin pointing (Other than JCC)

1

14888

14888.44

... More
FOR LT CABLES

1

14888

14888.44

... More
Installation of cable termination / straight through joints on LT XLPE / PVC Insulated Cable with outdoor or straight through joint including required excavation / remoral/ fixing / refixing/ testing etc. as required

-

-

-

... More
Outdoor end terminal 3.5C / 4Cx50 Sq mm to 3.5C / 4Cx185 Sq mm

1

688

688.63

... More
3.5C / 4Cx240 Sq mm to 3.5C / 4Cx400 Sq mm

1

803

803.39

... More
Straight through joint 3.5C / 4Cx50 Sq mm to 3.5C / 4Cx185 Sq mm

1

1434

1434.54

... More
3.5C / 4Cx240 Sq mm to 3.5C / 4Cx400 Sq mm

1

1673

1673.69

... More
Installation of out door cable termination on 11 KV Aerial Bunched Cable including required removal / fixing / refixing/ testing etc. as required

-

-

-

... More
Outdoor end terminal 50 Sq mm to 95 Sq mm

1

344

344.31

... More
Installation of straight through joints on HT XLPE Insulated Cable with straight through joint including required removal / fixing / refixing/ testing etc. as required. (Without excavation)

-

-

-

... More
For 11 KV:-

-

-

-

... More
Straight through joint 3x35 to 3x185 Sq mm

1

1291

1291.17

... More
3x240 Sq mm to 3x400 Sq mm

1

1506

1506.35

... More
For 33 KV:-

-

-

-

... More
Straight through joint 3x50 to 3x185 Sq mm

1

1613

1613.93

... More
3x240 Sq mm to 3x400 Sq mm

1

1972

1972.49

... More
For assisting in cable fault location detailed as below by engaging the services of skilled person on cable fault locating machine.

1

225

225.58

... More
For Extra Loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit.

-

-

-

... More
11 KV Cable:-

-

-

-

... More
3X35 Sq.mm to 3X185 Sq.mm

1

91

91.67

... More
3X240 Sq.mm to 3X400 Sq.mm

1

103

103.14

... More
33 KV Cable:-

-

-

-

... More
3X50 Sq.mm to 3X185 Sq.mm

1

206

206.27

... More
3X240 Sq.mm to 3X400 Sq.mm

1

223

223.46

... More
NOTE:- 1. The Rates are inclusive of all applicable Taxes/ Duty except GST which will be paid extra by Nigam if applicable after production of documentary evidence.

-

-

-

... More
2. If the Cable Jointing Kits of HT / LT are not available with Nigam, then the unit officer will obtain NAC from ACOS & the contractor will supply the same as per latest SIR plus 10% (profit) of approved vendors.

-

-

-

... More
CHAPTER-21: ERECTION AND COMMISSIONING OF CAPACITOR AND CAPACITOR BANK

-

-

-

... More
Installation of control panel including wiring to the required equipments and conducting all precommissioning tests before energization satisfactory operation in all respect existing thereof.

1

1847

1847.5

... More
Erection and assembly of capacitor bank, with RTV, Series Reactor on the structure as per approved drawing and installation,commssioning of capacitor units, SR & RTV on erected structure including connections and accessories, jumpering etc. as per approved drawing.

1

10569

10569.61

... More
Laying, testing, termination of control cable, 1100 Volt PVC installed supply and providing of ferrules and copper lugs to designate various cores of control cable by terminal numbers for identification including utilization of cable glands. The control cable should be neatly arranged in trenches avoiding crossings, including clamping of control cable in rubber battons at regular interval and providing identity tages.

-

-

-

... More
a) 2x2.5 Sq.mm. X 6 Nos.

1

14

14.47

... More
b) 4x4 Sq.mm. X 2 Nos.

1

21

21.55

... More
c) 4x2.5 Sq.mm. X 1 No.

1

19

19.19

... More
d) 12x2.25 Sq.mm.

1

26

26.43

... More
Fixing & commissioning of ISI mark capacitor at Distribution Transformer/LT Pole including bracket & clamp ( 25x25x2mm) of Angle & ('35x6mm) flat with connecting on wire of 16 Sq.mm.3 core cable 2.5 meter with lugs & nut, bolt ,transportation at site

-

-

-

... More
6 KVAR

1

494

494.61

... More
9 KVAR

1

541

541.4

... More
12 KVAR

1

589

589.8

... More
Fixing of 3 phase LT shunt capacitor (3/6/9/12 KVAR) near starter of motor for agriculture consumers to be fixed with MS clamp of --Shape of size 2x10mm having two nos. holes for fixing of LT capacitors besides starter of consumer with the help of two no. machine screw. The starter shall be connected using PVC sheathed single core of 4 sq.mm Al. cable conforming to relevant IS. The wire shall be cut in three pieces which shall be used for extending existing wire with making proper joint and joint shall be taped with MS compound/PVC tape roll. The ends of wire shall be properly crimped with lugs /thimble etc. All material shall be supplied by the contractor except LT shunt capacitor (The LT shunt capacitor shall be supplied by Nigam)

1

90

90.24

... More
CHAPTER-22: LABOUR

-

-

-

... More
Distribution of Energy bills (DL, NDS, Street light SIP, mix load & Ag)

-

-

-

1

1

1.48

1

1

1.91

... More
Distribution of DC. Notices

-

-

-

1

2

2.36

1

5

5.9

... More
NOTICE: Contractor should take receipt from consumers with dated Signature for which book will be supplied by Nigam.

-

-

-

... More
Photo state copies, (Including paper, ink & operator).(If contractor install his m/c inside Nigam's Premises free accomodation and free electricity will be provided by Nigam.

-

-

-

... More
(I) Size- A-4 Jaipur

1

-

0.76

... More
Size- A-4 Circle head quarters other than Jaipur.

1

-

0.88

... More
(2) Size A-5 Jaipur

1

-

0.88

... More
Size- A-5 Circle head quarters other than Jaipur.

1

1

1.01

... More
To take reading of Energy Meter Installed at 11/ 0.4 KV or 6.35 / 0.23 KV Distribution Transformer at different locations using Ladder / Channel. The reading should be taken Manually.

1

27

27.07

... More
To verify reading of Energy Meter Installed at 11/ 0.4 KV or 6.35 / 0.23 KV Distribution Transformer at different locations using Ladder / Channel. The reading should invariably be taken along with verification of load as well as condition of transformer should also be reported .Proof of reading be evinced with photograph (Camera will be provided by Contractor),

1

45

45.11

... More
Disconnection / Reconnection:-

-

-

-

... More
From Pole:-

1

40

40.61

... More
From Meter:-

1

18

18.05

... More
Site survey for preparing the estimate along with details of connected connections with their load and preparation of single line diagram.

1

90

90.24

... More
Energy Meter reading

-

-

-

... More
Taking meter reading without photo

1

3

3.47

... More
Verification of meter reading with capturing photo of meter dial

1

3

3.61

... More
Identification numbering on support pole/ structure/ transformer/ other equipment/ Warning instruction of availability of two sources of supply on same structure, at source structure, at cut points, properly labelled using yellow base and black indication marks (number or digits) 40/50 mm height digits/ words should be used for this purpose. Base shall be made using 2 new or more coats of yellow enamel paint till good surface finish. Base painting and marking of digits should be performed by a skilled and trained painter using branded enamel paint. Engineer - lncharge shall approve type and brand of enamel paint.

-

-

-

... More
In urban area

1

9

9.02

... More
In rural area

1

10

10.83

... More
Hiring of Unskilled, Semi-Skilled & Skilled worker

-

-

-

... More
Rate of Hiring of Unskilled worker

1

271

271.98

... More
Rate of Hiring of Semi-Unskilled worker

1

284

284.58

... More
Rate of Hiring of Skilled worker

1

297

297.18

... More
Note:-

-

-

-

... More
1.      If need be suitable workers may be hired on ARC with the permission of SE (O&M) concerned.

-

-

-

... More
2.      The unit rates per day (8 Hrs of duty) and per month (26 days) shall be allowed as per Minimum wages approved by Labour Department, Govt of Rajasthan vide its notification dated 19.8.2020 w.e.f 1.7.2020.

-

-

-

... More
3.      The GST applicable on payment to worker @ 18% shall be paid extra, if applicable on production of documentary evidences.

-

-

-

... More
4.      The EPF contribution of employer @12% & ESI@3.25% on aforesaid rates of minimum wages shall be paid extra are applicable.

-

-

-

... More
5.      Any downward/upward variation in the EPF, ESI & GST rate if occurred during currency of contract then the effect of same be taken into account. If any revision in minimum wages is circulated by Govt. of Rajasthan during currency of contract, then the increased minimum wages be paid to contractor.

-

-

-

... More
6.      The field officer shall ensure that no worker remain on duty more than 60 days in a year. The weekly rest shall be allowed as per norms. No worker shall remain on continuous duty more than 8 hrs in a day.

-

-

-

... More
CHAPTER-23(B): HIRE CHARGES OF PLANTS AND MACHINERIES

-

-

-

... More
NOTE: Hire charges per day for 8 hours

-

-

-

... More
GENERATORS 63 KVA(With Fuel & Operator)

-

-

-

1

1876

1876.13

... More
Stand by on NO load

-

-

-

1

1876

1876.13

... More
Running Charges

1

200

200.14

... More
On Load

-

-

-

1

1876

1876.13

... More
Running Charges

1

312

312.7

... More
Crane with driver and P.O.L (Per Hrs.)

-

-

-

1

564

564.34

1

967

967.48

1

806

806.22

1

1021

1021.23

... More
Note: The Rates are inclusive of all applicable Taxes/ Duty except GST which will be paid extra by Nigam if applicable after production of documentary evidence.

-

-

-

... More
CHAPTER-24: REPLACEMENT OF 11 KV CT PT SETS

-

-

-

... More
Safe Loading of new/old 11 KV CT PT sets (all sizes)

1

115

115.63

... More
Safe unloading of new /old 11 KV CT PT set (all sizes )

1

51

51.64

... More
Installation , testing as per Nigams norms & commissioning of new 11KV CT PT set (all sizes) on erected supports including jumpering,crimping of lugs/ clamping earth connection of body &conducting pre commissioning test before energization and satisfactory operation in all respect

1

675

675.82

... More
Removal of damaged 11 KV CT PT Set from existing structures

1

473

473.03

... More
Replacement of defective / burnt 33 KV or 11 KV CT/PT/CTPT Set (All sizes) at 33/11 KV S/S.It includes installation, testing, commissioning with jumpering ,crimpimg og lugs/clamping earth connection of body)

-

-

-

... More
33 KV or 11 KV CT/PT/ CTPT set

1

1148

1148.85

... More
33 KV CT/PT/ CTPT set

1

1148

1148.85

... More
Transportation of 33 KV or 11 KV CT/PT/CTPT Set (All sizes)for replacement at 33/11 KV S/S along with their loading & unloading..

-

-

-

... More
33 KV or 11 KV CT/PT/ CTPT set

-

-

-

... More
Within 10 Kms

1

175

175.22

... More
Above 10 Kms & upto 30 Kms .Add for each Km or part thereof

1

5

5.01

... More
Above 30 Kms . Add for each Km or part thereof

1

3

3.39

... More
CHAPTER-25 (A) : SUPPLY OF MATERIAL OF HT METERING ON DISTRIBUTION TRANSFORMER

-

-

-

... More
Supply of PVC ISI mark 1100 V 12x2.5 mm2 solid copper armoured control cable including lugs & fersules and laying of cable along the DP structure binding with wire at regular interval and making connections from CTPT secondary terminals to TTB. Including utilization of cable gland

1

214

214.49

... More
Supply of fabricated steel item of MS Channel/Angle/Flat.

1

58

58.59

... More
Supply of MS nuts & bolts

1

82

82.45

... More
Supply of meter box of size 525x300x150 mm made by deep drawn method from steel sheet of thickness 1.0 mm duly grey colour powder coated. The viewing window shall be provided with toughened glass of 5 mm thickness of size 120x140 mm. The cover of meter box shall be fixed on inside hinges. The cover shall be provided with neoprene rubber gasket lining fixed with adhessive. Backelite sheet of size 450x275x2 mm for mounting of HTTVM and TTB shall be provided. 4 nos. fixing clamps welded at top of rear face of the meter box of size 50x120x6 mm with 80 mm projection with a rectanguler slot of 17.5mmx50mm. 2 nos. clampsof 50x6mm alongwith nuts, bolts & washers should also provided for fixing the box on pole/joist. 2 nos. welded sealing bolts with nuts and washers should be provided for sealing the box . One hole with matel gland for cable size of 12core 2.5 mm2 control cable should be provided in the center of bottom. The meter box should consist of one 3 phase 4 wire link type meter test termianl block of IMP/CAPITAL make rated for atleast 10 A with cover mounted in the box. Earthing arrangement should be provided one meter box.

1

1303

1303.07

... More
Note:-

-

-

-

... More
The Concerned Assistant Engineer will arrange the necessary shut down for starting the work. The installed meter inside the meter box and metering equipments duly mounted on the mounting structure will be powered up by connecting load in the presence of Assistant Engineer (O&M). Since the work invloves higher A/C voltage level the contractor shall take fulcare regarding safety nors so as to avoid any accidental hazards.

-

-

-

... More
For the work under this chapter conductor, clamps & lugs for jumpring shall be provided by contractor for which payment shall be made as per latest store.

-

-

-

... More
CHAPTER-25 (B): TRANSPORTATION /ERECTION OF MATERIAL OF HT METERING ON DISTRIBUTION TRANSFORMER

-

-

-

... More
Safe carriage of CT/PT set (all size) including loading and unloading from Nigam store to site

-

-

-

... More
(a) Within 10 Kms.

1

175

175.22

... More
(b) Above 10 Km upto 30 Km. Add for each Km. or part there off

1

5

5.01

... More
(c) Above 30 Km. Add for each Km. or part there off

1

3

3.39

... More
Installation, testing as per Nigam norms and commissioning of new CT/PT set on erected supports including jumpering wiring crimping of lugs clamping earth connection of body and conducting pre commissioning test before energisation and satisfactory operation in all respect. CTPT set shall be provided by Nigam from concern sub-div stores.

1

511

511.02

... More
Fixing of PVC ISI mark 1100 V 12x2.5 mm2 solid copper armoured control cable including lugs & fersules and laying of cable along the DP structure binding with wire at regular interval and making connections from CTPT secondary terminals to TTB. Including utilization of cable gland

1

39

39.17

... More
Transportation and Fixing of fabricated steel item of MS Channel/Angle/Flat.

1

2

2.71

... More
Transportation and Fixing MS nuts & bolts

1

2

2.71

... More
Transportation and Fixing of meter box of size 525x300x150 mm made by deep drawn method from steel sheet of thickness 1.0 mm duly grey colour powder coated. The viewing window shall be provided with toughened glass of 5 mm thickness of size 120x140 mm. The cover of meter box shall be fixed on inside hinges. The cover shall be provided with neoprene rubber gasket lining fixed with adhessive. Backelite sheet of size 450x275x2 mm for mounting of HTTVM and TTB shall be provided. 4 nos. fixing clamps welded at top of rear face of the meter box of size 50x120x6 mm with 80 mm projection with a rectanguler slot of 17.5mmx50mm. 2 nos. clampsof 50x6mm alongwith nuts, bolts & washers should also provided for fixing the box on pole/joist. 2 nos. welded sealing bolts with nuts and washers should be provided for sealing the box . One hole with matel gland for cable size of 12core 2.5 mm2 control cable should be provided in the center of bottom. The meter box should consist of one 3 phase 4 wire link type meter test termianl block of IMP/CAPITAL make rated for atleast 10 A with cover mounted in the box. Earthing arrangement should be provided one meter box.

1

201

201.64

... More
Transportation and Installation of HTTVM in the meter box and making connection from TTB to HTTVM by 2.5 Sq. mm flexible ISI mark PVC wire (the flexible wire of length 2 Mtr. for each HTTVM & TTB connection is to be supplied by the contractor).HTTVM shall be provided by Nigam from concern stores.

1

63

63.14

... More
Note:- The Rates are inclusive of all applicable Taxes/ Duty except GST which will be paid extra by Nigam if applicable after production of documentary evidence.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.