Jaipur Vidyut Vitran Nigam Limited Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Jaipur Vidyut Vitran Nigam Limited - JVVNL Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date19 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 10,02,000 
Notes
Download

Costs

  • EMD

    ₹ 20,040
  • Document Cost

    ₹ 2,950
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

6

1534

255.72

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

54

70767

1310.5

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

12

18794

1566.22

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

95

22084

232.47

... More
Excavation of pit in Hard rock ( Where blasting is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit.

-

-

-

... More
(A) Height of poles/R.S.Joist/M.S. Rail /Size of pit

-

-

-

... More
9 Mtr/ 1.2mx0.6mx1.50 m deep

2

1917

958.7

... More
(B) Lattice Tower /Size of pit

-

-

-

... More
11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep

12

31814

2651.24

... More
12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep

4

11612

2903.07

... More
(C)Stay set/Depth of pit

-

-

-

... More
8'x 3/4" -0.75x0.5x1.6 m

24

15934

663.94

... More
Safe carriage of PCC poles including loading / un-loading

-

-

-

... More
a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole

-

-

-

... More
Within 10 Kms.

2

463

231.74

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (4.75X20=95)

2

190

95

... More
c) 9 Mtr. Long-200 Kg

-

-

-

... More
Within 10 Kms.

6

1166

194.46

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (4.75X20=95)

6

570

95

... More
Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site

-

-

-

... More
Within 10 Kms.

14

4559

325.65

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (4.61X20=92.2)

14

1290

92.2

... More
Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc.

-

-

-

... More
Within 10 Kms.

3

1170

390.29

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (5.57X20=111.4)

3

334

111.4

... More
Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site.

-

-

-

... More
Within 10 Kms.

41.8

19842

474.71

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (4.61X20=92.2)

41.8

3853

92.2

... More
Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading.from store to site

-

-

-

... More
d) Above 100 KVA & upto 315 KVA

-

-

-

... More
Within 10 Kms.

1

889

889.63

... More
Above 10 Kms. & upto 30 Kms. Add for each Km.or part thereof. (11.52X20=230.40)

1

230

230.4

... More
Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores

-

-

-

... More
Within 10 KMs.

1

889

889.63

... More
Above 10 Kms. and upto 30 Kms.Add per each km,or part thereof

1

230

230.04

... More
Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra.

-

-

-

... More
Lattice structure

41.8

204340

4888.53

... More
Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates.

-

-

-

... More
PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long

1

1297

1297.81

... More
PCC Poles 9 Mtr. Long(200 Kg.)

3

3315

1105

... More
Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire

-

-

-

... More
8"x3/4" with 7/8 SWG stay wire

119

33178

278.81

... More
Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base.

83

234382

2823.89

... More
Supplying and laying of randum rubble stone boulder having weight not less than 20 kgs.

73

33782

462.77

... More
Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station.

1.5

4740

3160.02

... More
Fixing of top hampers with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
11 KV Top Hampers

20

248

12.4

... More
Fixing of guarding Bracket arms with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
11 KV line

14

379

27.12

... More
Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. The nuts & bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
11 KV line

16

949

59.37

... More
Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 nos .disc.& 1set of H/W) on terminal point including fixing of hardware andstrips.

6

281

46.96

... More
Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips.

57

1271

22.31

... More
Fixing of 11 KV pin insulator with pins.

236

2341

9.92

... More
Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(B)G.O. switch . without earthing blade.

-

-

-

... More
11kv G.O.switch

2

1730

865.1

... More
Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
11kv Horn Gap fuse set.

2

889

444.96

... More
Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates,

-

-

-

... More
Above 100 KVA & up to 315 KVA

1

941

941.34

... More
Fixing of PG clamp of Weasel /Rabbit Conductor

75

372

4.97

... More
Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
ACSR DOG

0.2

516

2584.3

... More
ACSR RABBIT

15.33

33817

2205.98

... More
Drawing & stringing of G.I. 4 wire over the guarding bracket for guarding of road crossing /P&T crossing /Railway track crossing (for one span only)with cross G.I.wire laces at an interval of two meter each or required as per location using EYE bolt, nuts and bolts with washers etc.including binding .The EYE bolts and other nuts and bolts will be provided by thecontractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(A) For 4 wire stringing

-

-

-

... More
8 SWG with laces of 10 SWG

7

4829

689.97

... More
Fixing of G.I. Laces on Guard wire at an interval of one meter each or required as per location using EYE bolt ,nuts and bolts with washers etc.including binding,if required .The EYE bolts and other nuts and bolts will be provided by the contractor for which payment will be made as per prevailing Discom store issue rates.

-

-

-

... More
(B) IN RURAL AREA

-

-

-

... More
For 4 Guard wire

350

12642

36.12

... More
Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom)

35

11732

335.22

... More
Earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16" dia.at flattened top and tightening of M.S.flat 50x6mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence.

3

673

224.62

... More
Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust.

106

2727

25.73

... More
Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom.

-

-

-

... More
11 KV VCB (Outdoor )

1

5013

5013.96

... More
Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S.

1

19775

19775.39

... More
The installation work to be carried out as per drawing/design, under the supervision of concerned Assistant Engineer

-

-

-

... More
Mounting structure

-

-

-

... More
The requisite steel members will be supplied by contractor including the hardware. Contractor shall joint/weld the members to form the mounting structure as per drawing. Necessary tools, welding, machines, lifting devices etc. shall be arranged by contractor.

-

-

-

... More
Civil works

-

-

-

... More
Erection of lattices in alignment including excavation and concreting of structure foundation including cement, sand and grit 20 mm size (crusher broken) having ratio 1:3:6 and grit 40 mm size for ratio 1:5:10 and curing for period as required (21 days). Area of concreting will be as per the drawing.

-

-

-

... More
Metering Equipments:

-

-

-

... More
The requisite metering equipments (CTPT set, meter,meter box & suitable conductors for jumpers), will be provided by the concerned Assistant Engineer in healthy condition at site. The cables from CTPT set to meter box laid down in 50 mm GI pipe with suitable bends & nipples, shall be provided by contractor alongwith the consumable items such as PVC tapes, petroleum jelly etc. The cable should be PVC multi strand copper 4 core 2.5/4 Sq. mm ISI marked and firm & tight connections shall be made by suitable connector e.g. at CTPT sets by using clamps and at meter/TTB by suitable lugs etc. The CTPT sets so installed shall be earthed by means of the MS Flat (size 50x6 mm) by joining it with the nearest earthing available at the sub-station. Requisite earthing material shall be made available by the contractor.

-

-

-

... More
Meter:

-

-

-

... More
Meters should be fixed firmly inside the tamper proof box, as per drawing. All the meter fixture will be provided by contractor including all consumables.

-

-

-

... More
Meter Box

-

-

-

... More
The meter box shall be provided by the concerned Assistant Engineer. However, hardware or any other items required to fix the meter inside the meter box will be provided by contractor. The meter box will be fixed firmly with sufficient strength at a place as per drawing. The test terminal block(TTB) link type shall be provided by contractor in the meter box.

-

-

-

... More
Painting:

-

-

-

... More
All surfaces interior and exterior of lattice structure shall be white aluminum painted.

-

-

-

... More
Commissioning of Metering Equipments:

-

-

-

... More
Installed meters inside the box and metering equipments duly mounted on the mounting structure will be powered up by connecting load in the presence of the concerned Assistant Engineer who will arrange the necessary shut down. The completion certificate shall be furnised by contractor.be filled accordingly. Since the work involves higher A.C. voltage level, the contractor shall take full care regarding safety norms, so as to avoid any accidental hazards.

-

-

-

... More
Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide)

-

-

-

... More
On new surface

2000

64940

32.47

... More
Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint)

-

-

-

... More
On new works with two coats.

2000

97400

48.7

... More
Safe Loading of new/old 11 KV CT PT sets (all sizes)

1

115

115.63

... More
Safe unloading of new /old 11 KV CT PT set (all sizes )

1

51

51.64

... More
Installation , testing as per Nigams norms & commissioning of new 11KV CT PT set (all sizes) on erected supports including jumpering,crimping of lugs/ clamping earth connection of body &conducting pre commissioning test before energization and satisfactory operation in all respect

1

675

675.82

... More
Supply of MS nuts & bolts

127

10471

82.45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.