Indira Gandhi Nahar Project Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Indira Gandhi Nahar Project - IGNP Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date28 Feb 2025
Closing Date31 Mar 2025
Tender Amount₹ 27,70,00,000 
Notes
Download

Costs

  • EMD

    ₹ 55,40,000
  • Document Cost

    ₹ 10,000
  • Tender Fee

    ₹ 2,500

Summary

Renovation And Modernization Of Canals Offtaking Between Rd 248 To 314 Of Smg Branch And Bhatiyawala Minor And Its System. (package-smgs-e)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra over item 10 (a) for lead beyond 250m & upto 750m (for average 1/2Km).

14209.97

110

1566649.19

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra for each subsequent lead of 500m or part, there of beyond 750 m to 1250 m.

7892.74

118

937262.88

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra for each subsequent lead of 500m or part, there of beyond 1250m to 1750 m.

7581.24

127

964712.79

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra for each subsequent lead of 500m or part, there of beyond 1750m to 2250 m.

6475.55

135

879055.91

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra for each subsequent lead of 500m or part, there of beyond 2250m to 2750 m.

3744.48

144

540141.24

... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Extra lead over item no 1 to 8 of excavated material. Add extra for each subsequent lead of 500m or part, there of beyond 2750m to 3250 m.

2557.8

152

390703.95

... More
Extra charges for disposal of excavated/re-handled material in required profile laid in uniform layers and given side slopes well dressed having layer thickness including loading and un-loading wherever required with cost of dewatering wherever required complete in all respect Not exceeding 20cm

528274.9

8

4279026.69

... More
Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor)

528274.9

25

13206872.5

... More
Watering of earth including cost of carriage of water when source of water is up to 1 Km

528274.9

12

6656263.74

... More
Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required.

2284.63

762

1741573.45

... More
Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required In cement mortar

1872.66

576

1080150.29

... More
Recover cost of useful stone @ 2/3rd of masonary work dismantled quantity.

1248.44

-575

-717853

... More
Dismantling cement concrete lining including disposal of material within 50 m lead, inclusive of de-watering wherever required of thickness 7.50 cm

100556.2

28

2815573.6

... More
Single tile lining 74 mm thick with PCC Block size 30x15x4 cm in bed laid in 6 mm thick cement mortar 1:3 (1 cement : 3 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari ) including dressing of bed, scaffolding, laying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film, including cost of jointing material. : Side slopes

87193.1

851

74201328.1

... More
Single tile lining 74 mm thick with PCC Block size 30x15x4 cm in bed laid in 6 mm thick cement mortar 1:3 (1 cement : 3 bajari ) over base plaster of 12 mm thick in cement mortar 1:6 (1 cement : 6 bajari ) & 16 mm thick sandwich plaster in cement mortar 1:3 (1 cement : 3 bajari ) including dressing of bed, scaffolding, laying & jointing of LDPE/HDPE film & curing for 28 days complete as per specification excluding cost of LDPE/HDPE film, including cost of jointing material. : Bed

24592.77

815

20043107.55

... More
ISI marked low Density Poly Ethylene (LDPE) film black, High Impact resistant, Heavy duty Grade 030 in thickness of 125, 200 & 250 micron in the form of flat sheet of 6 to 9 metre width without having any joints as per IS: 2508-1984

27783.07

190

5278783.3

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm

5507.19

5093

28048118.67

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5

1829.57

4377

8008027.89

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:6

4584.87

4243

19453603.41

... More
Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio In Cement sand mortar 1:3

2192.31

149

326654.19

... More
Plaster in cement sand mortar 1:5 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 12 mm

36188.08

230

8323258.4

... More
Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20 mm

1029.74

314

323338.36

... More
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 50 mm

835.86

320

267475.2

... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 40 mm

256.59

5058

1297832.22

... More
Stone patties edges hammer dressed including all lead and lift. Length up to 1.50 m to 2.50 m and thickness 70 mm and above

240.37

800

192296

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for : Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)

30582.52

160

4893203.2

... More
S&F in position cut stone neatly dressed including earthwork, CC.1:4:8 painting with enamel paint engraving letters and numerals as per aaIRC standard design complete.Ordinary Km. stone

1654

690

1141260

... More
Supplying, Laying & consolidation of quarry rubbish / Murrum / Murda to required grade & camber in layers not exceeding 15 cm. thickness (loose) by road roller as per specifications including dressing etc. complete.

24879.12

584

14529406.08

... More
Supply and fixing in position of APM block made of C.I. as per standard specification with adjustable arrangement and required fixtures including transportation to site second stage concerning in C.C. (1:2:4) centering shuttering painting with red oxide finishing etc. complete in all respect cost of APM block (all size) per block

48

10500

504000

... More
Supply of fibreglass reinforced plastic (FRP) Gauge plate for accurate measurement of water level, moulded and sandwiched with MS strip both side finish, front side engraved and molded computerized marking of bands and figures covered in radium, eye pleasent colour combination, laminated with high abrasioj grade polyurethane , provision of MS pressed channel for gauge plate more than 60 cm width etc., complete as directed. 10 cm wide.

65.21

4450

290184.5

... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20mm

95.94

6091

584370.54

... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete In cement sand mortar 1:4

793.65

4580

3634917

... More
Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and removing

78.04

225

17559

... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)

3138.32

89

279310.48

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

88

84

7392

... More
Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 900mm NP4

20

7552

151040

... More
Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 900mm Labour Charges only

20

403

8060

... More
Supply and fixing at site (except civil work required) for accurate measurement of flowing water through channels of calibrated pre-fabricated fibre-glass reinforced plastic (FRP) moulded cut throat flume without any joint, with a side chamber provided in U/S connecting through pipe at bottom with water flowing flume accurate in dimensions and having accuracy of + 1 mm smooth & uniform surface with 0.013 as value of rougosity, inside blue outside gray colour, with engraved gauge marking in cm and litre per second & engraved discharge table showing calculation discharge variation at every 0.10 cm and flow measured at submerged condition etc. complete in all respect. The flumes shall consist from M.S. pipe frame embaded in moulding, light in weight and easy in handling including stiffeners hold fast, sand treatment on the back side of flume etc. complete. Up to 3 cusec, 3 mm thick

2

15000

30000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.