If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Hindustan Salts Limited Tender

Works
Civil And Construction
Eprocure
Opening Date31 Dec 2024
Closing Date21 Jan 2025
Tender Amount₹ 39,46,722.4 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Construction Works Of Hopper, Kota Stone Flooring, Increase Of 80 Cm Height Of Floor Base At Gsr, Ssl, Gudha

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction Works of Hopper, Kota Stone Flooring, Increase of 80 cm height of floor base at GSR, SSL, Gudha
Construction Works of Hopper, Kota Stone Flooring, Increase of 80 cm height of floor base at GSR, SSL, Gudha
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction works of Hopper, Kota Stone Flooring, Increase of 80cm height of floor base at Gudha Salts Refinery, SSL, Gudha.

-

-

-

... More
Earth work in excavation by mechanical means (Hydroulice Excavator) / Manual Mean’s over area (Exceeding 30 cm in depth 1.5 m in depth as well as 10 Sqm on plan) including disposal of excavated earth, lead upto 50 mtr. and lift upto 1.5 mtr. disposal earth to be levelled and neatly dressed. All kind of Soil.

690

-

-

... More
Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of form work for foundation, footings, strap beam, raft, bases of columns etc.

100

-

-

... More
Plaster on new surface on wall’s in cement sand mortar 1:6 including racking of joint’s etc. Complete fine finish 20 mm thick.

128

-

-

... More
Laying dry stone soling and packing closely of 0.30 mtr. thick over the horizontal surface. soling is to be done including filling voids with chipping. Complete in all respect and as per direction of site engineer. Complete in all respect.

410

-

-

... More
Providing & fixing Kota stone slab flooring 25 mm thick over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and polishing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand).

1400

-

-

... More
Providing and Laying in position cement concrete including Curing, Compaction etc. Complete in specified grade excluding the cost of centering & shuttering – all work upto plinth level 1:3:6 (1 Cement : 3 Coarse sand : 6 graded stone aggregated 20 mm nominal size).

150

-

-

... More
Random rubble stone masonry for with hard stone in cement mortar above 30 cm thick wall in cement mortar 1:3 (1 Cement : 3 Sand).

78

-

-

... More
Banking earth in layers, breaking clods, watering at optimum Moisture content rolling each layer with 8-10 tonne vibratory road roller in layer (compacted thickness not exceeding 20 Cm) to achieve 95% of maximum laboratory dry density at every layer as per IS 2720 (Part 7 or 8) and dressing up in embankments for road, flood banks marginal banks and guide banks etc.

1020

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.