Forest Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 53,241Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FORES_435051_1Bid Award Id
ViewTender No
NIT 25/2024-25 DCF TONKTender Authority
Forest Department ViewPurchaser Address
-Website
http://https://forest.rajasthan.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
54.27
2838
154018.26
... More
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
61.89
3479
215315.31
... More
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
35.7
367
13101.9
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. "M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)."
2.04
4624
9432.96
... More
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick.
114.36
227
25959.72
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
120
64
7680
... More
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
113.4
171
19391.4
... More
Part "A-ii" : Construction of WHS
-
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
500
5
2500
... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
76.92
175
13461
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
54.27
2838
154018.26
... More
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
61.89
3479
215315.31
... More
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
35.7
367
13101.9
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. "M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)."
2.04
4624
9432.96
... More
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick.
114.36
227
25959.72
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
120
64
7680
... More
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
113.4
171
19391.4
... More
Part "B" : Construciton of WHS
-
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
500
5
2500
... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
46.57
175
8149.75
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
10.26
3302
33878.52
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
32.26
2838
91553.88
... More
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
38.73
3479
134741.67
... More
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
21.25
367
7798.75
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. "M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)."
1.19
4624
5502.56
... More
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick.
69.3
227
15731.1
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
60
64
3840
... More
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
81
171
13851
... More
Part "C" : Construction of Anicut type III
-
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
500
5
2500
... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
102.48
175
17934
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
24.45
3302
80733.9
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
71.28
2838
202292.64
... More
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
76.51
3479
266178.29
... More
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
46.2
367
16955.4
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. "M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)."
3.06
4624
14149.44
... More
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick.
134.16
227
30454.32
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
120
64
7680
... More
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
64.8
171
11080.8
... More
Part "D" : Construction of Anicut type III
-
-
-
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
500
5
2500
... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil
102.48
175
17934
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
24.45
3302
80733.9
... More
Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in. foundation ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
71.28
2838
202292.64
... More
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in. superstructure ratio Cement Mortar 1:6 ( 1-Cement : 6-Sand)
76.51
3479
266178.29
... More
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification :
46.2
367
16955.4
... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. "M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)."
3.06
4624
14149.44
... More
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 25 mm thick.
134.16
227
30454.32
... More
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift.
120
64
7680
... More
Banking excavated earth in layers not exceeding 20cm. in depth breaking clods watering, rolling each layer with 1/2 tonne roller, or stone or steel rammers, and rolling every 3rd and top- most layer with power roller of 8-10 tonne capacity and dressing up in embankments for roads, flood banks marginal banks, and guide banks etc. lead up to 50 Mtr. and lift up to 1.5 Mtr. All kinds of soils
64.8
171
11080.8
Evaluation Notes How It Works ?