Forest Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 12,000Document Cost
₹ 500Tender Fee
₹ 500
Summary
Constrction Of Rcc Post Fixing Work 1800 Rmt Beed Leelki Rajgarh
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FORES_431036_3Bid Award Id
ViewTender No
9460Tender Authority
Forest Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Procument of Prestressed Concrete Post of Size Height 2.40 m x (At Bottom 15 x 10 cm) x (Top 10 x 10 cm ) cement concrete blocks 1:3:6 (1cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Made of 8 Thin Wires ( 300 Stand pole 54 Doagonally pole )
354
450
159300
Stacking ,4.46.4 Barbed wire & other heavy item
40.33
15
607.77
2.22 Angle Iron/ wooden post and Barbed wire
Fencing 2.22.5 Streching of barbed wire and fixing it with the post with GI wire/with Nut Bolt 1800 X 4
7200
1
10584
2.22 Angle Iron/ wooden post and Barbed wire
Fencing 2.22.8 Binding welded wire mess jali of 1.20 meter height and 30 meter length with GI wire at 2 meter interval including local trans portation and cutting brushwood etc.
1800
5
9072
2.2 Fencing 2.2.5 Reinforced Cement Concrete (RCC) fencing posts 2.2.5.4 Fixing of Cement Concrete block in local soil in a pit of size 30 cm X 30 cm X 45 cm (including pit digging and curing, Cement Sand Concrete 1:4:8) + (Distance Between Post to Post Will Be Maintained 6 Mts And 2 Support will be Provided at each 11 th Post inclined manner.)
354
92
32649.42
Other Miscellaneous expenses like Purchase of cement ,gravel Pebbles For Poles etc.
18838.81
1
18838.81
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements