Forest Department Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Forest Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Dec 2024
Closing Date25 Dec 2024
Tender Amount₹ 6,32,000 
Notes
Download

Costs

  • EMD

    ₹ 12,640
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 500

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Soft / Disintegrated rock (Item No. 2a)(30%)

19.85

155

3076.75

... More
Drilling holes of 35mm daimeter for anchor rods (BSR WRD-2022, Dist Bundi, chap XI item no 1a) i- upto 1.50m depth

71

130

9230

... More
Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete (BSR WRD-2022, Dist Bundi, chap XI item no 1b)

71

219

15549

... More
Nominal mix of Plain Cement Concrete well mixed and laid in position using 20% max permissible limit of plums above 160 mm and up to 450mm, including curing and finishing etc including all leads of all construction materials complete in all respect with well graded crusher broken stone aggregate. The plums shall be distributed evenly and shall be not closer than 150 mm from the surface. PCC Nominal Mix 1:4:8 with Plum, Max size of Aggregate 20 mm (BSR WRD-2022, Dist Bundi, chap IX item no 11.3 C) ( In Foundation)

60.17

4465

268659.05

... More
PCC Nominal Mix 1:3:6 with Plum, Max size of Aggregate 20 mm (BSR WRD-2022, Dist Bundi, chap IX item no 11.2 C) ( In Super Structure)

48.21

4790

230925.9

... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.

120.94

220

26606.8

... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985).

620.68

95

58964.6

... More
Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering ) including loading and un-loading wherever required complete in all respect. With lead beyond 250 m and up to 750 m (½ Km) BSR 2022 ch-V , Item No-16b

75

133

10012.5

... More
Watering of earth including cost of carriage of water when source of water is Beyond 1 Km but up to 3 Km extra per Km (District Bundi WRD BSR 2022 Ch-V, Part -B, Item no 28(b))

75

20

1552.5

... More
Compaction of earth or highly weathered strata By manually or plain roller.(District Bundi WRD BSR 2022 Ch-V, Part -B, Item no 18(a))

75

24

1800



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.