Forest Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Forest Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date16 Jul 2024
Closing Date22 Jul 2024
Tender Amount₹ 61,59,000 
Notes
Download

Costs

  • EMD

    ₹ 1,23,180
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,500

Summary

Construction Of Anicut And Pucca Check Dam Gabion Structure Whs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

38.97

110596

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

40.2

139855

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

0.73

3375

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

76.5

16141

211

... More
Pucca Check Dam behind Bawdi Baba Banga Rasta Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

62.1

16642

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

7.09

23411

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

55.01

156118

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

76.35

265621

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

2.36

10912

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

110.75

23368

211

... More
Anicut Construction Badiya Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

144.25

38659

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

17.85

58940

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

111.48

316380

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

133.45

464272

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

10.84

50124

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

259

54649

211

... More
Pucca Check Dam near Bhilawad Ghisa ki Nal Sevantri

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

106.53

28550

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

10.43

34439

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

96.1

272731

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

116.9

406695

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

3.8

17571

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

150

31650

211

... More
Pucca Check Dam Causeway Rasta Ghisa ki Nal Sevantri

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

161.5

43282

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

12.94

42727

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

144.44

409920

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

127

441833

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

3.38

15629

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

159.5

33654

211

... More
Pucca Check Dam near Badla Ghisa ki Nal Sevantri

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

52.5

14070

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

7.88

26019

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

44.63

126659

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

83.55

290670

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

2.63

12161

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

127.5

26902

211

... More
Anicut Construction near Dinu khan oda Khajur Sevantri

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

147.75

39597

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

17.85

58940

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

114.98

326313

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

133.45

464272

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

10.84

50124

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

259

54649

211

... More
Pucca Check Dam Puthali Nadi Kankar ke niche Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

37

9916

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

4.99

16476

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

30.84

87523

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

45

156555

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

1.28

5918

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

82.5

17407

211

... More
Construction of Gabion Structure at Badiya Bansa

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

26

6968

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

3.9

12877

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

22.1

62719

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

15.6

54272

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

2.6

12022

4624

... More
Dry Stone Massonary for Gabion

20.02

47747

2385

... More
Construction of Gabion Structure at Gona nadi rasta Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

7.84

2101

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

1.12

3698

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

6.72

19071

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

6.72

23378

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

1.12

5178

4624

... More
Dry Stone Massonary for Gabion

6.72

16027

2385

... More
Construction of Gabion Structure at Puthali nal near Ajmeria Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

6.3

1688

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

1.05

3467

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

5.25

14899

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

6.3

21917

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

0.53

2450

4624

... More
Dry Stone Massonary for Gabion

6.3

15025

2385

... More
Construction of Gabion Structure at Badi Bor nal Bad ke Upar Umarwas

-

-

-

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

10.2

2733

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

1.7

5613

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

9.35

26535

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

10.2

35485

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

0.85

3930

4624

... More
Dry Stone Massonary for Gabion

10.2

24327

2385

... More
Renovation of WHS at Amba Bawdi Bad ke pass Umarwas

-

-

-

... More
Breaking of Old Plaster

74.75

1121

15

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

36.03

9656

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

10.51

34704

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

25.52

72425

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

6.66

23170

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

5.99

27697

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

134

28274

211

... More
Renovation of WHS at Alyari veri Umarwas

-

-

-

... More
Breaking of Old Plaster

63.8

957

15

... More
Excavation work by Machanical means(Hydrolic excavator)/ manual means in foundation tranches or drains not exceeding 1.50 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available.

5.67

1519

268

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8.

1.08

3566

3302

... More
Random rubble stone masonary for with hard stone in foundation and plinth in cement sand mortar above 30 cm thick wall in . 1:6

4.59

13026

2838

... More
Random rubble stone masonary for with hard stone in superstructure above plinth level and upto five level above 30 cm thick wall in . 1:6

45.42

158016

3479

... More
Providing and laying in position cement concreate including curing compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:2:4.

0.54

2496

4624

... More
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish. 25 mm

89.1

18800

211



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.