Forest Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Forest Department Tender

Works
Civil And Construction
Excavation
Agriculture or Forestry Works
Eprocure
Opening Date19 Nov 2024
Closing Date25 Nov 2024
Tender Amount₹ 1,27,33,000 
Notes
Download

Costs

  • EMD

    ₹ 2,54,660
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound (Total 1380 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (380Rm)

547.2

105

57565.44

... More
Hard Soil with above 50% Boulders (600 Rm)

864

141

121996.8

... More
In compact clays soil (400 Rm)

576

114

65664

... More
Layout for excavation of CCT/DEEP CCT

8500

-

5100

... More
Digging of continious contour trenches by Manually means of desired shape and (size (1.7+ 0.5 )/2 x0.6 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil (7000 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (2000Rm)

1320

220

290928

... More
Hard Soil Above 50% Boulders (2000Rm)

1320

282

372372

... More
In compact clays soil (3000 Rm)

1980

247

490644

... More
Digging of Deep continious contour trenches by mechanical means of desired shape and (size (1.5+ 0.5 )/2 x1 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil 1500 unning meter

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (900Rm)

900

105

94680

... More
In compact clays soil (600 Rm)

600

114

68400

... More
Layout for excavation of pits

10000

-

6000

... More
Digging of pits ( Size 0.60x0.60x0.60 cubie meter) by JCB Machine

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

34

119000

... More
In compact clays soil

3000

26

78300

... More
Hard Soil with above 50% Boulders

3500

31

110950

... More
Dressing of pits required size (size 0.60x0.60x0.60 Cubie meter) excavaterd by JCB

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

1

6650

... More
In compact clays soil

3000

1

5100

... More
Hard Soil with above 50% Boulders

3500

2

7700

... More
3 meter wide path for vehicles in Hillys areas

1000

22

22200

... More
In situ Soil & Moisture Conservation measures like Chek dam, Nadis, Earthen Bunds etc.

-

-

-

... More
In Soft/ordinary soil

1380

102

141726

... More
Juliflora Eradication by JCB machine Including cleaning of site

-

-

-

... More
30 cm Tree collar girth

8234

33

275015.6

... More
Pruning/Branch cutting (Cutting of branches in lower 1/3rd of the plant upto 2 meters height

1000

2

2100

... More
Purchase of signboards and their fixing

1

5000

5000

... More
Construction of pillar of appropiate size and fixing iron pipe gate with four square column

1

15000

15000

... More
Watch and Ward by one labour for 2 month.

2

6735

13470

... More
buying saplings for plantation (12.5x30cm)

10000

9

90000

... More
Misc. and unoreseen expenses including running of vehicles, building maintenance, stationary, photocopy, Desil, Petrol,Computer type etc

1

65033

65033.16

... More
Advance Soil Work Rodawad Range Palighat

-

-

-

... More
Survey of the area, demarcation & layout

50

87

4375

... More
Dividing the area in subplots and their semi permanent demarcation in field and preparation of map

50

232

11630

... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound (Total 1380 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (380Rm)

547.2

105

57565.44

... More
Hard Soil with above 50% Boulders (600 Rm)

864

141

121996.8

... More
In compact clays soil (400 Rm)

576

114

65664

... More
Layout for excavation of CCT/DEEP CCT

8500

-

5100

... More
Digging of continious contour trenches by Manually means of desired shape and (size (1.7+ 0.5 )/2 x0.6 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil (7000 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (2000Rm)

1320

220

290928

... More
Hard Soil Above 50% Boulders (2000Rm)

1320

282

372372

... More
In compact clays soil (3000 Rm)

1980

247

490644

... More
Digging of Deep continious contour trenches by mechanical means of desired shape and (size (1.5+ 0.5 )/2 x1 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil 1500 unning meter

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (900Rm)

900

105

94680

... More
In compact clays soil (600 Rm)

600

114

68400

... More
Layout for excavation of pits

10000

-

6000

... More
Digging of pits ( Size 0.60x0.60x0.60 cubie meter) by JCB Machine

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

34

119000

... More
In compact clays soil

3000

26

78300

... More
Hard Soil with above 50% Boulders

3500

31

110950

... More
Dressing of pits required size (size 0.60x0.60x0.60 Cubie meter) excavaterd by JCB

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

1

6650

... More
In compact clays soil

3000

1

5100

... More
Hard Soil with above 50% Boulders

3500

2

7700

... More
3 meter wide path for vehicles in Hillys areas

1000

22

22200

... More
In situ Soil & Moisture Conservation measures like Chek dam, Nadis, Earthen Bunds etc.

-

-

-

... More
In Soft/ordinary soil

1380

102

141726

... More
Juliflora Eradication by JCB machine Including cleaning of site

-

-

-

... More
30 cm Tree collar girth

8234

33

275015.6

... More
Pruning/Branch cutting (Cutting of branches in lower 1/3rd of the plant upto 2 meters height

1000

2

2100

... More
Purchase of signboards and their fixing

1

5000

5000

... More
Construction of pillar of appropiate size and fixing iron pipe gate with four square column

1

15000

15000

... More
Watch and Ward by one labour for 2 month.

2

6735

13470

... More
buying saplings for plantation (12.5x30cm)

10000

9

90000

... More
Misc. and unoreseen expenses including running of vehicles, building maintenance, stationary, photocopy, Desil, Petrol,Computer type etc

1

65033

65033.16

... More
Advance Soil Work Pipliya ka Bheru ji Range Baler

-

-

-

... More
Survey of the area, demarcation & layout

50

87

4375

... More
Dividing the area in subplots and their semi permanent demarcation in field and preparation of map

50

232

11630

... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound (Total 1380 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (380Rm)

547.2

105

57565.44

... More
Hard Soil with above 50% Boulders (600 Rm)

864

141

121996.8

... More
In compact clays soil (400 Rm)

576

114

65664

... More
Layout for excavation of CCT/DEEP CCT

8500

-

5100

... More
Digging of continious contour trenches by Manually means of desired shape and (size (1.7+ 0.5 )/2 x0.6 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil (7000 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (2000Rm)

1320

220

290928

... More
Hard Soil Above 50% Boulders (2000Rm)

1320

282

372372

... More
In compact clays soil (3000 Rm)

1980

247

490644

... More
Digging of Deep continious contour trenches by mechanical means of desired shape and (size (1.5+ 0.5 )/2 x1 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil 1500 unning meter

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (900Rm)

900

105

94680

... More
In compact clays soil (600 Rm)

600

114

68400

... More
Layout for excavation of pits

10000

-

6000

... More
Digging of pits ( Size 0.60x0.60x0.60 cubie meter) by JCB Machine

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

34

119000

... More
In compact clays soil

3000

26

78300

... More
Hard Soil with above 50% Boulders

3500

31

110950

... More
Dressing of pits required size (size 0.60x0.60x0.60 Cubie meter) excavaterd by JCB

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

1

6650

... More
In compact clays soil

3000

1

5100

... More
Hard Soil with above 50% Boulders

3500

2

7700

... More
3 meter wide path for vehicles in Hillys areas

1000

22

22200

... More
In situ Soil & Moisture Conservation measures like Chek dam, Nadis, Earthen Bunds etc.

-

-

-

... More
In Soft/ordinary soil

1380

102

141726

... More
Juliflora Eradication by JCB machine Including cleaning of site

-

-

-

... More
30 cm Tree collar girth

8234

33

275015.6

... More
Pruning/Branch cutting (Cutting of branches in lower 1/3rd of the plant upto 2 meters height

1000

2

2100

... More
Purchase of signboards and their fixing

1

5000

5000

... More
Construction of pillar of appropiate size and fixing iron pipe gate with four square column

1

15000

15000

... More
Watch and Ward by one labour for 2 month.

2

6735

13470

... More
buying saplings for plantation (12.5x30cm)

10000

9

90000

... More
Misc. and unoreseen expenses including running of vehicles, building maintenance, stationary, photocopy, Desil, Petrol,Computer type etc

1

65033

65033.16

... More
Advance Soil Work Kallaji Maharaj I Range Khandar

-

-

-

... More
Survey of the area, demarcation & layout

50

87

4375

... More
Dividing the area in subplots and their semi permanent demarcation in field and preparation of map

50

232

11630

... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound (Total 1380 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (380Rm)

547.2

105

57565.44

... More
Hard Soil with above 50% Boulders (600 Rm)

864

141

121996.8

... More
In compact clays soil (400 Rm)

576

114

65664

... More
Layout for excavation of CCT/DEEP CCT

8500

-

5100

... More
Digging of continious contour trenches by Manually means of desired shape and (size (1.7+ 0.5 )/2 x0.6 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil (7000 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (2000Rm)

1320

220

290928

... More
Hard Soil Above 50% Boulders (2000Rm)

1320

282

372372

... More
In compact clays soil (3000 Rm)

1980

247

490644

... More
Digging of Deep continious contour trenches by mechanical means of desired shape and (size (1.5+ 0.5 )/2 x1 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil 1500 unning meter

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (900Rm)

900

105

94680

... More
In compact clays soil (600 Rm)

600

114

68400

... More
Layout for excavation of pits

10000

-

6000

... More
Digging of pits ( Size 0.60x0.60x0.60 cubie meter) by JCB Machine

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

34

119000

... More
In compact clays soil

3000

26

78300

... More
Hard Soil with above 50% Boulders

3500

31

110950

... More
Dressing of pits required size (size 0.60x0.60x0.60 Cubie meter) excavaterd by JCB

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

1

6650

... More
In compact clays soil

3000

1

5100

... More
Hard Soil with above 50% Boulders

3500

2

7700

... More
3 meter wide path for vehicles in Hillys areas

1000

22

22200

... More
In situ Soil & Moisture Conservation measures like Chek dam, Nadis, Earthen Bunds etc.

-

-

-

... More
In Soft/ordinary soil

1380

102

141726

... More
Juliflora Eradication by JCB machine Including cleaning of site

-

-

-

... More
30 cm Tree collar girth

8234

33

275015.6

... More
Pruning/Branch cutting (Cutting of branches in lower 1/3rd of the plant upto 2 meters height

1000

2

2100

... More
Purchase of signboards and their fixing

1

5000

5000

... More
Construction of pillar of appropiate size and fixing iron pipe gate with four square column

1

15000

15000

... More
Watch and Ward by one labour for 2 month.

2

6735

13470

... More
buying saplings for plantation (12.5x30cm)

10000

9

90000

... More
Misc. and unoreseen expenses including running of vehicles, building maintenance, stationary, photocopy, Desil, Petrol,Computer type etc

1

65033

65033.16

... More
Advance Soil Work Kallaji Maharaj II Range Khandar

-

-

-

... More
Survey of the area, demarcation & layout

50

87

4375

... More
Dividing the area in subplots and their semi permanent demarcation in field and preparation of map

50

232

11630

... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound (Total 1380 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (380Rm)

547.2

105

57565.44

... More
Hard Soil with above 50% Boulders (600 Rm)

864

141

121996.8

... More
In compact clays soil (400 Rm)

576

114

65664

... More
Layout for excavation of CCT/DEEP CCT

8500

-

5100

... More
Digging of continious contour trenches by Manually means of desired shape and (size (1.7+ 0.5 )/2 x0.6 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil (7000 Rm)

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (2000Rm)

1320

220

290928

... More
Hard Soil Above 50% Boulders (2000Rm)

1320

282

372372

... More
In compact clays soil (3000 Rm)

1980

247

490644

... More
Digging of Deep continious contour trenches by mechanical means of desired shape and (size (1.5+ 0.5 )/2 x1 including dressing and laying of excavated soil in continues mound and dressing of mound In compact clays soil 1500 unning meter

-

-

-

... More
Hard Soil Above 30 to 50% Boulders (900Rm)

900

105

94680

... More
In compact clays soil (600 Rm)

600

114

68400

... More
Layout for excavation of pits

10000

-

6000

... More
Digging of pits ( Size 0.60x0.60x0.60 cubie meter) by JCB Machine

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

34

119000

... More
In compact clays soil

3000

26

78300

... More
Hard Soil with above 50% Boulders

3500

31

110950

... More
Dressing of pits required size (size 0.60x0.60x0.60 Cubie meter) excavaterd by JCB

-

-

-

... More
Hard Soil Above 30 to 50% Boulders

3500

1

6650

... More
In compact clays soil

3000

1

5100

... More
Hard Soil with above 50% Boulders

3500

2

7700

... More
3 meter wide path for vehicles in Hillys areas

1000

22

22200

... More
In situ Soil & Moisture Conservation measures like Chek dam, Nadis, Earthen Bunds etc.

-

-

-

... More
In Soft/ordinary soil

1380

102

141726

... More
Juliflora Eradication by JCB machine Including cleaning of site

-

-

-

... More
30 cm Tree collar girth

8234

33

275015.6

... More
Pruning/Branch cutting (Cutting of branches in lower 1/3rd of the plant upto 2 meters height

1000

2

2100

... More
Purchase of signboards and their fixing

1

5000

5000

... More
Construction of pillar of appropiate size and fixing iron pipe gate with four square column

1

15000

15000

... More
Watch and Ward by one labour for 2 month.

2

6735

13470

... More
buying saplings for plantation (12.5x30cm)

10000

9

90000

... More
Misc. and unoreseen expenses including running of vehicles, building maintenance, stationary, photocopy, Desil, Petrol,Computer type etc

1

65033

65033.16



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.