Forest Department Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Forest Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 Jan 2025
Closing Soon20 Jan 2025
Tender Amount₹ 1,73,39,000 
Notes
Download

Costs

  • EMD

    ₹ 3,46,780
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 2,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone wall fencing: Random rubble loose stone fencing of size .80 m at base, .60 m at top and 1.20 m high (rates are for volume including voids) 400 running mtr 2.2.1.5 Repair of stone wall fencing

336

186

62563.2

... More
Layout for excavation of contour tranch/dyke /v-ditch

151700

-

91020

... More
Layout for excavation of pits 2A3

74000

-

44400

... More
Construction of inspection path 7400 rmt

7400

12

89540

... More
constructions of contour Dyke with cross sections 30cmx30cm on uper slope and sowing of suitable thorny shrub species along th inner side 18500 rmt

1665

268

446719.5

... More
Digging of V-Ditchwith.45cmx.45cm cross sectionson moddle slopes and V-Ditch in slope less than 6% as per the side conditions as per side requirement 33000 rmt In hard muram /kankar/compect clay soil

6682.6

114

761816.4

... More
Digging of V-Ditchwith.45cmx.45cm cross sectionson moddle slopes and V-Ditch in slope less than 6% as per the side conditions as per side requirement 3000 rmt In hard soil Between 30 To 50% Boulders

607.5

105

63909

... More
Digging of V-Ditchwith.45cmx.45cm cross sectionson moddle slopes and V-Ditch in slope less than 6% as per the side conditions as per side requirement 3000 rmt In hard soil Between Above 50% Boulders

607.5

141

85779

... More
Construction of Earthen Bunds,checkdam,perculation Tank in Hard soil Boulders

59155

114

6743670

... More
Digging of contour trenches with cross sections size .45cmx.45cm 83200 rmt In hard muram /kankar/compect clay soil

16848.1

114

1920683.4

... More
Digging of contour trenches with cross sections size .45cmx.45cm 13000 rmt =2632.50 cumIn hard Soil Above 50% Boulders

2632.5

141

371709

... More
Digging of Ditch by Mechanical means of desired shape and size: 1.2 m deep,1.5 m wide at top and 0.9 m wide at bottom, includes dressing (Vol.per running meter m=1.44 cum) 2.2 including dressing and laying of excavated soil in continues mound and dressing of mound In hard moram/cankar/ compact clays 21895 running meter

31528.8

114

3594283.2

... More
Digging of pits (size 0.45 m x0.45 mx0.45m or (0.50+0.40) /2X (0.50+0.40) /2x0.45 cubic meter) In hard muram /kankar/compect clay soil

74000

26

1931400

... More
Providing and fixing T-iron frames for doors, windows and ventilators of mild steel Tee-sections, joints mitred and welded with 15x3 mm lugs 10cm long embedded in cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or with wooden plugs and screws or rawl plugs and screws or with fixing clips or with bolts and nuts as require including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer.gate and door

1164

83

96612

... More
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil

41.76

175

7308

... More
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).

10.44

3302

34472.88

... More
Random Rubble masonry with hard stone in cement sand mortar including curing and mixing of mortar in foundation in ration Cement Mortar 1:6 ( 1-Cement : 6-Sand).for kattle guard hut and gate piller

12.6

2838

35758.8

... More
Random Rubble masonry with hard stone in cement sand mortar including curing and mixing of mortar in foundation in ration Cement Mortar 1:6 ( 1-Cement : 6-Sand)..for kattle guard hut and gate piller

112.92

3479

392838.24

... More
25 mm thick cement plaster on new surface of walls in two coats including smooth finishing in cement sand mortar in ratio 1:6 including curing etc. complete.for kattle guard hut and gate piller

587.94

227

133461.47

... More
White washing with lime to give an even shade including all scaffolding:.for kattle guard hut and gate piller

587.94

11

6467.3

... More
Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In Charge

84

1648

138432



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.