Forest Department Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 16,800Document Cost
₹ 500Tender Fee
₹ 500
Summary
Construction Of Rcc Post Post Barbard With Barbard Wire And Weldmess Jali Fensing Work 2750 Rmt And Other Work Sds Ranasar Pawran 25 Hec Range Sardarshahar
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FORES_440219_1Tender No
10936Tender Authority
Forest Department ViewPurchaser Address
-Website
http://eproc.rajasthan.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Procument of Prestressed Concrete Post of Height 2.40m x(At Bottom 15 x10cm)x(Top 10x10cm) cement concrete blocks 1:3:6(1cement:3coarse:6graded stone aggregate 20mm nominal size)Made of 8thin wire(300Stand pole 54 Doagonally pole)
542
450
243900
... More
Providing and laying in position cement concrete including
curing, compaction etc. complete in specified grade excluding
the cost of centering and shuttering - All work up to plint3.1.6 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 size .30 x .30 x .45=.0405 cum per post ( .0405 x 542 post)=21.95 cum
21.95
3302
72478.9
... More
Angle Iron/ wooden post and Barbed wire Fencing Fixing of angle iron with block at site
542
16
9208.58
... More
Material loading/unloading and stacking including voids. 4.46.4 Barbed wire & other heavy item
46.45
15
700
... More
Angle Iron/ wooden post and Barbedwire Fencing Streching of barbed wire and fixing it with the post with GI wire/with Nut Bolt 2750x4=11000Rmt
11000
1
16170
... More
Angle Iron/ wooden post and Barbed wire Fencing Binding welded wire mess jali of 1.50 meter height and 30 meter length with GI wire at 2 meter interval including local transportation and cutting brushwood etc 2750rmt
2750
5
13860
... More
Construction Of Cattle Guard Hut
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming and disposal of surplus excavated soil as directed within a lead of 50 meter. All kinds of soil. (Soil Excavation Work for Foundation of Cattle Guard Hut )
0.98
178
173.91
... More
According to PWD BSR - Item No 5.1, 5.1.7- Brick masonary in foundation and plinth with bricks of class designation 75 mm in ,Cement Mortar 1:6 (1-Cement:6-coarse sand). Brick Massonary Work in Cattle Guard Hut
5.9
4263
25160.94
... More
According to Pwd Bsr Item No 12.8.1 Plaster on new surface on walls in cement sand mortar 1:4 including raking of joints etc. complete fine finish: 25 mm thick.
46.82
227
10627.69
... More
According To Pwd Bsr Item no 10.11.1 Providing brick kharanja in lime sand mortar 1:2 in square pattern over roof of ground floor
4.44
277
1230.1
... More
According to Pwd Bsr Item No. 12.49 Distempering with dry distemper of approved brand and shade (two or more coats) and of required shade on new work, over and including, priming coat of whiting to give an even shade including all scaffolding. (paint Work in cattle guard hut)
42.38
53
2245.99
... More
laying of cement tin sheets on roof including fixing
1
2000
2000
... More
Construction of Gate Piller
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to 1.5 Mtr. including taking out the excavated soil and depositing and refilling of jhiri with watering and ramming and disposal of surplus excavated soil as directed within a lead of 50 meter. All kinds of soil. (Soil Excavation Work for Foundation of Cattle Guard Hut )
0.32
178
57.67
... More
According to PWD BSR - Item No 5.1, 5.1.7- Brick masonary in foundation and plinth with bricks of class designation 75 mm in ,Cement Mortar 1:6 (1-Cement:6-coarse sand). Brick Massonary Work in Cattle Guard Hut
1.62
4263
6906.06
... More
According to Pwd Bsr Item No 12.8.1 Plaster on new surface on walls in cement sand mortar 1:4 including raking of joints etc. complete fine finish: 25 mm thick.
9.36
227
2124.72
... More
According to Pwd Bsr Item No. 12.49 Distempering with dry distemper of approved brand and shade (two or more coats) and of required shade on new work, over and including, priming coat of whiting to give an even shade including all scaffolding. (paint Work
9.36
53
496.08
... More
Construction Of Gate AND SINE BOARD Plantation gate size.. Height 5feet x width 5.5 feet double leaf gate ,gate frame 1.5 x1.5 inch 2mm thick squre pipe ,one horizontal pipe in the middle ,GI mess 4 mmwith 2 x2 inch gape on both side of which a latch has to fitted with colour
1
8000
8000
... More
Tree plantation sigh board size make a frame of 4 feet x 3 feet using angle iron 35 x 35 x5 mm and fix 18 gauge iron sheet in the middle of which 8 feet long angle size 35 x35 x5 mm with holl pass has to be fixed on both sides with colour and write the name of the plantation site in colour along with the year and plan
1
5000
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%