Bharat Sanchar Nigam Limited Tender

... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Bharat Sanchar Nigam Limited - BSNL Tender

Services
Eprocure
Opening Date23 Feb 2021
Closing Date16 Mar 2021
Tender Amount₹ 22,43,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
iii) in Rocky soil(Soft) (OFTSR)

1

-

120

... More
iv) in Rockky soil(Hard) (OFTHR)

1

-

550

... More
Excavation by manual tunneling or boring and reinstatement as per construction specification of the tender to a depth of 1.65M or more in Bituminised/ Concrete/ Set stone for single PLB Pipe(including Laying charges) (OFB)

1

-

140

... More
Laying of PLB HDPE duct by HDD method at a depth of 2M or more BSNL will supply HDPE/PLB Pipes & other accessories (OFH)

-

-

-

... More
i) Single PLB pipe

2000

-

180

... More
ii) Two to three pipe

1

-

240

... More
iii) Four to Seven pipe

1

-

300

... More
Laying of PLB HDPE pipe/GI pipe/RCC pipe/DWC BSNL will supply HDPE/PLB Pipes & other accessories (LPH)

-

-

-

... More
i) Laying of single HDPE/PLB pipes/Coils,Coupled with Coupler

1

-

5

... More
ii) Laying of two HDPE/PLB pipes/Coils,Coupled with Coupler

1

-

10

... More
iii) Laying of three/four HDP/PLBE pipes/Coils,Coupled with Coupler

1

-

14

... More
Laying and fixing of 80 mm/65 mm/40 mm G.I. Pipes in trenches with PLB/ HDPE pipes/coils inside and drawing PP rope. BSNL will supply G.I.Troughs/GI pipes in lengths approx 6M clamps and PLB HDPE pipes/Coils (LGIT)

1

-

10

... More
Laying/ clamping/ fixing of 65 mm/40 mm G.I. Pipes on Bridges and Culverts horizontally/ Vertically and leading in BSNL Customer premises with laying HDPE/ PLB pipes/coils inside. All material will be supplied by contractor except G.I. pipes. (LGIC)

1

-

20

... More
Road/ Rail crossing through horizontal boring method / HDD mehtod and inserting 80/65/40 dia GI pipes and pushing HDPE/ PLB pipes/ Coil inside. BSNL will supply G.I.Troughs/GI pipes in lengths approx 6M clamps and PLB HDPE pipes/Coils (LGIH) i) Depth shall be 2M and above without GI protection. ii) Depth is less than 2M with GI protection as applicable.

1

-

180

... More
Laying of full round RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,on culverts/bridges/nulla and for cases where cable is laid at less depth(wherever required) BSNL will supply RCC full round/RCC half split pipe(ISI Mark)or DWC full round pipe/DWC half -split pipe(as per TEC GR No:- GR/DWC-34/01 sep 2007 with latest amendment and coupler. Materials required for sealing the coupling of RCC/DWC pipes will be arranged by the contractor (LFRC)

-

-

-

... More
i) Full Round RCC pipe

1

-

10

... More
ii) Full Round DWC pipe

1

-

10

... More
Laying of half-split RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,onculverts/bridges/nulla and for cases where cable is laid at less depth(wherever required) BSNL will supply RCC full round/RCC half split pipe(ISI Mark)or DWC full round pipe/DWC half -split pipe(as per TEC GR No:- GR/DWC-34/01 sep 2007 with latest amendment and coupler. Materials required for sealing the coupling of RCC/DWC pipes will be arranged by the contractor (LSRC)

-

-

-

... More
i) Half Split RCC pipe

1

-

6

... More
ii) Half Split DWC pipe

1

-

6

... More
Providing cement concrete 1:2:4 at wheel guard of bridge/culvert over the toe or in the trench for protection. PLB HDPE ducts,GI pipes, will be supplied by the BSNL. All other materials required for the work shall be arranged by the contractor.Rates include cost of material and standard curring,shuttering etc. and transportation from store. (PCCT)

1

-

4000

... More
Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh in the trenches for protection,where the depth is less than 120cm(cement concrete as per specification). PLB HDPE ducts,GI pipes, will be supplied by the BSNL. All other materials required for the work shall be arranged by the contractor.Rates include cost of material and standard curring,shuttering etc. and transportation from store. (PCCM)

1

-

4000

... More
Cable laying by pulling/Blowing

-

-

-

... More
Laying of OFC by pulling/blowing method in new duct including opening of manhole,sealing of PLB HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/PLB/ RCC split pipes in manhole/ back filling of manholes. PLB HDPE pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor. (OFPB)

2000

-

8

... More
Laying of OFC by pulling/blowing method in existing duct /Leading -In in BSNL/customer premises, including cleaning of chocked pipe as per construction specifications. PLB HDPE pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor.(OFPB)

4000

-

14

... More
Splicing of Fibres in existing/new joint chambers for making straight/Branch joints on new routes or at FPOI and end to end testing of all fibres after splicing.Including fixing of Joint Closure. Note:- All tools,Splicing machine and instruments required for above work shall be arranged by the contractor.(SSBJ)

-

-

-

... More
i) up to 12 F OF cable

200

-

2000

... More
ii) 24 F OF cable

100

-

3000

... More
iii) 48 F OF cable

10

-

5500

... More
iv) 96 F OF cable

30

-

7500

... More
v) 288 F OF cable

1

-

12000

... More
vi) A ribbon of OF cable

1

-

2500

... More
Splicing of all Fibres in the fiber Termination box and testing all the fibres for continuity.This will also include installation/mounting of the FTB as specified. Note:- All tools,Splicing machine and instruments required for above work shall be arranged by the contractor.(SFTB)

-

-

-

... More
i) up to 12 F OF cable

10

-

2000

... More
ii) 24 F OF cable

6

-

3000

... More
iii) 48 F OF cable

2

-

5500

... More
iv) 96 F OF cable

2

-

7500

... More
v) 288 F OF cable

1

-

12000

... More
vi) A ribbon of OF cable

1

-

2500

... More
Splicing of Overhead OF cable upto 6 Fibre (SOHOF)

50

-

750

... More
Jointing Chamber

-

-

-

... More
Digging of pit for Jointing chamber and construction of Bricks joints chamber, filling of brick chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on brick chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document. All materials required for the work shall be arranged by the contractor (JCBR)

1

-

3500

... More
Digging of pit for Jointing chamber and construction of Pre febricated RCC chamber, filling of Pre febricated RCC chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on Pre febricated RCC chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document. All materials required for the work shall be arranged by the contractor (JCRC)

5

-

2500

... More
Providing, Construction and Fixing of RCC Manholes at site as per construction specification given in the tender document, work includes excavation of pits for the man hole. All materials required for the work shall be arranged by the contractor. (JCMH)

1

-

40000

... More
Route Indicator

-

-

-

... More
Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor. (RIBD)

1

-

60

... More
Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator and concreting of route/Joint indicator, painting and sign writing of route/Joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor. (RIBC)

1

-

200

... More
Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator with concreting route/Joint Indicator, Painting and sign writing route/joint indicator. (RICC)

1

-

450

... More
Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. (RICD)

20

-

300

... More
Restoration of Road surface

-

-

-

... More
Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface(total upto 75mm thick),including supply of asphalt etc.to evenly match the road,including consolidation and rolling as per standard specification of DSR 1997. All materials required for the work shall be arranged by the contractor(RRSB)

1

-

100

... More
Road restoration work with cement concrete 1:4:8: mix for thickness varying from 150mm to 225mm,including supply of concrete to evenly match the road. All materials required for the work shall be arranged by the contractor (RRSC)

1

-

2000

... More
Decumantetion containing digram as per E.I. including Lat/Long each joint/route indicator on good quality papers (DRID)

-

-

-

... More
(i) 2 Hard copy and 1 soft copy

2

-

250

... More
(ii) 6 Hard copy and 1 soft copy

1

-

400

... More
Laying of OFC in buildings(Leading in work)

-

-

-

... More
laying of OFC in corridor/risers/exchange premises with PLB pipe without G.I. Pipe (leading in work) (LOIB)

1

-

12

... More
Mounting of FDMS at OLT locations

-

-

-

... More
Physical mounting of FDMS on wall at OLT locations. (MFDO)

1

-

250

... More
Recovery of store

-

-

-

... More
Recovery of empty OF Cable Drum(All Type OF CABLE)

1

-

300

... More
Hiring of JCB for Exposing of PLB Pipe. (JCB)

100

-

800

... More
Digging out of pits of Size 1MX 1M X 2 M for exposing the OFC and Refilling in Kaccha Soil (PITK1)

100

-

500

... More
Digging out of pits of Size 1MX 1M X 2 M for exposing the OFC and Refilling in Pucca Soil .(PITP1)

100

-

620

... More
Digging out of pits of Size 2MX 1M X 2 M for exposing the OFC and Refilling in Kaccha Soil (PITK2)

200

-

900

... More
Digging out of pits of Size 2MX 1M X 2 M for exposing the OFC and Refilling in Pucca Soil (PITP2)

200

-

1150

... More
Opening of covers and Cleaning of the Manhole of the existing Duct and Refixing of the covers of Manhole. (MHO)

40

-

600

... More
Raising of 200mm thick RCC walls of OFC Manhole up to existing Road Level up to avarage Hight of raising 0.30M with cement concerte 1:2:4 including fixing the steel iron angle 150mm*100mm*6mm on outer wall as frame on the RCC wall of size 1.80m*1.40m all complete as per construction specification (MHR)

10

-

7000

... More
O/H erection of 2F/4F/6F OFC on existing poles/alignment (including transportation of material from BSNL store to site and binding/clamping material. (OHE)

4000

-

3.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.