Bharat Sanchar Nigam Limited Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 16,844Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_220198_1Tender No
RJCO-23/11(11)/34/2024-TX AND MMTender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
ii) In Pucca Soil
500
83
41840
... More
ii) In Soft Rock Soil /Disintegrated (D.I.) Soil
3000
113
339120
... More
iii) in Rocky soil/Hard Rock Soil
500
430
215275
... More
Excavation and trenching including tunneling or boring and reinstatement as per construction specification of tender to a depth of 1.65 mtrs in bituminized/ concrete/set stone (rate per meter) for single PLB pipe.
-
180
-
... More
Laying of PLB HDPE duct by HDD method at a depth of 1.65 mtrs or more ( for single PLB pipe ) in Soft Soil
-
198
-
... More
Laying of PLB HDPE duct by HDD method at a depth of 1.65 mtrs or more (for single PLB pipe) in Rocky Soil
-
2050
-
... More
Road/Rail crossing through horizontal boring method and inserting 65/40 Dia G.I./DWC pipes & pushing HDPE Pipe/Coils inside & drawing PP rope.
-
385
-
... More
Laying of PLB HDPE Pipe/GI Pipes/RCC Pipe/DWC
-
-
-
... More
Laying of single PLB HDPE Pipes/Coils, coupled with coupler
4000
4
18720
... More
Laying and fixing of G.I. Pipes (Medium duty class having inner diameter of 50mm, as per ISI specifications) in trenches with PLB pipe HDPE Pipes/Coils inside
-
16
-
... More
Laying and fixing G.I. pipes(Medium duty class having inner diameter of 50mm, as per ISI specification) in trenches on Bridges and Culverts with PLB HDPE pipes/Coils inside
-
21
-
... More
Laying and fixing of G.I.65mm Pipes (Medium duty class having inner diameter of 50mm, as per ISI specifications) in trenches with PLB pipe HDPE Pipes/Coils inside (G.I. Pipe supplied by Contractor)
-
360
-
... More
The BSNL will supply G.I. troughs/GI Pipes in lengths of approx. 6M clamps and PLB HDPE Pipes/Coils. (Wherever it may be applicable)
-
-
-
... More
Lying of full round RCC (ISI mark)/DWC pipe (As per existing TEC GR no. GR/DWC-34/01 sep-2007 with latest amendments) in trenches over PLB HDPE pipes/coils, on culverts/bridges/Nula and for cases where cable is laid at less depth (wherever required)
-
19
-
... More
Laying of half- split RCC(ISI Mark)/DWC pipe (as per existing TEC GR no GR/DWC-34/01 sep 2007 with latest amendment) in trenches over PLB HDPE pipes /coils, on culverts/ bridges/nula/and for cases where cable is laid at less depth (wherever required)
-
12
-
... More
Providing cement concrete 1:2:4 at Wheel guard of bridge/culvert over the toe or in the trench for protection 25cm* 25cm over 40mm Dia PLB pipe
-
3360
-
... More
Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh (as per specification of tender) in the trenches for protection, where the depth is less than 120 Cms (Cement Concrete as per specification) 25cm* 25cm over 40mm Dia PLB pipe
-
3900
-
... More
Cable laying by pulling/blowing
-
-
-
... More
Laying of OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes (6F,12F,24F)
4000
6
24000
... More
Laying of 48F OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes
-
9
-
... More
Laying of 96F & Above OF Cable by Pulling/blowing method including opening of Manhole, Sealing of PLB HDPE Pipes
-
11
-
... More
Pulling/blowing method of any type of OF Cable in existing Doct/HDPE Pipes
-
20
-
... More
Splicing of OF Cable
-
-
-
... More
Splicing of fibers in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost (6F,12F & 24F)
8
4000
32000
... More
Splicing of all the fibers of 6F, 12F & 24F) OF cable in the fibre termination box at the Gram Panchayats and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified.
-
4000
-
... More
Splicing of fibers (48F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost
-
5500
-
... More
Splicing of all the fibers of (48F) OF cable in the fibre termination box (FDMS) at the Exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified.
-
5500
-
... More
Splicing of fibers (96F) in existing/new Joint chambers for making straight/branch joints on new routes or at FPOI and end to end testing of all fibers after splicing. Including installation cost
-
7500
-
... More
Splicing of all the fibers of (96F) OF cable in the fibre termination box (FDMS) at the exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified.
-
7500
-
... More
Splicing of all the fibers of (128F) OF cable in the fibre termination box (FDMS) at the exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified.
-
9000
-
... More
Splicing of all the fibers of (128F) OF cable in the fibre termination box (FDMS) at the exchanges and testing all the fibers for continuity. This will also include installation/mounting of the FTB/WSC as specified.
-
9000
-
... More
Jointing Chamber
-
-
-
... More
Construction of Bricks joints chamber as per specification and the construction practice as specified in the tender document
-
4500
-
... More
Construction of pre fabricated RCC joints chamber as per specification and the construction practice as specified in the tender document
8
5000
40000
... More
Digging of pits for Existing Joint Chamber, filling of Joint Chamber with clean sand & back filling of jointing pit as per tender specifications.
-
1000
-
... More
Route Indicator
-
-
-
... More
Digging of pit 1 mtr towards jungle side on each main hole/joint chamber for fixing of route/joint indicator fixing & concreting of route/joint /route indicator painting & sign writing of route including supply of Joint/route indicator
8
447
3576
... More
Restoration of road surface
-
-
-
... More
Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface ( total up to 75mm thick ), including supply of asphalt etc. to evenly match the road, including consolidation and rolling as per standard specification of DSR 1997
-
90
-
... More
Road restoration work with cement concrete 1:4:8 mix for thickness varying from 150mm to 225mm, including supply of concrete to evenly match the road.
-
1600
-
... More
Laying of OF Cable in building (Leading in work)
-
-
-
... More
Laying of OF cable in corridor/risers/exchange premises (leading work)
-
10
-
... More
Recovery of Store
-
-
-
... More
Recovery of empty 24F cable Drum
2
400
-800
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%