Bharat Sanchar Nigam Limited Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 2,19,820Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
OFC construction work and allied activities for Rehabilitation (Patch work) in Alwar SSA
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_BSNL_399829_1Bid Award Id
ViewTender No
T-601 /e-Tender /OFC/Rehabilitation/Alwar SSATender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://www.bsnl.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
iii) in Rocky soil(Soft) (OFTSR)
1500
150000
100
... More
iv) in Rockky soil(Hard) (OFTHR)
800
312000
390
... More
Excavation by manual tunneling or boring and reinstatement as per construction specification of the tender to a depth of 1.65M or more in Bituminised/ Concrete/ Set stone for single PLB Pipe(including Laying charges) (OFB)
1
110
110
... More
Laying of PLB HDPE duct by HDD method at a depth of 2M or more BSNL will supply HDPE/PLB Pipes & other accessories (OFH)
-
-
-
... More
i) Single PLB pipe
28800
5184000
180
... More
ii) Two to three pipe
1
240
240
... More
iii) Four to Seven pipe
1
300
300
... More
Laying of PLB HDPE pipe/GI pipe/RCC pipe/DWC BSNL will supply HDPE/PLB Pipes & other accessories (LPH)
-
-
-
... More
i) Laying of single HDPE/PLB pipes/Coils,Coupled with Coupler
27500
110000
4
... More
ii) Laying of two HDPE/PLB pipes/Coils,Coupled with Coupler
1
8
8
... More
iii) Laying of three/four HDP/PLBE pipes/Coils,Coupled with Coupler
1
12
12
... More
Laying and fixing of 80 mm/65 mm/40 mm G.I. Pipes in trenches with PLB/ HDPE pipes/coils inside and drawing PP rope. BSNL will supply G.I.Troughs/GI pipes in lengths approx 6M clamps and PLB HDPE pipes/Coils (LGIT)
1
8
8
... More
Laying/ clamping/ fixing of 65 mm/40 mm G.I. Pipes on Bridges and Culverts horizontally/ Vertically and leading in BSNL Customer premises with laying HDPE/ PLB pipes/coils inside. All material will be supplied by contractor except G.I. pipes. (LGIC)
1
15
15
... More
Road/ Rail crossing through horizontal boring method / HDD mehtod and inserting 80/65/40 dia GI pipes and pushing HDPE/ PLB pipes/ Coil inside. BSNL will supply G.I.Troughs/GI pipes in lengths approx 6M clamps and PLB HDPE pipes/Coils (LGIH) i) Depth shall be 2M and above without GI protection. ii) Depth is less than 2M with GI protection as applicable.
1
180
180
... More
Laying of full round RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,on culverts/bridges/nulla and for cases where cable is laid at less depth(wherever required) BSNL will supply RCC full round/RCC half split pipe(ISI Mark)or DWC full round pipe/DWC half -split pipe(as per TEC GR No:- GR/DWC-34/01 sep 2007 with latest amendment and coupler. Materials required for sealing the coupling of RCC/DWC pipes will be arranged by the contractor (LFRC)
-
-
-
... More
i) Full Round RCC pipe
1
8
8
... More
ii) Full Round DWC pipe
1
8
8
... More
Laying of half-split RCC(ISI Mark)/DWC pipe(as per existing TEC GR No:- GR/DWC-34/01 Sep 2007 with latest amendment)in trenches over PLB HDPE Pipes/coils,onculverts/bridges/nulla and for cases where cable is laid at less depth(wherever required) BSNL will supply RCC full round/RCC half split pipe(ISI Mark)or DWC full round pipe/DWC half -split pipe(as per TEC GR No:- GR/DWC-34/01 sep 2007 with latest amendment and coupler. Materials required for sealing the coupling of RCC/DWC pipes will be arranged by the contractor (LSRC)
-
-
-
... More
i) Half Split RCC pipe
1
4
4
... More
ii) Half Split DWC pipe
1
4
4
... More
Providing cement concrete 1:2:4 at wheel guard of bridge/culvert over the toe or in the trench for protection. PLB HDPE ducts,GI pipes, will be supplied by the BSNL. All other materials required for the work shall be arranged by the contractor.Rates include cost of material and standard curring,shuttering etc. and transportation from store. (PCCT)
1
2000
2000
... More
Providing cement concrete 1:2:4 over the PLB HDPE PIPE with wire mesh in the trenches for protection,where the depth is less than 120cm(cement concrete as per specification). PLB HDPE ducts,GI pipes, will be supplied by the BSNL. All other materials required for the work shall be arranged by the contractor.Rates include cost of material and standard curring,shuttering etc. and transportation from store. (PCCM)
1
2200
2200
... More
Cable laying by pulling/Blowing
-
-
-
... More
Laying of OFC by pulling/blowing method in new duct including opening of manhole,sealing of PLB HDPE Pipes by Rubber Bushes in Manholes, providing HDPE/PLB/ RCC split pipes in manhole/ back filling of manholes. PLB HDPE pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor. (OFPB)
56300
394100
7
... More
Laying of OFC by pulling/blowing method in existing duct /Leading -In in BSNL/customer premises, including cleaning of chocked pipe as per construction specifications. PLB HDPE pipe shall be provided by the BSNL. All other materials required for the work shall be arranged by the contractor.(OFPB)
1
12
12
... More
Splicing of Fibres in existing/new joint chambers for making straight/Branch joints on new routes or at FPOI and end to end testing of all fibres after splicing.Including fixing of Joint Closure. Note:- All tools,Splicing machine and instruments required for above work shall be arranged by the contractor.(SSBJ)
-
-
-
... More
i) up to 12 F OF cable
164
492000
3000
... More
ii) 24 F OF cable
12
36000
3000
... More
iii) 48 F OF cable
1
5500
5500
... More
iv) 96 F OF cable
48
360000
7500
... More
v) 288 F OF cable
1
12000
12000
... More
vi) A ribbon of OF cable
1
2500
2500
... More
Splicing of all Fibres in the fiber Termination box and testing all the fibres for continuity.This will also include installation/mounting of the FTB as specified. Note:- All tools,Splicing machine and instruments required for above work shall be arranged by the contractor.(SFTB)
-
-
-
... More
i) up to 12 F OF cable
1
3000
3000
... More
ii) 24 F OF cable
1
3000
3000
... More
iii) 48 F OF cable
1
5500
5500
... More
iv) 96 F OF cable
1
7500
7500
... More
v) 288 F OF cable
1
12000
12000
... More
vi) A ribbon of OF cable
1
2500
2500
... More
Splicing of Overhead OF cable upto 6 Fibre (SOHOF)
1
750
750
... More
Jointing Chamber
-
-
-
... More
Digging of pit for Jointing chamber and construction of Bricks joints chamber, filling of brick chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on brick chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document. All materials required for the work shall be arranged by the contractor (JCBR)
1
3500
3500
... More
Digging of pit for Jointing chamber and construction of Pre febricated RCC chamber, filling of Pre febricated RCC chamber with clean sand (Bajri only), supply and placing of pre cast/ stone slabs on Pre febricated RCC chamber and back filling of jointing pit as per specification and the construction practice as specified in the tender document. All materials required for the work shall be arranged by the contractor (JCRC)
1
3500
3500
... More
Providing, Construction and Fixing of RCC Manholes at site as per construction specification given in the tender document, work includes excavation of pits for the man hole. All materials required for the work shall be arranged by the contractor. (JCMH)
1
36000
36000
... More
Route Indicator
-
-
-
... More
Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor. (RIBD)
1
50
50
... More
Digging of pits 1M towards jungle side or Road Side or on the trench/ Manhole/ Joint Chamber for fixing of route/ Joint Indicator and concreting of route/Joint indicator, painting and sign writing of route/Joint indicator. BSNL will supply Route/Joint Indicator, all the other material required for the work will be arranged by the contractor. (RIBC)
1
160
160
... More
Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator with concreting route/Joint Indicator, Painting and sign writing route/joint indicator. (RICC)
282
107160
380
... More
Supply of route indicator( Stone/RCC) , including Digging of pit 1 meter towards jungle side or road side or on the trench/manhole/joint chamber for fixing of route/joint indicator directly buried i.e.without concreting route/Joint Indicator, Painting and sign writing route/joint indicator. (RICD)
1
270
270
... More
Restoration of Road surface
-
-
-
... More
Road restoration work with bituminous macadam for semi grouting 50mm thick and premix carpet surfacing 25mm thick over the grouted surface(total upto 75mm thick),including supply of asphalt etc.to evenly match the road,including consolidation and rolling as per standard specification of DSR 1997. All materials required for the work shall be arranged by the contractor(RRSB)
1
90
90
... More
Road restoration work with cement concrete 1:4:8: mix for thickness varying from 150mm to 225mm,including supply of concrete to evenly match the road. All materials required for the work shall be arranged by the contractor (RRSC)
1
1600
1600
... More
Route Index Diagram
-
-
-
... More
Supply of route index diagram in hard copy (6 copies with spiral binding) as well as soft copy on CD for complete work. The contractor shall arrange all materials required for the work. (DRID)
56.3
11260
200
... More
Videography of the route on which cable is laid. The contractor shall arrange all materials required for the work. (VLCR)
1
300
300
... More
Laying of OFC in buildings(Leading in work)
-
-
-
... More
laying of OFC in corridor/risers/exchange premises with PLB pipe without G.I. Pipe (leading in work) (LOIB)
1
10
10
... More
Mounting of FDMS at OLT locations
-
-
-
... More
Physical mounting of FDMS on wall at OLT locations. (MFDO)
1
250
250
... More
Recovery of empty OF Cable Drum
-
-
-
... More
i) up to 12 F OF cable
1
300
300
... More
ii) 24 F OF cable
1
300
300
... More
iii) 48 F OF cable
1
300
300
... More
iv) 96 F OF cable
1
300
300
... More
v) 288 F OF cable
1
300
300
... More
Hiring of JCB for Exposing of PLB Pipe. (JCB)
100
75000
750
... More
Digging out of pits of Size 1MX 1M X 2 M for exposing the OFC and Refilling. (PIT1)
100
35000
350
... More
Digging out of pits of Size 2MX 1M X 2 M for exposing the OFC and Refilling. (PIT2)
200
140000
700
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements