Archaeological Survey Of India Tender
... More
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 93,028Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ASI_793830_1Bid Award Id
ViewTender No
3/135/JPR/2023-24-WTender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling/taking out existing bulged / out of plumb & loose stone of the fortwall very very carefully including sorting out and stacking the serviceable stone at a suitable place for reuse and making the stack of unserviceable material for measurement and disposal of unserviceable material etc complete.
82.35
-
-
... More
Removal/taking out the dead weathered/cracked/damaged Plaster of thickness average (40-45) mm of side walls and on top of the gate then disposal of the unserviceable material with lead upto 100mts and lift upto 5 mts etc complete.
933.8
-
-
... More
Random rubble stone masonry for restoration of fallen/damaged/borken fortwall and bastion etc (with collected stone from nearby area) with lime surkhi mortar 1:1:1 (1 Lime : 1 Surkhi : 1 C. Sand) coarse sand from banas river mixed in garath with traditional cohesive material i.e. Belgiri, Gum, Gud matching the original etc complete.
424.34
-
-
... More
R.R. stone masonry of kangura etc (with collected stone from nearby area) with 1:1:1 lime surkhi mortar (1lime : 1surkhi : 1coarse sand) mixed with adhesive material like Gud, Belgiri and babool gum (mortar to be prepared in garath) including curing etc complete.
9.6
-
-
... More
Plastering of kangura, arch, widow, bastion etc in 40-45mm avg. thick lime surkhi plaster (1 lime :1 surkhi : 1 coarse sand) as per old traditional practice (mortar to be prepared in garath) in three coat of base course and subsequent course and low temping beating till the shrinkage cracks disappear then the work is done as per the required work of restoration with lead 50 mtr and lift 5mtr approx etc complete.
1021.8
-
-
... More
Providing & laying the 3mm thick lime punning with special mortar with lime, gum, jute, urad dal, seashells, & marble dust of similar to original & preparing the surface for lime punning complete in all respect as per directions given by engineer-in-charge.
1021.8
-
-
... More
Recess pointing on Stone Masonry with lime mortar (mortar to be prepared in garath) 1:1:1 (1lime : 1c.sand : 1brick surkhi) mixed with adhesive material etc complete.
471.25
-
-
... More
Disposal of unwanted waste material / malba received from the site during the work after stacking and measuring by mechanical transportation upto lead of 5 km from site area for site clearance and good appearance. (Note - It is for estimate purpose only actual qty. will be measured and recorded during execution of the work)
16.8
-
-
... More
Erection and dismantling scaffolding with wooden ballies and bamboo challies for execution of work including hiring and carrying the scafoldding material from shop to working site then back to shop etc complete.
781
-
-
... More
Water tanker 5000 ltr capacity for masonry work and water curing purpose.
45
-
-