Ajmer Smart City Limited Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 4,56,000Document Cost
₹ 10,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ASCL_180446_1Bid Award Id
ViewTender No
ASCL/NIT-41/2019-20/588-589Tender Authority
Ajmer Smart City Limited ViewPurchaser Address
-Website
http://https://smartnet.niua.org/users/ajmer-smart-city-limited
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 8.0 km
13280
-
162.9
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 9.0 km
6978
-
173.2
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 10.0 km
4923
-
183.5
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 11.0 km
5449
-
183.6
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 12.0 km
6558
-
192.2
... More
Carriage of material (By Mechanical Means) carriage of Materials by Mehanical transport including loading, unloading and stacking: Sand Bazri Ballast, Kankar for 13.0 km
5312
-
200.8
... More
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Dismantling Stone Masonry Rubble stone masonry in cement mortar.
401.63
-
256
... More
Random rubble masonry work in cement mortar with mechanical mixer in substructure/ super structure at all levels complete as per clause 1400 and 2200 of MoRT&H specification including all material, labour, scaffolding etc. but excluding pointing and plastering.
401.63
-
3440
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc. upto two stories, excluding the cost of centring, shuttering and finishing : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
10.4
-
5030
... More
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Raised and cut pointing
661.5
-
260
... More
Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m.
1687.5
-
98
... More
Construction of embankment with approved materials deposited at site available from roadway cutting and excavation from drain and foundation of other structures, graded and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 as per MoRT&H specification clause 305.
7875
-
64
... More
Earth work in excavation in open area, STP, WTP, Pumping station with mechanical means including dressing of sides and ramming of bottoms, including getting out the excavated material, disposal of excavated material lead upto 1000m at suitable site as per as per drawing and as per direction of Engineer. (Measurements for payment to be done as per standard drawings).: In all type of soil Upto 3.0 m depth
3375
-
116