Ajmer Development Authority Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 25,000Document Cost
₹ 500Tender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_ADA_212529_1Bid Award Id
ViewTender No
NIT No 23/2020-21Tender Authority
Ajmer Development Authority ViewPurchaser Address
-Website
http://www.adaajmer.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
For Subsequent days
2200
-
417
... More
Hire charges for light point with lamp.asrequired for shops/ stalls
500
-
6
... More
Hire charges for light point with lamp.asrequired for shops/ stalls For Subsequent days
5000
-
3
... More
Hire charges for power/light plug on board as requiredfor shops/ stalls
85
-
35
... More
Hire charges for power/light plug on board as requiredfor shops/ stalls For Subsequent days
850
-
17.5
... More
Hire charges for tube light fixture with 28 watt T5 lamp as required.
120
-
18
... More
For Subsequent days
1200
-
9
... More
Hire charges for Silent type D.G. Set, including Operator ,change over switch. Control panel etc. and excluding POL as required.of following capacity 62.5 KVA
4
-
4095
... More
Hire charges for Silent type D.G. Set, including Operator ,change over switch. Control panel etc. and excluding POL as required.of following capacity For Subsequent days
40
-
2047.5
... More
Supply and filling of POL for DG sets
2500
-
11
... More
Hire charges of Main service line for 3 phase connection upto 50 mtr. Length including meter board, dist. Board and supports as required Upto 25.0 sq.mm size cable
460
-
300
... More
Hire charges of Main service line for 3 phase connection upto 50 mtr. Length including meter board, dist. Board and supports as required For Subsequent days
460
-
150
... More
Hire charges of Main service line for 3 phase connection upto 50 mtr. Length including meter board, dist. Board and supports as required above 25.0 sq.mm & upto 95 Sq.mm
14
-
500
... More
Hire charges of Main service line for 3 phase connection upto 50 mtr. Length including meter board, dist. Board and supports as required For Subsequent days
14
-
250
... More
Hire charges of Sub service line for single/ three phase connection upto 30 mtr. Length including dist. Board and supports as required Single phase upto 6 Sqmm
950
-
125
... More
Hire charges of Sub service line for single/ three phase connection upto 30 mtr. Length including dist. Board and supports as required For Subsequent days
950
-
62.5
... More
Hire charges of Sub service line for single/ three phase connection upto 30 mtr. Length including dist. Board and supports as required Three phase & neutral upto 10 Sqmm
600
-
150
... More
Hire charges of Sub service line for single/ three phase connection upto 30 mtr. Length including dist. Board and supports as required For Subsequent days
600
-
75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements