Ajmer Development Authority Tender

If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.

Ajmer Development Authority - ADA Tender

Services
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2022
Closing Date30 Dec 2022
Tender Amount₹ 2,34,00,000 
Notes
Download

Costs

  • EMD

    ₹ 4,68,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 1,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Center table sunmica Top 2' x 4' Subsequent day

125

-

15

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton Durry (Old) floor covering Ist Day

4000

-

2

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton Durry (Old) floor covering Subsequent day

50000

-

0.6

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete White cotton chadar (sheet) (washed) Ist Day

4500

-

20

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete White cotton chadar (sheet) (washed) Subsequent day

65000

-

2

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Pipe pandal with covering ht form 12 to 18 ft Ist Day

3500

-

30

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Pipe pandal with covering ht form 12 to 18 ft ISubsequent day

40000

-

10

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSubsequent day Non woven synthtic carpet (Red/Green) (New)Ist day

21000

-

25

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeNon woven synthtic carpet (Red/Green) (New)Subsequent day

260000

-

15

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Dunlop mattress with white chadar size 6'x3'. Ist Day

125

-

40

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Dunlop mattress with white chadar size 6'x3'.Subsequent day

150

-

12

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . Ist Day

5000

-

25

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete .Subsequent day

65000

-

7

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed with Tent. (15'x6') Ist Day

500

-

40

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed with Tent. (15'x6')Subsequent day

7000

-

15

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed without Tent. (15'x6') Ist Day

600

-

50

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed without Tent. (15'x6')Subsequent day

7500

-

10

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton mattress with white sheet (chader). Ist Day

750

-

24

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton mattress with white sheet (chader).Subsequent day

12000

-

10

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Massand with white cover. Ist Day

200

-

14

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Massand with white cover.Subsequent day

3000

-

5

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete PVC chair Ist Day

300

-

9

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete PVC chair Subsequent day

4500

-

2

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSteel pipe pedded chair Ist Day

125

-

30

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSteel pipe pedded chair Subsequent day

2000

-

10

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water Proof Tent with pipe pandal supported with Bamboo/Balli /MS Pipe frame.. Ist Day

4500

-

90

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeWater Proof Tent with pipe pandal supported with Bamboo/Balli /MS Pipe frame.. Subsequent day

65000

-

25

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeVIP Chair with cushion Ist Day

125

-

100

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeVIP Chair with cushion Subsequent day

2000

-

40

... More
Wooden stage height 60cm.with steps complete Ist day

4500

-

48

... More
Wooden stage height 60cm.with steps complete Subsequent Day

65000

-

12

... More
Water Proof Tripal. Ist day

4500

-

10

... More
Water Proof Tripal.Subsequent Day

65000

-

4

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water proof dome with truss steel strcture, inner ceiling & curtains 60' span Ist Day

16725

-

225

... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water proof dome with truss steel strcture, inner ceiling & curtains 60' span Subsequent day

200000

-

45



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.