Ajmer Development Authority Tender
If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 4,80,000Document Cost
₹ 2,000Tender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ADA_435058_1Bid Award Id
ViewTender No
No. 2587-2603 Dated 04.12.2024 (1)Tender Authority
Ajmer Development Authority ViewPurchaser Address
-Website
http://www.adaajmer.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
Center table sunmica Top 2' x 4'
Subsequent day
125
15
1875
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
Cotton Durry (Old) floor covering Ist Day
4000
2
8000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
Cotton Durry (Old) floor covering Subsequent day
50000
-
30000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
White cotton chadar (sheet) (washed) Ist Day
5500
20
110000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
White cotton chadar (sheet) (washed) Subsequent day
80000
2
160000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
Pipe pandal with covering ht form 12 to 18 ft
Ist Day
5000
30
150000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete
Pipe pandal with covering ht form 12 to 18 ft
ISubsequent day
60000
10
600000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSubsequent day Non woven synthtic carpet (Red/Green) (New)Ist day
7500
25
187500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeNon woven synthtic carpet (Red/Green) (New)Subsequent day
100000
15
1500000
... More
Non woven synthtic carpet (Red/Green) (old)Ist day
25000
20
500000
... More
Non woven synthtic carpet (Red/Green) (old)Subsequent day
280000
5
1400000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Dunlop mattress with white chadar size 6'x3'. Ist Day
125
40
5000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Dunlop mattress with white chadar size 6'x3'.Subsequent day
1250
12
15000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete . Ist Day
6000
25
150000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Curtain cloth (View cutter ) made out of steel pipe frame covering with good quality white cloth to cut view including making holes and made necessary strengthening support against wind pressure complete .Subsequent day
75000
7
525000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed with Tent. (15'x6') Ist Day
750
40
30000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed with Tent. (15'x6')Subsequent day
7500
15
112500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed without Tent. (15'x6') Ist Day
750
50
37500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Kanat fixed without Tent. (15'x6')Subsequent day
7500
10
75000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton mattress with white sheet (chader). Ist Day
950
24
22800
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Cotton mattress with white sheet (chader).Subsequent day
13000
10
130000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Massand with white cover. Ist Day
300
14
4200
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Massand with white cover.Subsequent day
3500
5
17500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete PVC chair Ist Day
425
9
3825
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete PVC chair Subsequent day
4500
2
9000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSteel pipe pedded chair Ist Day
150
30
4500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeSteel pipe pedded chair Subsequent day
2100
10
21000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water Proof Tent with pipe pandal supported with Bamboo/Balli /MS Pipe frame.. Ist Day
5400
90
486000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeWater Proof Tent with pipe pandal supported with Bamboo/Balli /MS Pipe frame.. Subsequent day
67000
25
1675000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeVIP Chair with cushion Ist Day
125
100
12500
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing completeVIP Chair with cushion Subsequent day
1510
40
60400
... More
Wooden stage height 60cm.with steps complete Ist day
4500
48
216000
... More
Wooden stage height 60cm.with steps complete Subsequent Day
65000
12
780000
... More
Water Proof Tripal. Ist day
5000
10
50000
... More
Water Proof Tripal.Subsequent Day
73500
4
294000
... More
Barricading with Sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect & including dressing of sides and providing retro reflective tapes for traffic safety as per direction of Engineer-in charge in all types of soil. Ist Day
1500
33
49500
... More
Add extra for item No. 5.18 & 5.19 in barricading for each subsequent day after 3 days
19000
36
684000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water proof dome with truss steel strcture, inner ceiling & curtains 60' span Ist Day
17000
225
3825000
... More
Hire charges including transportation at site within Municipal limits loading unloading placing and removing complete Water proof dome with truss steel strcture, inner ceiling & curtains 60' span Subsequent day
200000
45
9000000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements