Water Supply And Sanitation Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Supply And Sanitation Department - WSS Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Aug 2024
Closing Date9 Oct 2024
Tender Amount₹ 8,11,463
Costs
EMD
₹ 16,229Document Cost
₹ 1,000Tender Fee
₹ 958
Summary
Dwss Jarbiwal
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WSS_126328_1Tender No
DWSS JARBDIWALTender Authority
Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://https://dwss.punjab.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Note : 1. Erection of dismantling of boring plant including all arrangement for the transportation of the boring equipment to site of work from the store of contractor at site and back are to be made by the contractor at his own cost. All rates should be quoted for supplying the material at site of work for collection of water and water for drilling tubewell to be arranged by the firm/contractor at site at his own cost.
2.In case the bore is converted into a tubewell payment of bore shall be made up to the bail plug, plus margin (7% of main bore drilling or as actual as per field requirement whichever is less) required for sustaining the main bore paid at the rate of beyond margin shall be paid at the rate of test bore drilling.
-
-
-
Drilling of test bore hole including the rate for logging (Electric logging shall be carried out by Contractor upto full depth) to be paid only for the drilling depth beyond the bail plug margin or the tubewell is abandoned (TO BE PAID AS PER ACTUAL )
-
-
-
Making electric logging of borehole with electronic well logger including cost of equipment at site etc.complete in all respect.
1
16696
16696
Supplying, lowering of MS Pipe as per IS: 4270-2001 including MS sockets having dimensions as per IS code duly welded with MS electrode to have extra strength to lower the pipe into tubewell bore.
-
-
-
150 mm nominal diameter (weight 21.6 kg per meter) 5.4 mm thickness
136
342171
2515.97
Supplying, Fixing & Lowering of Stainless Steel Cage type wire wound screen as per IS:8110-2000 or latest ISI marked, Duly welded with suitable grade S.S welding electrode to lower the strainer into tubewell bore.
-
-
-
150 mm steel strainer (slot size 0.75 mm) 5.00 mm thick
10
62242
6224.29
Supplying, Fixing and Lowering of Stainless Steel Socket as per IS 8110-2000 or latest, ISI marked duly welded with suitable grade SS welding electrod to lower the strainer into tubewell bore complete in all respect.
-
-
-
150 mm internal diameter
6
26061
4343.58
Supplying, Lowering and Fixing of M.S. special socket to connect SS Strainer to M.S. Pipe duly welded with suitable grade welding electrode complete in all respect.
-
-
-
150 mm internal diameter
6
5007
834.53
Supplying and fixing mild steel centering guides made out of 32mm X 6mm thick M.S bar complete in all respect.
5
1531
306.35
Supplying at site Wooden box of suitable size with Lid & locking arrangment for preserving strata sample collected from the bore.
1
608
608.53
Collection of Sieve sample from different strata and testing of sample from approved laboratory
2
590
295
Supplying at site of Gravel of 1/16" to 1/8" sizes including pouring and packing in the annual space between the pipe assembly and the bore. The gravel should be free from dust, dirt, or the vegetable manner as per IS 4097-1967 with latest amendments(to be paid as per actual length of pipe)
27
47303
1751.97
Supplying and fixing M.S well cap having thread to fix on housing pipe complete in all respect.
-
-
-
150 mm internal diameter
1
417
417.73
Supplying & fixing of bail plug of M.S. pipe complete with inverted U-hook attached to the bottom plug complete in all respect.
-
-
-
150mm internal diameter (weight 21.60 kg per meter) 5.4 mm thickness
4
8504
2126.05
Supplying & fixing of M.S. Clamp of size 150mm x 12mm made out of MS Flat 1.52 m long, suitable to fit the Housing pipe including the cost of Nut & Bolts of suitable size complete in all respect.
1
2816
2816.25
Development and stabillizing of the tubewell with air compressor of required capacity as directed by the Engineer-in-charge including cost of tools, appliances & consumable to the satisfaction of Engineer-in-charge.
-
-
-
Capacity of Air compressor 300 cfm at 250 PSI
10
35098
3509.82
Development of stabillizing of the tubewell with submersible pump of required capacity as directed by the Engineer-in-charge including cost of tools, appliances & consumable to the satisfaction of Engineer-in-charge.
6
11448
1908.09
Testing of water sample for Heavy metal from approved laboratory (Toxic material such as Arsenic, lead, mercury, pesticide etc.)
1
5981
5981
Provision for sterilisation of Tubewell and clay seal of 3 mtr thick As per BIS 2800:2019 complete in all respect.
1
5000
5000
PUMPING MAIN
-
-
-
Providing, Laying, fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-charge) along the Trenches and laying the same in Trenhes to correct alignment and gradients, cutting, jointing and testing complete as per specifications (Excavation mechanically)
-
-
-
90 mm o/d pipe of 10kg/cm2 PVC Pipe
20
10985
549.29
Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze (gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing, testing & cost of Nuts, Bolts & insertion sheet, all carriage complete (with the approval of Engineer - in – charge)
Class PN-1 as per ISI
-
-
-
80 mm i/d Sluice Valves flanged
2
8861
4430.64
Construction of masonry sluice valve chamber excluding Sluice valve cover as per standard design & drawings of public health department
-
-
-
(size 0.6 m X 0.6 m)
2
11179
5589.83
Providing, laying, jointing, fixing and testing 90mm o/d PVC pipe with existing 100 C.I with 1 NO. CI A/F tee3"x4" and 2 No 3" flange cutting jointing with rubber jain & nut bolt complete all respect (For making connection with existing 90mm i/d PVC Rising main and by pass)
1
3666
3666
GRAVEL PIT OUTSIDE THE PUMP CHAMBER.
-
-
-
Construction of Gravel Pit outside the Pump Chamber. (0.90m Dia.) as per standard design & drawings of public health department.
1
17737
17737.73
CREDIT FOR OLD MATERIAL
-
-
-
Sluice Valve
2
-1500
750
NOTES:- 1. Items for which no rate or price is entered by the bidder will not be paid for by the Employer when executed and shall be deemed covered by the other rates and prices in the Bill of Quantities. (Refer ITB Clause 13.2 and GCC Clause40.2).
2. Item for which no rate of price has been entered in the bid will not be paid for by the employer when executed and shall be deemed covered by the other rates and prices in the bill of quantities 3. Unit rates and prices shall be quoted by the bidder in INR 4. Where the reisdiscrepancy between the rates in figures and words, the rate in words will prevail 5. Where there is discrepancy between the unit rate and the line item,total resulting from multiplying the unit rate by quantity, the unit rate quoted shall prevail 6. The payment of lump sum item will be paid according to CSR rates as per actual work do neat site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements