Water Supply And Sanitation Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Supply And Sanitation Department - WSS Tender

Works
Eprocure
Opening Date24 Jun 2024
Closing Date9 Jul 2024
Tender Amount₹ 35,69,767 
Notes
Download

Costs

  • EMD

    ₹ 71,395
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 4,212

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PVC pipe 63 mm o/d

944.48

208952

221.24

... More
PVC pipe 90 mm o/d

112.2

41843

372.94

... More
PVC pipe 160mm o/d

66.75

67367

1009.25

... More
Excavation by Manual means (for Less than 3 mtr street width)

-

-

-

... More
PVC pipe 63 mm o/d

449.52

116498

259.16

... More
PVC pipe 160mm o/d

297.9

315406

1058.77

... More
Dismantling brick or flagged stone flooring without concrete base and relaying of dry brick on edge paving with a dismantled bricks including sand grouting and including restoration of roads to orginal Position

-

-

-

... More
PVC pipe 63mm o/d

383.81

17386

45.3

... More
PVC pipe 90mm o/d

297.9

14895

50

... More
Dismantling and re-fixing of interlocking Tile

65.71

11145

169.61

... More
Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze (gunmetal) working parts Sluice Valves ISI marked 14846-2000, including jointing, testing & cost of Nut, Bolt & insertion sheet, all carriage complete (with the approval of Engineer - in – charge)(IVC/ Kirloskar/Audco or equivalent make as per IS code.)

-

-

-

... More
80mm I/d

2

8861

4430.64

... More
100mm I/d

1

6016

6016.61

... More
Construction of masonry sluice valve chamber excluding Sluice valve cover as per standard design & drawings of public health department.

-

-

-

... More
Size 0.60 x 0.60 m

3

16769

5589.83

... More
Making Connection with existing pipe line

8

13231

1654

... More
HOUSE SERVICE CONNECTIONS Provision for re-water connection to household upto wall including cost of excavation and labour charges for dismantel clemp ferrule G.I & HDPE pipe C.I bib cock and reffiting the same in position complete in all respect. (Part Rate) Reconnections

13

10901

838.59

... More
CHLORINATION & DISINFECTION Prov. & Fixing Electronically actuated, Diaphragm Operated, Metering System, Chemical Dosing Chlorinator, suitable for delivering 0.5 to 6 Litres of Bleaching Powder solution/ Sodium Hypo solution per hour under maximum delivery pressure upto 7 Kg.cm2, and suction lift not less than 1.5 m, as per DWSS standard specifications.

1

17000

17000

... More
PUMP CHAMBER AND SANITARY LATRINE Construction of Pump Chamber size 3.05 x 3.70 m, including toilet block, including cost of electric wiring and Sanitary installation as per standard design complete in all respect.

1

395000

395000

... More
Providing & fixing G.I. Barbed wire 3 ply fencing around the head works site in three rows complete in all respects including cost of winding wire & aluminum painting complete in all respects as per standard Drawing

275

5225

19

... More
Providing and Fixing precast pre-stressed cement concrete fencing pole M-40 by 4 Nos. parallel high tensile entwined wire (ISI marked wire 4 mm dia fencing pole size at bottom 4" x 4", size top 3" x 4",Lenght 6ft, hooks 6 No. including cost of excavation, sand filling and erection complete in all respects..

37

16095

435

... More
Providing & fixing D.Hook complete with MS Bolts size 300mm x 18mm as per standard Drawing

30

5400

180

... More
Construction of brick masonry corner pillar including cost of cement pointing including cost of material complete in all respects as per standard Drawing

4

28160

7040

... More
Construction of masonry gate pillar including cost of MS Steel Gate size 1.22mtr x 1.37 mtr as per standard Drawing complete in all respects

1

30300

30300

... More
Construction of Cement Concrete, Foot Path with masonry toe wall & earth filling inside water works as per standard Drawing

30

73500

2450

... More
Providing & fixing MS Sign Board as per standard size of DWSS as per drawing

1

8075

8075

... More
Carriage of Material (Sand & Bazri)

-

-

-

... More
Sand

55.71

28945

519.58

... More
Bazri

79.46

26693

335.94

... More
Bricks

15.12

15432

1020.69

... More
Tiles

0.51

526

1033.18

... More
Operation & Maintenance Cost excluding Electricity Charges Operation and Maintenance water supply system for 3 Months including operating of machinery , repair of leakages, supplying of full time Pump Operator cum- Chowkidar, Supply of sodium hyprochloride solution for Disinfection for 3 months after completion complete in all respect.

1

50340

50340

... More
Environmental Management Charges Making lawns including ploughing & dragging with 'Sohaga' breaking of clods, removal of earth rubbish dressing & Supplying doob grass roots and planting at 15 cm. apart including Supplying and spreading of farm yard manure@ 0.18 cum per 100 sqm & loosening.

212

3158

14.9

... More
Supplying and planting permanent trees including digging of earth pits size 75cmx75cmx75 cm deep, refilling the excavated earth with manure supplied @ 0.113 cum each and watering Supplying through tractor tanker. (Trees like Neem, Ashoka, Dake, Arjun etc.)

8

2626

328.27

... More
Planting ground cover plants including digging and refilling of beds with excavated soil and FYM, Fertilizer and insecticides, planting of saplings at 30cm distance from plant to plant and row to row, providing and fixing brick tiles edging.

8

1722

215.25

... More
Planting flower beds including digging and refilling of beds with excavated soil and FYM, fertilizer and insecticides, planting of sapling at 30cm distance from plant to plant and row to row.

7

1614

230.63

... More
Provision for one way stand post with Khura complete in all respects

1

2675

2675.89

... More
Item for which no rate or price has been entered it will not be paid for by the Employer when executed and shall be deemed covered by the rates and prices in the Bill of Quantities.

-

-

-

... More
Unit rates and prices shall be quoted by the bidder in Indian rupee.

-

-

-

... More
Where there is a discrepancy between the rate in figures and words, the rates in words will govern.

-

-

-

... More
Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall govern.

-

-

-

... More
Any item of work not included in the above contract schedule of rates and got done at the site of work; the same will be paid according to CSR-2020+ C.P. subject to the premium or discount tendered by the contractor. In the case of non-schedule items, the decision of the Engineer-in-charge will be final and binding upon the contractor. In case any item which is a part of lump-sum rate is not executed at site, the amount of the same shall be deducted @CSR rates + Ceiling premium prevailing on the date of tender.

-

-

-

... More
The work will be carried out in accordance with PWD Book of specifications – 1963 edition with upto date amendments.

-

-

-

... More
Approximate quantities are given in the contract schedule of rates and these can vary at the time of execution of the work. The payment will be made according to the actual work done by the contractor.

-

-

-

... More
All amendments issued on the common schedule of rates 2020 + C.P. up to the date of opening of tenders will be applicable on the contract schedule of rates.

-

-

-

... More
Contractor should clearly quote his rates in figures & words. Conditional tender will be rejected.

-

-

-

... More
All items and rates provided in the DNIT are subject to the footnotes given in CSR-2020 + C.P..

-

-

-

... More
The Engineer-in-charge will have full powers to change the layout of the work covered in this contract if considered necessary.

-

-

-

... More
No claim will be entertained from the contractor in case, any mistake in description rates or unit occurs in any item taken in this schedule while preparing this DNIT or on account of typing or comparison or over writing. The same will be rectified at any time as per common schedule of rates 2020 +C.P. along with up to date amendments.

-

-

-

... More
The arrangement of bricks at site of work would be done by the contractor at his own level from his own source.

-

-

-

... More
For any other non-schedule items, the contractor will submit through Engineer-in-charge, the analysis of rates in triplicate based on purchased vouchers. A margin of 10% shall be allowed for the material components and 21.5% on labour components and contractor shall produce photo stat copies of the purchase vouchers in support of his claim. The decision of the Engineer-in-charge/competent authority in the matter shall be final and binding on the contractor.

-

-

-

... More
All the extra items will be got approved from the competent authority and no premium will be allowed on non schedule items.

-

-

-

... More
Pavement for the carriage of material shall be paid as per the rates quoted by the tenderer.

-

-

-

... More
Time period allowed for completion of work in 9 months.

-

-

-

... More
If contractor allowed for completion of work within 7 days from the date of allotment, DWSS reserve the right to impose penalty or withdraw the work and propose action for debarring in future tendering or both; decision of Chief Engineer, (North) shall be binding.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.