Water Supply And Sanitation Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 7,60,000Document Cost
₹ 1,000Tender Fee
₹ 5,900
Summary
Sewerage Scheme Assarpur Block Sanour
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_WSS_77572_1Tender No
Sewerage Scheme Assarpur Block SanourTender Authority
Water Supply And Sanitation Department ViewPurchaser Address
-Website
http://https://dwss.punjab.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
For depth 3.0 mt. to 4.5 Mt
1496.19
-
-
Providing & fixing timbering on face of trenches if required for sewer & manholes for item no.29.4 and 29.5 irrespective of depth measuring each timbered surface of trench on which timbering is done Type II polling board frame system type timbering
-
-
-
For trench having width up to 1.0 Mtr.
19419
-
-
For trench having width above 2.0 Mtr. up to 3.0 Mtr.
2648
-
-
Exra for filling earth in 15 cm layers and compaction.For item no. 29.1 to 29.2 & 29.4 to 29.5
12480.33
-
-
Cement Conc .1:6:12
381.02
-
-
Cement Conc .1:2:4
23.38
-
-
RCC M-30 (in F & P)
141.96
-
-
B.B. in 1:5 in Foundation & Plinth
240.54
-
-
B.B. in 1:5 in Super structure
604.03
-
-
12.5 mm thick cement plaster in 1:2
2559
-
-
Cement rendering on plaster 1mm th.
2559
-
-
20 mm thick cement plaster in 1:2
229.5
-
-
Centring & Shutter ing for Vertical surfaces
545.26
-
-
Centring & Shutter ing for flat surfaces
516.63
-
-
Prov. Lowering,Cutting & Jointing of UPVC pipes into trenches
-
-
-
110 mm o/d
1275
-
-
160 mm o/d
3045
-
-
200 mm o/d
1492
-
-
250 mm o/d
1026
-
-
315 mm o/d
1791
-
-
Prov.& fixing of RCC Man hole covers & frames including cem. Conc. Coping 1:2:4 around the frame.
-
-
-
560 mm i/d (heavy duty)
333
-
-
Prov.of orange color safety footrest including fixing in manholes with cem. Conc. block 1:2:4 complete
1447
-
-
Cold twisted deformed steel
126.65
-
-
Floating coat of 1.5 mm thick neat cement laid in one operation to the topping
412
-
-
Add difference of rate of Steel
126.65
-
-
Add difference of rate of bricks in Patiala Distt. (Total Bricks - 405394/ 1000 = 405.394)
405.39
-
-
Add difference of rate of cement.
3626
-
-
Less difference of rate of sand in Patiala Distt. (Lohandkhad)
241.85
-
-
Less difference of rate of bajri 12mm in Patiala Distt. (Mirthal)
132
-
-
Less difference of rate of bajri 40mm in Patiala Distt.(Mirthal)
314
-
-
Cost of Fine sand to be poured around UPVC pipes as per Quarry site rate+Contractor Profit
772
-
-
Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone Boulders, Kankar and Building Rubbish, Earth
-
-
-
Carriage of Bajri 12 mm (Mirthal)
-
-
-
Up to 223 Km ( 228-005 )
132
-
-
Carriage of Bajri 40 mm (Mirthal)
-
-
-
Up to 223 Km ( 228-005 )
314
-
-
Carriage of Coarse sand (Lohandkhad)
-
-
-
Up to 147 Km (152-005)
241.85
-
-
Carriage of Fine Sand ( Phill)
-
-
-
up to 90 Km (95-05)
1009.68
-
-
Dismantling of Bituminuos courses of flxible pavements by mechanical means and disposal of dismantled materials upto a lead of 1000 meters, stacking serviceable and unserviceable materials seperately as per technical clause 202 of MORT& H specifications
818.21
-
-
Dismentalling of Brick or flage stone flooring with conc .base
928.86
-
-
Dismantling brick or flagged stone flooring without concrete base
1938.4
-
-
Dismentalling of Cement Concrete 1:6 :12 with 40mm gauage stone
130.25
-
-
Dismentaling of C.Con (1:2:4)
40.43
-
-
Earth work excavation in ordinary soil exclusive of compensation of earth
-
-
-
Kassi work undressed
357.78
-
-
Cement Concrete 1:8:16 with 40mm gauage stone
223.64
-
-
Prov. & laying 60 mm thick factory made C.Conc.interlocking tiles M35
768.4
-
-
Reconditiong of Metalled Road with dismantled and new material
4813
-
-
Providing surface coating on metalled road
4813
-
-
Laying Of C. Conc (1:2:4) ( By manual mean)
40.43
-
-
Dry brick on Edge paving sand grouted over 50mm thick brick aggregate
-
-
-
60% with dismentaled bricks
557.32
-
-
40%with New bricks
371.54
-
-
Making connection of sewer line with existing manhole etc. complete.
255
-
-
Excavation manually in trenches for pipe lines with straight or open cutting in streets and lanes in builtup area where width of street / Lane from wall to wall is less than 3 meter including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. Providing & fixing caution boards, watching, fencing, etc. and removal of surplus soil from the site upto 15 meter distance complete in all respects.
1287
-
-
Dismantling/taking out AC/PVC Pipe from trench as per site.
1950
-
-
Relaying of dismantled Water supply line, fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications.
90mm o/d pipe of 6 Kgf. / sqcm
-
-
-
With New material @ 40%
780
-
-
With old material @ 60%
1170
-
-
Extra for Providing & fixing specials @ 5% of pipe cost.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements