If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date21 Oct 2024
Closing Date30 Oct 2024
Tender Amount₹ 1,27,67,672 
Notes
Download

Costs

  • EMD

    ₹ 2,55,353
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leads. Disposal/Carriage from 450m to 1Km.

15639.85

-

-

... More
Dressing of earthwork for new work or remodeling work.

30488.67

-

-

... More
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. (Supply and fixing Distance Marker).

4.1

-

-

... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leads, lead = 4.37 km including first 3.2 km pucca and last 1.17 km kacha. Disposal/Carriage from 3Km to 4Km.

15639.85

-

-

... More
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e; Concrete R.C slab and cement masonary. with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Non Petrolling side).

4

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil by Mechanical means depth upto 3 m.

141.11

-

-

... More
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.

16028.62

-

-

... More
Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge.

13770.15

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per Sqm as on prepared bed and side slopes before laying concrete on bed and side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.

15869.17

-

-

... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. (Supply and fixing Distance Marker).

0.93

-

-

... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth. (Providing and Fixing APM Outlet on Petrolling side).

7.74

-

-

... More
Laying LDPE film of 150 microm over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.

114.12

-

-

... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with Discharge upto 9cum/s including boundary road Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. Discharge upto 1.5 Cum/sec.

4.23

-

-

... More
Filling Contraction Joint with special impervious hot pour 12.5mm wide.

175.01

-

-

... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth. (Providing and Fixing APM Outlet on Non Petrolling side).

13.92

-

-

... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leads, lead = 4.37 km including first 3.2 km pucca and last 1.17 km kacha. Disposal/Carriage from 4Km to 4.37Km.

15639.85

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering). (Providing and Fixing APM Outlet on Non Petrolling side).

27.28

-

-

... More
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets (including excavation, refilling, consolidation and dressing) . with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Non Petrolling side).

4

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M25 Height upto 5m using concrete mixer.

37.06

-

-

... More
Sand filling in Foundation trenches as per drawing and Technical Specification.

43.03

-

-

... More
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete. (Providing and Fixing APM Outlet on Petrolling side).

0.45

-

-

... More
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete. (Supply and fixing boundary pillars).

0.81

-

-

... More
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Non Petrolling side).

4

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (Lining + sleeper + coping).

1039.57

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 With Batching Plant, Transit mixer and concrete pump. Mixer and Concrete Pump.

17.08

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type.

0.64

-

-

... More
Cement Concrete 1:4:8 with Stone Ballast 40 mm gauge mixing by mechanical means. (Providing and Fixing APM Outlet on Petrolling side).

2.49

-

-

... More
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete. (Providing and Fixing APM Outlet on Non Petrolling side).

0.52

-

-

... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leads, lead = 4.37 km including first 3.2 km pucca and last 1.17 km kacha. Disposal/Carriage from 2Km to 3Km.

15639.85

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering). (Providing and Fixing APM Outlet on Petrolling side).

8.89

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976. (0.25 ft= 7.6 cm (min wt 68 kg)).

2

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in foundation and plinth. (Supply and fixing boundary pillars).

1.08

-

-

... More
Earthwork for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (From 0 to 1.50 mtr depth)

3671.52

-

-

... More
Filling Contraction joint with special impervious Hot Pour as per PWD specifications and engineer in charge.

4394.62

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976. (0.20 ft= 6.1 cm (min wt 65kg)).

1

-

-

... More
Extra for rolling to specifications.

16028.62

-

-

... More
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets (including excavation, refilling, consolidation and dressing) . with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Petrolling side).

1

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.

1636.45

-

-

... More
Cement Concrete 1:4:8 with Stone Ballast 40 mm gauge mixing by mechanical means. (Providing and Fixing APM Outlet on Non Petrolling side).

6.36

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

244.39

-

-

... More
Dismantling Brick work tile, masonry or tile lining in Cement.

11.49

-

-

... More
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. (Providing and Fixing APM Outlet on Non Petrolling side).

2

-

-

... More
Any Others Item

-

-

-

... More
Extra bitumen painting at 0.69 kg per sqm on top of sleepers and side of lining for construction joints ,contraction joints and expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.

888.41

-

-

... More
Painting new letters and figures of black synthetic enamel paint to an even shade. (Supply and fixing Distance Marker).

2520

-

-

... More
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure. (Providing and Fixing APM Outlet on Non Petrolling side).

0.52

-

-

... More
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Petrolling side).

1

-

-

... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.

225.03

-

-

... More
Laying Plain Cement Concrete 1:3:6 (M-10) nominal mix in foundation with crshed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

12.43

-

-

... More
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure. (Providing and Fixing APM Outlet on Petrolling side).

0.57

-

-

... More
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. (Providing and Fixing APM Outlet on Petrolling side).

1.62

-

-

... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leads, total lead = 4.37 km including first 3.2 km pucca and last 1.17 km kacha. Disposal/Carriage from 0 to 450m.

15639.85

-

-

... More
Excavation of soil using Hydraulic excavator and Hydraulic Tractor trolley I/C cutting and loading in trolley Transporting to the embankment locations with all lift and leadstotal, lead = 4.37 km including first 3.2 km pucca and last 1.17 km kacha. Disposal/Carriage from 1Km to 2Km.

15639.85

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in foundation and plinth. (Supply and fixing Distance Marker).

0.14

-

-

... More
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete. (Supply and fixing Distance Marker).

0.5

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976. (0.32 ft= 9.9 cm (min wt 72 kg)).

2

-

-

... More
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e; Concrete R.C slab and cement masonary. with 'H' more than 0.50 m but upto 0.90 m. (Providing and Fixing APM Outlet on Petrolling side).

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.