Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date16 Dec 2022
Closing DateCancelled
Tender Amount₹ 45,00,000
Costs
EMD
₹ 90,000Document Cost
₹ 2,000Tender Fee
₹ 5,310
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WR_93808_5Bid Award Id
ViewTender No
E-tender Notice No.27/Abohar Canal Division /2022-Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling of Flexible pavements (Bituminous concrete) (By Mechanical means)
-
-
-
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads with disposal (with an avg. lead 1 to 10 Km.
-
-
-
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads with disposal (with an avg. lead 450 mtr. )
-
-
-
Earth work excavation in ordinary soil, exclusive of compensation of earth Earth work undressed with a combined lead upto 15 metres including breaking of clods. CSR 6.2 (b)
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil mechanical means.(Depth upto 3 m)
-
-
-
PCC 1:3:6 (M-10) nominal mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by viberation i/c curing for 14 days as per drawing and technical specification.
-
-
-
Cement concrete M -20 in sub structure including centring & shuttering but excluding steel reinforcement complete in all respects as per drawing and Technical Specifications as per drawing and technical specification. (Up to 5 m height)
-
-
-
Laying RCC M -30 using batching plant, transit mixer and conrete pump in sub stucture, complete as per drawing and technical specification (height upto 5 m)
-
-
-
Furnishing and placing RCC in M -30 in Deck slab including centring & shuttering but excluding steel reinforcement complete in all respects as per drawing and Technical Specifications.
-
-
-
Providing and laying 75 mm thick Wearing coat consisting of 50 mm thick bituminious concrete and 25 mm thick mastic asphalt including tack coat.
-
-
-
Providing and fixing drainage spout complete as per drawing and Technical specification.
-
-
-
Cold twisted deforned (Ribbed/Tor Steel Bar) Bars Fe-500 grade as per IS 1786-1985, for R.C.C. works, where not including in the complete rate of R.C.C including bending and placing in position complete.
-
-
-
Providing and laying filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall/return wall to the full height compacted to a firm condition complete as per drawing and Technical specification.
-
-
-
Providing weep holes in brick masonry/Reinforced concrete abutment, wing wall/return wall with 100 dia PVC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face complete as per Drawing and Technical Specifications.
-
-
-
Providing and applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ 1 Litre for 2 sqm.
-
-
-
Reinforced Cement Concrete M-30 in Approach Slab including centering shutering but excluding steel reinforcement complete as per Drawing and Technical Specification.
-
-
-
Providing and fixing tar paper bearing on abutment cap rubbed smooth
-
-
-
Providing and making of expansion joint filled with joint sealing compound bitumen filler.
-
-
-
providing and fixing 2mm thick corrugated copper plate in expension joint complete as per drawing and technical specifications.
-
-
-
Providing & fixing 25 mm thick compressible fiber board in expansion joint complete as per drawing and technical specifications.
-
-
-
Providing and fixing in position 20 mm thick pre-moulded joint filler in expansion joint for fixed ends of simply suportsd spans not exceeding 10 m to cater for a horizontal movement up to 20 mm, covered with sealant complete as per drawing and technical specifications.
-
-
-
Providing and fixing solar Cat eyes.
-
-
-
Providing, fitting and fixing mild steel sailing over crash barriers completepe as per drawing and technical specifications.
-
-
-
Providing and applying tack coat with bitumen emulsion using bitumen pressure distributor @ 0.25 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
-
-
-
Providing and laying dense bituminous macadam (50 mm) with 100-200 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregate of specified grading premixed with bituminous binder, tansported to site, laid over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clause 501.6 and 501.7 to achieve the desired density.
-
-
-
Providing and laying bituminous concrete with 100-200 TPH hot mix plans producing an average out put of 75 tonnes per hour using crushed aggregate of specificed grading premixed with bitumminous binder @ 5.4-5.6 % of mix and filter.
-
-
-
Plain cement concrete M-20 grade precast kerb 250 mm high with bottom width 165 mm and top width 115 mm fixed in position on earth base i/c carriage to site of work complete as per technical clause 408 of MORT&H specifications.
-
-
-
Providing and laying of hot applied thermoplastic compound 2.5 mm thick i/c reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be leave uniform and free from streaks and holes. (4'' thick)
-
-
-
Applying primer coat with cement primer and Painting two coats with synthetic Enamen paint in all shades on kerbs.
-
-
-
Providing and laying 50 mm thick factory made cement concrete Interlocking paver block of M-30 grade made by block making machine with strong viberatory compaction and of approved size and designe /shape in ordinary grey colour and pattern over and i/c 50 mm thick compacted bed of course sand, filling the joints with fine sand etc. all complete as per directions of Engineer-in-Charge for non traffic areas such as building premises, monument premises, land scaped public garden/parks, domestic drives, paths and patios, embankment slopes, sand stabilization area etc.
-
-
-
Hazard maker sign board 300 x 900 mm rectangular as per IRC 67 - 2001 with retro reflective high intensity microprismatic grade sheeting fixed over 2 mm thick aluminium sheet with 25 x 25 x 3 mm angle iron frame supported on a mild steel angle iron post 65 x 65 x 6 mm without cost of definition plate firmly fixed to ground in foundation cconcrete 1:2:4 of size 0.45 x 0.45 x 0.60 m for vertical post complete as per technical clause 801 MORT&H specifications.
-
-
-
Cautionary sign board 600 x 600 x 600 mm triangular as per IRC 67 - 2001 with retro reflective high intensity microprismatic grade sheeting fixed over 2 mm thick aluminium sheet with 25 x 25 x 3 mm angle iron frame supported on a mild steel angle iron post 65 x 65 x 6 mm without cost of definition plate firmly fixed to ground in foundation cconcrete 1:2:4 of size 0.45 x 0.45 x 0.60 m for vertical post complete as per technical clause 801 MORT&H specifications.
-
-
-
Mandatory sign board 600 mm circular as per IRC 67 - 2001 with retro reflective high intensity microprismatic grade sheeting fixed over 2 mm thick aluminium sheet with 25 x 25 x 3 mm angle iron frame supported on a mild steel angle iron post 65 x 65 x 6 mm without cost of definition plate firmly fixed to ground in foundation cconcrete 1:2:4 of size 0.45 x 0.45 x 0.60 m for vertical post complete as per technical clause 801 MORT&H specifications.
-
-
-
Informatory sign board 600 x 600 mm square as per IRC 67 - 2001 with retro reflective high intensity microprismatic grade sheeting fixed over 2 mm thick aluminium sheet with 25 x 25 x 3 mm angle iron frame supported on a mild steel angle iron post 65 x 65 x 6 mm without cost of definition plate firmly fixed to ground in foundation cconcrete 1:2:4 of size 0.45 x 0.45 x 0.60 m for vertical post complete as per technical clause 801 MORT&H specifications.
-
-
-
Laying 1st class burnt brick work laid in CSM 1:4 in foundation and plinth level i/c supply, carriage, loading and unloading of all required material from source to site of work i/c labour charges complete in all respects.
-
-
-
Laying C.C. M-15 under approach slab.
-
-
-
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead.
-
-
-
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications.
-
-
-
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth.
-
-
-
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.50 to 3.00 mtr depth.
-
-
-
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
-
-
-
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per PWD specification
-
-
-
Laying cement water slurry 1:3 with cement @ 2.25 kg/sqm as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
-
-
-
Providing and laying Cement concrete 75 mm thick or less without mechanical paver for irrigation channels, using cement concrete (M15) mixed in automatic computerized batching and mixing Plant and transported to the site in transit mixers with an avg. lead of 1 km including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge. (for side lining & bed)
-
-
-
Providing and laying cement concrete M-15 for coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications.
-
-
-
Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications.
-
-
-
Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications.
-
-
-
Filling of contraction Joints with sealing compound to be applied hot after applying primer coat including supply & carriage all material complete in all respect.
-
-
-
Applying Bitumen Primer coat on concrete surface and top of sleeper for construction joints, Expansion Joints & Contraction Joints including supply, carriage of material complete in all respect.
-
-
-
Laying LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
-
-
-
Dismantling cement concrete plain (M-15 mixed).
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements