Water Resources Department Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 57,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_WR_21700_1Tender No
05/22ATender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation(for Toe Wall,sleeper and coping )
1
-
-
... More
Extra for compaction of earth,including laying in 20 cm Layers,watering & rollining to specifications
1
-
-
... More
Dressing of E/work
1
-
-
... More
Dressing of Dowel in addition to payment for dressed earth work
1
-
-
... More
Earth work for lip cutting for lining of irrigation channel inclusive of all allowances, lead and dressing up to depth 0-1.5 m depth
1
-
-
... More
Earth work for lip cutting for lining of irrigation channel inclusive of all allowances, lead and dressing up to depth 1.5-3.0 m depth
1
-
-
... More
Earth work for lip cutting for lining of irrigation channel inclusive of all allowances, lead and dressing up to depth 3.0 m above depth
1
-
-
... More
Cement water slury 1:3, with cement @2.25 kg per sqm as on prepared side slope before laying concrete on side slopes including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
1
-
-
... More
Laying First class burnt,brick laid in cemnt sand mortar 1:3 in foundation & plinth for toe wall including supply carriage of material in all respect .including supply ,carriage,loading and unloading of all material from source to site of work,complete in all respect .
1
-
-
... More
Laying cement conc. 1:3:6 with stone ballast or shingle
1
-
-
... More
Dressing bed and prepration of sub grade for Lining
1
-
-
... More
Dressing side slopes and prepration of sub grade for Lining
1
-
-
... More
Providing and laying Cement Concrete (M15) 15 cm thick or less using batch mixing Plant and transit mixers and transported to site of work for lead upto 1 Km with continous agitated mixing as per design to entire specification and Engineer in Charge.(for Coping & Sleepers)
1
-
-
... More
Providing and laying Cement Concrete (M15) 15 cm thick or less using batch mixing Plant and transit mixers and transported to site of work for lead upto 1 Km with contnous agitated mixing as per design to entire specification and Engineer in Charge.(for Toe walls)
1
-
-
... More
Providing and laying Cement Concrete (M15) 15 cm thick or less using batch mixing Plant and transit mixers and transported to site of work for lead upto 1 Km with contnous agitated mixing as per design to entire specification and Engineer in Charge.(for Side Lining )
1
-
-
... More
Providing and laying Cement Concrete (M15) 15 cm thick or less using batch mixing Plant and transit mixers and transported to site of work for lead upto 1 Km with contnous agitated mixing as per design to entire specification and Engineer in Charge.(for Bed Lining )
1
-
-
... More
Extra allowance for form work in concrete Lining(For Bed)
1
-
-
... More
Extra allowance for form work in concrete Lining(For Side slopes)
1
-
-
... More
Extra allowance for scaffolding in concrete Lining For Side slopes only
1
-
-
... More
Filling of contraction and expansion joint with sealing compound to be applied hot after applying primer coat including supply and carriage all material complete in all respects
1
-
-
... More
150 wide PVC water stop seal for construction joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge
1
-
-
... More
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge
1
-
-
... More
Ordinary Jungle clearance of both banks of running canls and drainage with discharge above 9 cumecs
1
-
-
... More
Filling of sand in scoured pit in bed within avg lead 1 km
1
-
-
... More
Providing, Running and maintenance of pumping set 8 H.P./Generator set for dewatering arrangements complete in allrespects.
1
-
-
... More
Making bore and installation of pumping set for dewatering arrangements complete in all respects.
1
-
-
... More
Supply of EC bags filled with sand /earth ,sewing and Laying in postion within 30 mtr in Water
1
-
-
... More
Rehandlining of E/w with an avg lead 30 m for removing of ring Bandh
1
-
-
... More
Supply of Boulder Stone from quarry site to stack yard Size (90% 18.0 Kg. to 40 Kg.) & (10% upto 18.0 Kg) including carriage, loading, unloading & stacking complete as per satisfaction of engineer-in-charge.
1
-
-
... More
Filling Stone or Spall on level
1
-
-
... More
Recarriage of Boulder Stone,Spall from Stack yard to site of work with lead 0.5 Km. katcha
1
-
-
... More
Dismentalining of Concrete 1:2:4
1
-
-
... More
Dismentalining of Brick Lining
1
-
-
... More
Making temporary Sirki sarkanda godown 3mx3m size with walls 2.5 mtr height 1.5 brick thick burnt brick but including the cost of other materials
1
-
-
... More
Supply & Running of Genrator 33 KVA
1
-
-
... More
Providing Water arrangements
1
-
-
... More
Any Other Item
1
-
-
Evaluation Notes How It Works ?