Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Dec 2024
Closing Soon20 Dec 2024
Tender Amount₹ 1,70,46,000
Costs
EMD
₹ 3,41,000Document Cost
₹ 10,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_130819_2Tender No
NIT No 2039Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.
8008
-
-
... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth)
1262
-
-
... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (1.50 mtr - 3 mtr depth)
392
-
-
... More
Dressing of side slopes and preparation of subgrade for lining complete in all respect as per PWD specifications and engineer-in-charge.
18230
-
-
... More
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mt depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation.
316
-
-
... More
"Extra bitumen painting at 0.69 Kg. per Sqm (as per IS 3384-1985 )
1268
-
-
... More
"Supplying and Laying LDPE film of 150 microm over sleepers (for construction & expansion joints) I/C carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(M-73)
"
175
-
-
... More
Shuttering for faces of Concrete
948
-
-
... More
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.
11556
-
-
... More
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km
1511
-
-
... More
"Providing and filling Construction joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings complete in all respect
"
6338
-
-
... More
Dressing of earth work for new work or remodeling work Unit CSR 6.3 (i)
31025
-
-
... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge exceeding 1.5 Cum/s but upto 4.5 Cum/s including boundary road
2.76
-
-
... More
CHAPTER NO. 19 LINING Cement concrete lining laid manually for irrigation channels(for sleeper & coping), using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
316
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m
16408
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/ carraige additional beyond 450m upto 1 Km
16408
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((c))Disposal/carraige for lead upto 5.83Km
16408
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
5
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
5
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
5
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
14.2
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
39.75
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side "Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)"
49.15
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
1.3
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
2.4
-
-
... More
CHAPTER NO. 10 CONCRETE (10.20) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.
3
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
2
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
2
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
2
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
4.28
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
10.5
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side "Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)"
16.32
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
0.52
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
0.44
-
-
... More
CHAPTER NO. 10 CONCRETE (10.20) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.
0.5
-
-
... More
CHAPTER NO. 10 CONCRETE Sub Estimate : 1.3 - distance mark (10.12) cement concrete 1:3 :6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
0.43
-
-
... More
CHAPTER NO. 10 CONCRETE Sub Estimate : 1.3 - distance mark Laying(10.13) R.C.C. 1:2 :4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete (precast concrete )
0.09
-
-
... More
CHAPTER NO. 18 STEEL AND IRON WORK Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding
placing in position complete
0.3
-
-
... More
Any Other
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%