Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Dec 2024
Closing Date20 Dec 2024
Tender Amount₹ 1,41,82,000
Costs
EMD
₹ 2,84,000Document Cost
₹ 10,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_130819_4Bid Award Id
ViewTender No
NIT No 2039Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
"Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.. CSR 6.19 "
3692
-
-
... More
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.[ CSR 24.5 b (i) & (ii) ]
6593
-
-
... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth) (CSR 19.19 a)
1243
-
-
... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (1.50 mtr - 3 mtr depth) (CSR 19.19 b )
183
-
-
... More
Dressing of side slopes and preparation of subgrade for lining complete in all respect as per PWD specifications and engineer-in-charge. (CSR 19.2 b)
16093
-
-
... More
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mt depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation. ( csr 6.6)
276
-
-
... More
"Extra bitumen painting at 0.69 Kg. per Sqm (as per IS 3384-1985 ) ( csr 13.54) "
1056
-
-
... More
"Supplying and Laying LDPE film of 150 microm over sleepers (for construction & expansion joints) I/C carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(M-73)
"
145.69
-
-
... More
Shuttering for faces of Concrete(CSR 9.1)
882
-
-
... More
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.(CSR Item 19.12)
17414
-
-
... More
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km
1019
-
-
... More
"Providing and filling Construction joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings complete in all respect
"
5647
-
-
... More
Dressing of earth work for new work or remodeling work Unit CSR 6.3 (i)
32513
-
-
... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge exceeding 1.5 Cum/s but upto 4.5 Cum/s including boundary road[CSR 26.24 b]
2.72
-
-
... More
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km ( for sleeper and coping)
276
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
2
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
2
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
5.68
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side RCC M-20 in superstructure
1.2
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
15.9
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
0.52
-
-
... More
Sub Estimate : 1.1 - outlet on petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
0.96
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
3
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
3
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
6.42
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
15.75
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side RCC M-20 in superstructure
0.75
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
0.78
-
-
... More
Sub Estimate : 1.2 - outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
0.66
-
-
... More
Sub Estimate : 1.3 - distance mark Laying cement concrete 1:3 :6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
0.43
-
-
... More
Sub Estimate : 1.3 - distance mark Laying R.C.C. 1:2 :4 (M-15) excluding steel reinforcement but including centering and shuttering and vibrating the concrete (precast concrete )
0.09
-
-
... More
Sub Estimate : 1.3 - distance mark Bending binding and placing in position steel reinforcement
0.3
-
-
... More
Sub Estimate : 1.4 - boundary pillar Laying R.C.C. 1:2 :4 (M-15) batch mixed with stone ballast or shingle
1.4
-
-
... More
Sub Estimate : 1.4 - boundary pillar Bending binding and placing in position steel reinforcement 10 mm dia. Bars
1
-
-
... More
Any Other
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements