Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 7,00,000Document Cost
₹ 10,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_129818_1Tender No
56/22A/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Filling stone or spall:- (on Level) including supply of Spall from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes.
2421.41
-
-
Filling stone or spall:- (on Side Slopes) including supply of Spall from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes.
439.82
-
-
Excavation of soil using hydraulic excavator and Hyraulic Tractor Trolley i/c cutting and loading in tippers and transporting to the embankments location with all lifts and leads upto 7.5 Km
11829.34
-
-
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications
1526.19
-
-
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed
within lead of 30 metres.
1849.21
-
-
Dressing bed and preparation of subgrade for lining in mixed gravel and conglomerate reaches.
15892.19
-
-
Dressing side slopes and preparation of sub grade for lining.
2886.64
-
-
Weaving wire netting for wire crates including binding sides and partitions to make
crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh.
14161.34
-
-
Dismantling stone pitching or soling Stone pitching grouted with dry ballast and with natural silt and clay
6866.95
-
-
Site clearance Excavation in dumped stone or malba including stacking of unserviceable material separately and disposal of unserviceable material. Lead up to 50 m and lift up to 1.5 m, disposed material to be neatly dressed in all kinds of soils.
6866.95
-
-
Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer incharge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjecent ground to be carried away by flowing water and to prevent clogging of the system. Note:- The dewatering executed during delayed period of execution beyond the construction schedule shall not be paid when delay is attributable to the contractor.
40320
-
-
Making Dewatering Arrangment by pumping set 4"x4" (Tractor -24 HP driven)
1500
-
-
Grouting stone filling or pitching with bajri or shingle
17335.51
-
-
Brick lining 7.5cm thick in 1:3 cement sand mortar over 12.5 mm thick
base plaster 1:6 over dressed subgrade including laying, trenching and
jointing of low density polyethylene. (on side slopes)
58.37
-
-
Dismantling brick work tile, masonry or tile lining
4.45
-
-
12.50 mm thick Cement Plaster 1:3
50
-
-
Cement Concrete 1:2:4 with stone ballast or shingle complete in all respect.
20
-
-
Cement Pointing flush on stone wall 1:2
1000
-
-
Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including disposal of rubish to the dumping ground within 50 m lead (excluding the cost of scraping of plaster and replastering).
1000
-
-
Any Other Items
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%