Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date29 Oct 2024
Closing Soon19 Nov 2024
Tender Amount₹ 1,19,00,000 
Notes
Download

Costs

  • EMD

    ₹ 2,38,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compaction ((iii)) Extra for rolling to specifications.

2484.74

-

-

... More
Dressing of earth work: New work or remodeling work.

19047.75

-

-

... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing: 0 to 1.5 m depth

1597.47

-

-

... More
Dressing side slopes and preparation of sub grade for lining.

12910.93

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes

16265.84

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)

772.92

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)

176.81

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)

47.13

-

-

... More
Filling expansion joints with special impervious hot pour 12.5mm wide

41.9

-

-

... More
Filling Contraction joints with special impervious hot pour 12.5mm wide.

4794.27

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m (Lead =6.27km with 1st 1.30 km & last 0.23km pucca)

2216.74

-

-

... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- ((a)) Discharge upto 1.5 cum/s

4.27

-

-

... More
Extra bitumen painting at 0.69 Kg. per sqm

458.36

-

-

... More
Providing & Laying 250mm wide LDPE Film 150 micron over sleepers

158.49

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

853.48

-

-

... More
Proving and Fixing Distance: Cement concrete 1:3:6 with stone ballast or shingle: mixing by mechanical means using concrete mixer volumetric type

1.68

-

-

... More
Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type

0.67

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

0.47

-

-

... More
Sub Estimate for re-construction of Head Regulator of Khanna Minor: Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m

1523

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes

60.03

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)

2.98

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) for sleepers

0.23

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) for coping

0.63

-

-

... More
Filling expansion joints with special impervious hot pour 12.5mm wide.

2.2

-

-

... More
Dressing side slopes and preparation of sub grade for lining.

49.54

-

-

... More
Dismantling concrete ((b)) Cement concrete plain 1:4:8 or 1:5:10

9.33

-

-

... More
Dismantling of Brick Work, Tile, masonary or lining in cement.

16.77

-

-

... More
Dismantling of Reinforced cement concrete

14.43

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m

1194

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (A) PCC Grade M15 ((i)) Height upto 5m

19.4

-

-

... More
Cement concrete 1:4:8 ((a)) with stone ballast 20mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type

18.4

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (B) RCC Grade M25 (B.1) Using Concrete Mixer ((a)) For Solid slab super-structure- including centering and shuttering ((i)) Height up to 5m

124.11

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 30-For solid slab. (C.1) Using Concrete Mixer ((a)) For Solid slab super-structure-including centering and shuttering ((i)) Laying Reinforced cement concrete in sub structure (using cincrete mixer) as per drawing & technical specifications) Height up to 5m

20.97

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (E) RCC/PSC Grade M-40 (E.1) Using Concrete Mixer ((a)) For Solid slab super-structure- including centering and shuttering ((i)) Height up to 5m

8.44

-

-

... More
Painting on concrete surface: Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.

32.57

-

-

... More
Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications.

13.77

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

1.52

-

-

... More
Filling Contraction Joint with sealing compound including supply & carriage of all material complete in all respects.

6.59

-

-

... More
Extra bitumen painting at 0.69 Kg. per sqm

4.07

-

-

... More
Polythene films/ sheet of 100,125, 150, 200,250 micron

0.65

-

-

... More
LED Based Solar Light.

6

-

-

... More
Supply and installation of Single Faced Sluice Gate of Rectangular Shape having size of 675 mm x 525 mm . As per I.S.: 3042 (1965) Inclusive GST

1

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

112.37

-

-

... More
Providing and fixing outlets patrolling side: Earth work for outlet: Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H more than 0.5 m but upto 0.9 m

4

-

-

... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With H more than 0.5 m but upto 0.9 m

4

-

-

... More
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m

4

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

10.68

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.

2.56

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

37.52

-

-

... More
Centring and shuttering for slab of culverts for vent height up to 3.00 mtr

6.56

-

-

... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth

6.8

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

2.04

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 ((ii)) 0.25 ft= 7.6 cm (min wt 68 kg)

4

-

-

... More
Providing and fixing outlets non patrolling side: Earth work for outlet: Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H more than 0.5 m but upto 0.9 m

6

-

-

... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With H more than 0.5 m but upto 0.9 m

6

-

-

... More
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m

6

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

11.22

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.

1.5

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

44.88

-

-

... More
Centring and shuttering for slab of culverts for vent height up to 3.00 mtr

3.02

-

-

... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth

4.97

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

1.32

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 ((ii)) 0.25 ft= 6.1 cm (min wt 68 kg)

6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.