Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 1,52,000Document Cost
₹ 5,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_129799_1Tender No
53/22A/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Filling Contraction Joint with sealing compound
complete in all respect
548.61
-
-
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in
all respect.
37.3
-
-
Making dewatering arrangement by pumping set
4" * 4" (tractor driven)
300
-
-
Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer incharge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjecent ground to be carried away by flowing water and to prevent clogging of the system. Note:- The dewatering executed during delayed period of execution beyond the construction schedule shall not be paid when delay is attributable to the contractor.
7392
-
-
Providing and Filling stones or spalls into crates and hand packing including supply of boulder from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes.
365.05
-
-
Stone or Kankar block pitching including supply of Stones from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes. (Horizontal)
815.63
-
-
Stone or Kankar block pitching including supply of Stones from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes. (Side slope)
194.04
-
-
Filling stone or spall:- (on Level) including supply of Spall from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes.
407.82
-
-
Filling stone or spall:- (on Side Slopes) including supply of Spall from nearest approved quarry to site including loading, unloading and Re- handling of boulder from stackyard to site within 1 km complete in all respect and Stacking with in 15 mtr of unloading point into stack of specified sizes.
97.02
-
-
Excavation of soil using hydraulic excavator and tippers i/c cutting and loading in tippers and transporting to the embankments location with all lifts and leads 450 m
815.63
-
-
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed
within lead of 30 metres.
365.05
-
-
Dressing bed and preparation of subgrade for lining in mixed gravel and conglomerate reaches.
2676.58
-
-
Dressing side slopes and preparation of sub grade for lining.
636.76
-
-
Weaving wire netting for wire crates including binding sides and partitions to make
crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh.
2794.8
-
-
Dismantling stone pitching or soling Stone pitching grouted with dry ballast and with natural silt and clay
504.84
-
-
Site clearance Excavation in dumped stone or malba including stacking of unserviceable material separately and disposal of unserviceable material. Lead up to 50 m and lift up to 1.5 m, disposed material to be neatly dressed in all kinds of soils.
504.84
-
-
Grouting stone filling or pitching with bajri or shingle
2994.96
-
-
First class Brick work 1:4
20
-
-
12.50 mm thick Cement Plaster 1:3
200
-
-
Cement Concrete 1:2:4 with stone ballast or shingle complete in all respect.
10
-
-
Cement Pointing 1:2 of deep variety
500
-
-
Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering including disposal of rubish to the dumping ground within 50 m lead (excluding the cost of scraping of plaster and replastering).
500
-
-
Structural steel work in angles, tees, flats, riveted,
including cutting, fixing all gusset plates, bolts, nuts, rivets etc. with hoisting and erecting in position. For plates and trussed girders etc. for bridge of span more than 15 metres but upto 30 mts. Span including cost of all
machinery i.e hydra crane etc
29.14
-
-
Any Other Items
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%