Water Resources Department Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 9,09,000Document Cost
₹ 5,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WR_100873_1Bid Award Id
ViewTender No
BDD/BDC/2023-24/2Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation of Soil using Hydraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. Lead 5.98 Km with last 4.98 Km Katcha.
103251
-
-
... More
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications
69350
-
-
... More
Dressing of Earthwork for new work or remodeling work.
79377
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
6293
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.5 to 3 mtr depth
-
-
-
... More
Earthwork excavation in foundation and trenches
524.55
-
-
... More
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
28779.33
-
-
... More
Dag Belling single kassi stroke complete in all respect
9.07
-
-
... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes.
33102.71
-
-
... More
Cement concrete lining 75mm thick or less (for 60 mm)laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/Cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers (FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
1855.48
-
-
... More
Providing and laying cement concrete M-15 for coping mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
373.86
-
-
... More
Providing and laying cement concrete M-15 for Sleeper mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications
106.07
-
-
... More
Centeing & Shuttering for faces of concrete foudations and foundation beam & plinth bearm(Vertical or battering)
610.35
-
-
... More
Filling Contraction/ construction Joint with sealing compound complete in all respect
11141.87
-
-
... More
Filling expansion joint with Sealing Compound. complete in all respect
639.89
-
-
... More
Extra bitumen painting at 0.69 Kg. per Sqm.
2172.66
-
-
... More
Providing & laying 250 mm wide Polythene LDPE Film 150 micron over sleepers
358.18
-
-
... More
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With 'H' upto 0.5 m
15
-
-
... More
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With 'H' upto 0.5 m
15
-
-
... More
Earth work involved in constructing new O.F., A.P.M. or O.S.M. type outlets.
15
-
-
... More
Making temporary A.P.M. Block and fixing at site In case of new outlets where no dismantling and reconstructing of gullet walls is involved
15
-
-
... More
C. Concrete 1:4:8 with brick ballast 40 mm gauge by manual means
28.95
-
-
... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
72.45
-
-
... More
R.C.C 1:2:4 for slab
4.95
-
-
... More
Bending Binding and placing in position CTD bars (Fe 550)
3.6
-
-
... More
Extra labour for dressing of bricks for outlet with 'H' upto 0.50 mtr.
15
-
-
... More
Cement concrete 1:3:6 mixing by manual means with stone ballast or shingle
1.44
-
-
... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
0.3
-
-
... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
1.02
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements