Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date14 Nov 2024
Closing Date4 Dec 2024
Tender Amount₹ 2,89,24,099 
Notes
Download

Costs

  • EMD

    ₹ 5,78,482
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolly (katcha)

36149.28

-

-

... More
Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolly (pacca)

36149.28

-

-

... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolly (katcha)

36149.28

-

-

... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolly (pacca)

36149.28

-

-

... More
Extra for carriage of earth/soil per km beyond 10km lead with hydraulic tractor trolly (katcha)

36149.28

-

-

... More
Extra for carriage of earth/soil per km beyond 10km lead with hydraulic tractor trolly (pacca)

36149.28

-

-

... More
Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing & including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions

25490.32

-

-

... More
Dressing of Earthwork (New work or remodeling work.)

50494.87

-

-

... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth

6274.91

-

-

... More
Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.

322.06

-

-

... More
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.

24535

-

-

... More
Dag Belling single kassi stroke complete in all respect

5.88

-

-

... More
Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes

25607.78

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Side Slopes)

1284.43

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Coping)

246.56

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Sleepers)

75.5

-

-

... More
Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications. 1662.05 + 8.19 + 4.64 = 1674.88

1674.88

-

-

... More
Filling Contraction Joint with sealing compound complete in all respect

6976.56

-

-

... More
Filling expansion joints with special impervious hot pour 12.5 mm wide

122.44

-

-

... More
Extra bitumen painting at 0.69 per sqm (on sleeper) . Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.

1073

-

-

... More
Providing & laying 250 mm wide LDPE Film 150 micron over sleepers

156.07

-

-

... More
Dismantling brick work, tile masonry or tile lining (in cement mortar)

1783.28

-

-

... More
Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)

75.45

-

-

... More
Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)

28.48

-

-

... More
Dismantling of pre-stressed / RCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)

5.71

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with excavated surplus soil Depth 0-3 mtr

198.92

-

-

... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification

0.42

-

-

... More
Plain cement concrete M-15 Grade in sub-structure complete as per drawing and Technical Specifications Height upto 5m.

17.72

-

-

... More
Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.

21.69

-

-

... More
Plain/Reinforced cement concrete grade M25 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.

81.65

-

-

... More
Plain/Reinforced cement concrete RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump in sub-structure complete as per drawing and Technical Specifications Height upto 5m

3.91

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.

23.88

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub- structure complete as per drawing and Technical Specifications.

6.82

-

-

... More
Preparing watering and ramming surface for laying concrete, for irrigation channels horizontally.

118.12

-

-

... More
Providing & fixing 25 mm thick and 250 mm wide compressible fiber board in expansion joint complete as per drawing and technical clause 2605 of MORT&H specifications.

9.24

-

-

... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.

68.46

-

-

... More
Providing, Laying , fixing & jointing of P.V.C. Pipes as per ISI-4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specifications. 110mm o/d PVC pipe of 2.5 Kgf. /sqcm

9.14

-

-

... More
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)

2

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

11.21

-

-

... More
Supplying & laying dry brick ballast

0.11

-

-

... More
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling, consolidation and dressing )

10

-

-

... More
Adjusting new APM Block in correct "y" & fixing in position (in case of new outlet where no dismentling and reconstructing of gollet wall is involved

9

-

-

... More
Laying cement concrete 1:4:8 with gauge 40mm mixing by mechanical means using concrete mixer volumetric type (27.25+ 0.57 = 27.82)

27.82

-

-

... More
First class burnt brick work laid in cement sand mortar 1:4 in foundations & plinth

72.57

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.

2.86

-

-

... More
Cold twisted detormed (Ribbed/ ToR Steel Bar) Bars (Fe 500 grade as per IS 1786-2005) , for R.C.C works, where not including in the complete rate of RCC including bending and biding placing in position complete

1.03

-

-

... More
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.

4.67

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.20 ft = 6.1 cm (min wt 65 kg))

1

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.25 ft= 7.6 cm (min wt 68 kg))

1

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.32 ft= 9.9 cm (min wt 72 kg))

3

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.40 ft= 12.2 cm (min wt 76 kg))

2

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 and Tippers with Disposal up to 450 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 450m

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.