Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date20 Nov 2024
Closing Date11 Dec 2024
Tender Amount₹ 4,66,00,000 
Notes
Download

Costs

  • EMD

    ₹ 9,32,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EARTHWORK: Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Disposal/carraige for every additional Km upto 10Km (lead 8.60kms)

18499.14

-

-

... More
EARTH WORK: Dressing of earth work New work or remodeling work.

38618.66

-

-

... More
EARTH WORK: Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.

663.32

-

-

... More
LINING: Excavating conglomerate for drains andbed sleepers under the lining.

238.1

-

-

... More
LINING: Filling expansion joints with special impervious hot pour 12.5mm wide

191.9

-

-

... More
LINING: Filling Contraction/Construction Joint with sealing compound complete in all respect

8966.82

-

-

... More
LINING: Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing: 0 to 1.5 m depth

1780.83

-

-

... More
LINING: Dressing side slopes and preparation of sub grade for lining.

42997.13

-

-

... More
LINING: Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes

53197.37

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)

245.4

-

-

... More
Cement concrete 1:4:8 ((b)) With stone aggregate 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type

16.74

-

-

... More
Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

0.62

-

-

... More
Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

0.13

-

-

... More
Polythene films/ sheet of 100,125, 150, 200,250 micron

282.16

-

-

... More
Dismantling brick work tile, masonry or tile lining in cement.

397.77

-

-

... More
HOISTING, ROOFING AND WATER PROOFING: Extra bitumen painting at 0.69 Kg. per sqm

4050.23

-

-

... More
Shuttering for faces of concrete foundations and foundation beam and plinth beam ( vertical or battering)

2404.3

-

-

... More
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead.

13607.82

-

-

... More
MATERIALS: Providing and laying 200 mm wide LDPE film 150 micron over sleepers

332.1

-

-

... More
Dag Belling Single Kassi Stroke complete in all respect.

10.57

-

-

... More
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications

29271.18

-

-

... More
Estimate for reconstruction of Falls: Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications: RCC Grade M20: Height upto 5m: With Batching Plant Transit Mixer and Concrete Pump

6.83

-

-

... More
Dismantling brick work tile, masonry or tile lining in cement.

0.6

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (B) Mechanical Means (a) Depth upto 3 m

112.75

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump

21.21

-

-

... More
Compaction: Extra for rolling to specifications

74.49

-

-

... More
Supplying & laying dry brick ballast

0.44

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (B) Mechanical Means (a) Depth upto 3 m

68.68

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications: RCC Grade M25 Height upto 5m ((ii)) With Batching Plant, Transit Mixer and Concrete Pump

13.65

-

-

... More
Compaction ((iii)) Extra for rolling to specifications.

43.6

-

-

... More
Supplying & laying dry brick ballast.

0.22

-

-

... More
Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

5.56

-

-

... More
Preparing watering and ramming surface for laying concrete (a) Head work (i) Horizontal

28.1

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications.

1.17

-

-

... More
CONSRUCTION OF TAIL CLUSTER: Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.(CSR item no 6.6)

8.86

-

-

... More
Cement concrete 1:4:8 ((b)) With stone aggregate 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type

3.86

-

-

... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation )and plinth (CSR item No. 11.9)

8.54

-

-

... More
10 mm thick cement plaster 1:3

33

-

-

... More
Proving and Fixing Distance: Cement concrete 1:3:6 with stone ballast or shingle: mixing by mechanical means using concrete mixer volumetric type

1.92

-

-

... More
Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type

0.39

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

1.36

-

-

... More
Painting distance marks with synthetic enamel paint ((b)) Two coat work ((ii)) Distributaries

40

-

-

... More
Providing and fixing outlets patrolling side: Earth work for outlet: Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling, consolidation and dressing ) With H more than 0.5 m but upto 0.9 m

11

-

-

... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With H more than 0.5 m but upto 0.9 m

11

-

-

... More
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m

11

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

30.14

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.

7.04

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

104.94

-

-

... More
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc.

18.04

-

-

... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth

78.1

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

5.61

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 ((ii)) 0.25 ft= 7.6 cm (min wt 68 kg)

11

-

-

... More
Providing and fixing outlets non patrolling side: Earth work for outlet: Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H more than 0.5 m but upto 0.9 m

12

-

-

... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. concrete R.C. Slab and cement masonry. With H more than 0.5 m but upto 0.9 m

12

-

-

... More
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m

12

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

23.16

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.

3

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

91.68

-

-

... More
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc.

6

-

-

... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth

63.72

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

2.64

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 ((ii)) 0.25 ft= 6.1 cm (min wt 68 kg)

12

-

-

... More
Construction of Head Regulator: Dismantling brick work tile, masonry or tile lining in cement.

13.8

-

-

... More
Dismantling concrete ((b)) Cement concrete plain 1:4:8 or 1:5:10

33.95

-

-

... More
Dismantling concrete: Reinforced cement concrete

2.23

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (B) Mechanical Means (a) Depth upto 3 m

648.89

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankmentlocationswithall lifts and leads ((a)) Disposal/ carraigefrom0 upto 450m

509.76

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (E) RCC Grade M20 ((a)) Height upto 5m ((ii)) With Batching Plant Transit Mixer and Concrete Pump

19.91

-

-

... More
Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications for RCC M-25 grade, Using Batching Plant, Transit Mixer and Concrete Pump

190.14

-

-

... More
Supplying & laying dry brick ballast.

1.14

-

-

... More
Compaction ((iii)) Extra for rolling to specifications.

386.91

-

-

... More
Re-handling of Earthwork with lead 30 meters

519.11

-

-

... More
Applying priming coat with metal primer on new steel or iron work including preparation of surface.

70.13

-

-

... More
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.

70.13

-

-

... More
Supply of multipurpose synthetic Hetiv Grease.

10

-

-

... More
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position a) R S Joists

295.24

-

-

... More
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position b) Flats

2270.45

-

-

... More
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position c) Tees angles & channels

847.05

-

-

... More
Supply of Skin plate

246.24

-

-

... More
Providing and fixing of Galvanized nuts & bolts of all sizes and length required

69.21

-

-

... More
Providing and fixing of stainless steel nuts & bolts of all sizes and length required

5.88

-

-

... More
Providing & fixing in position of flat/ wedge seal including preparation of surface complete I all respects and to entire satisfaction of Engineer in charge. (ii)75 mm Ø x 12 mm Th.

1.63

-

-

... More
Providing of hollow bulb seal and fixing in position including preparation of surface complete in all respect and to entire satisfaction of Engineer in charge 100/44 (44 dia, 100*4)

2.86

-

-

... More
Commissioning and testing of Gates at site complete in all repects and to entire satisfaction of engineer-in-charge

3.92

-

-

... More
MS Spindle with double start or triple start threading 11' height 1/3/4/"dia complete (i) upto 1.5 ton capacity

2

-

-

... More
Supply and fixing of spindle cover

100

-

-

... More
Hiring charges of machinery crane 35 ton

40

-

-

... More
Fillet welding with high strength steel rods complete in all repects and to entire satisfaction of engineer-in-charge (ii) 8 mm wide

31206

-

-

... More
Drilling/ boring hole including complete in all respects and to entire satisfaction of Engineer-in-charge (ii)10-20 mm Ø

13156

-

-

... More
LED based SPV Street lighting system: 12 Watt 75 SPV module 12.8V-30Ah, lithium ferro phosphate battery (2000 cycles), 6 meter hot dipped GI pole, 76.1 mm OD, 3.6 mm thick & Zinc coated.

2

-

-

... More
Supply of multi grade mobile oil

10

-

-

... More
Removing, providing and fixing SS Flat, complete in all respect

62.1

-

-

... More
Providing and laying, jointing, fixing, testing ISI marked G.I. Pipe (as per IS 1239) B-Class, including cost of specials such as tees, bends, sockets elbow etc., cutting, threading and testing in trenches in the ground complete. 50 NB

29

-

-

... More
CI housing cover with worm and worm wheel assembly, shaft, handle GM bust with triple start threading inside for spindle complete including labor charges

2

-

-

... More
Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

38.77

-

-

... More
Cement concrete 1:4:8 (a) with brick balast 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type

13.17

-

-

... More
Preparing watering and ramming surface for laying concrete (a) Head work (i) Horizontal

243

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications.

13.37

-

-

... More
Head Regulator : Supply and installation of Single Faced Sluice Gate of Rectangular Shape having size of 675 mm x 525 mm . As per I.S.: 3042 (1965) (as per Quotations)

1

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification (B) RCC Grade M25 (B.1) Using Concrete Mixer ((a)) For Solid slab super-structure- including centering and shuttering ((ii)) Height 5m to 10m

0.2

-

-

... More
Providing and filling joint sealing compoundas per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth

13.37

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications.

0.04

-

-

... More
Filling stones or spalls into crates and hand packing

2.4

-

-

... More
Weaving wire netting for wire crates includingbindingsides andpartitions tomake crate of15cmx15cmor25cmx 7.5 cm mesh.

14.31

-

-

... More
Providing, fitting and fixing mildsteel railing complete as per drawing and Technical Specification

4.88

-

-

... More
Repairing of Gates by cutting and strenghening charges i/c allignment of gates complete in all respects and to entire satisafaction of engineer incharge

2896.61

-

-

... More
Supply of GI Pipe hollow/pipe of any size

77.2

-

-

... More
Providing Chequered plate 8mm

235.4

-

-

... More
Removing, Providing & fixing S.S. Flats, Complete in all respects.

673.54

-

-

... More
Supply of spindal for hoist Mechanism i/c threadingand machining complete in all respects to entire satisfaction of engineer incharge.

39.25

-

-

... More
Cihousing cover with worm& worm assembly, shaft, handle, Gunmetal bush with triple start threading inside for spindle complete including labour charges.

1

-

-

... More
Provingand fixing7watt LED 40watt solar panel 12V-40Ah T-yel battery with 7m pole fixed with 1:2:4 concrete foundation of size 1.2x0.6x0.75 complete in all respects and to entire satisfaction of engineer-in-charge

1

-

-

... More
Filling cement bags with sand, sewing and laying in position within 30 meters in water including cost of E.C bags and strings.

1600

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.