Water Resources Department Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date9 Jan 2025
Closing Date15 Jan 2025
Tender Amount₹ 1,72,72,161
Costs
EMD
₹ 3,45,000Document Cost
₹ 10,000Tender Fee
₹ 5,900
Summary
Construction Of Head Regulator Of Arniwala Disty Off-taking 492100 Of Abohar Branch
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_129934_19Bid Award Id
ViewTender No
E-Tendering Notice No.17/Abohar Canal Ground Water Division /2024-25 Dated 14/11/2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling Cement concrete plain 1:3:6 mix.
400
-
-
... More
Dismantling brick work, tile masonry or tile lining (in cement mortar).
1100
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate
40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
181.63
-
-
... More
Laying Reinforced cement concrete (M-20) with using batching plant, transit mixer and concrete pump in Sub structure, complete as per drawing and Technical specifications. (Height upto 5 m)
48.25
-
-
... More
Providing & Laying Plain/Reinforced cement concrete M-25 mixed in Batching & Mixing Plant and transported to the site, complete in all respects. (Height upto 5.0 m)
394.07
-
-
... More
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply and carriage all material complete in all respect.
252
-
-
... More
Filling shingle in Barrier around PCC blocks of size 600 x 600 x 300 mm (Qty of Blocks).
2.59
-
-
... More
Filling shingle in Barrier around PCC blocks of size 600 x 600 x 300 mm (Qty of shingles).
6.25
-
-
... More
Graded Filter
1
-
-
... More
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position.
654.45
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specifications.
152.54
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and Technical Specifications.
40.59
-
-
... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
927.18
-
-
... More
Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer-in-charge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjacent ground to be carried away by flowing water and to prevent clogging of the system. (Making Bore & installation of pumping set for dewatering arrangement complete in all respect).
1170
-
-
... More
Making dewatering arrangements inclusive of running, operation and maintenance of equipment to provide dry condition at working place for lining, longitudinal /transverse drain etc & provision of digging & filling of drains for disposal of water as per the instructions of the Engineer-in-charge. The rate shall be inclusive of filter material, if required, to be provided to prevent fine particles in the adjacent ground to be carried away by flowing water and to prevent clogging of the system. (Providing running & maintenance of pumping set 8 H.P/Generator set for dewatering arrangement complete in all respect).
61600
-
-
... More
Providing Tractor 24 H.P. for running 4” x 4” pumping set for open dewatering.
880
-
-
... More
Sub Estimate of Lining of Abohar Branch
1
-
-
... More
Excavation of soil using Excavator and hydraulic tractor trolly i/c cutting and loading in trolly and transporting to the embankment all locations including all lifts and leads, excluding royalty.
1
-
-
... More
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications.
342.32
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth.
50.12
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 1.50 to 3.0 mtr depth.
50.12
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 3.0 to 4.5 mtr depth. (As per Earthwork statement)
4.69
-
-
... More
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
2.11
-
-
... More
115 mm thick brick on edge lining in herring bone bond/zig-zag or other specified pattern in 1:3 cement sand mortar over 10mm thick cement plaster 1:3 over 12.50 mm thick cement plaster in 1:5 on sub grade.
1326.31
-
-
... More
Laying brick on edge coping 550mm wide and 115mm thick in cement
sand mortar 1:3
73.15
-
-
... More
Extra allowance for providing templates in curved portions of lining.
65.1
-
-
... More
Extra allowance for scaffolding in lining for side slopes only.
276.26
-
-
... More
Sub Estimate for Gates & Gearing System at Head Regulator
1
-
-
... More
Providing & fixing in position of flat/wedge seal including preparation of surface complete in all respects and to entire satisfaction of Engineer in charge. (75 mm dia x 10 mm th.)
9.06
-
-
... More
Providing of hollow bulb seal & fixing in position including preparation of surface complete in all respects and to entire satisfaction of Engineer in charge. (100/44 x 10mm)
11.52
-
-
... More
Supply, Providing and fixing of MS Bolts & Nuts (for seals of all types) with washer of all sizes and length required as per sample / drawing / direction of Engineer-In charge complete in all respects.
28.4
-
-
... More
Supply, Providing and fixing of CSK Screw (for seals of all types) with washer of all sizes and length required as per sample / drawing / direction of Engineer-In charge complete in all respects.
120
-
-
... More
CI Housing Cover with worm and worm wheel assembly, shaft, handle, gun metal bush with triple start threading inside for spindle including labour charge complete in all respects 1.5 Ton capacity
6
-
-
... More
Supply of spindle for hoist machanism including threading and machinning complete in all respects and to entire satisfaction of Engineer in charge 55mm dia
503.3
-
-
... More
Supply and Fixing of spindle cover.
466.04
-
-
... More
Fixing and Holding the gate with the help of 35 tonne capacity crane.
60
-
-
... More
Commisioning & testing of Gates at site complete in all respects and to entire satisfaction of Engineer In charge.
18.41
-
-
... More
Providing & Fixing Clamp Plate complete in all respects.
134.6
-
-
... More
Supply and fixing of Common Shaft duly machined at site complete in all respects and to entire satisfaction of engineer in charge
6.9
-
-
... More
Fixing of coupling for common shaft with supply of Spindle shaft coupling rods and cover complete in all respect and to entire satisfaction of Engineer In charge.
6
-
-
... More
Providing Gate wheel assembly complete in all respects to entire satisfaction of Engineer-in-charge (200mm dia.).
12
-
-
... More
Assembling and fixing in position Gate Wheel Assembly complete in all respects and to entire satisfaction of Engineer-in-charge.
103.16
-
-
... More
Providing & Fixing of Wheel Pin in position complete in all respects and to entire satisfaction of Engineer-in - charge. (upto 75mm/above 75mm)
12
-
-
... More
Providing Spherical Roller Bearing SKF No. 22212-C
12
-
-
... More
Fixing in position of Bearing complete in all respects and to entire satisfaction of Engineer-in - charge.
12
-
-
... More
Providing and fixing Grease Nipple
12
-
-
... More
Painting of gate leaf with synthetic enamel paint and two coats with Anti corrosive Bitumastic paint to give an even shade with special quality paint.
188.56
-
-
... More
Applying priming coat with metal primer on new steel or iron work including preparation of surface
209.6
-
-
... More
Providing and Fixing Plates
4956.89
-
-
... More
Providing and Fixing Chequered Plate
1080.38
-
-
... More
Providing and Fixing ISMB 200 x 100 mm
443.94
-
-
... More
Providing and Fixing ISMC 200 x 75 mm
920.66
-
-
... More
Providing and Fixing of ISA 65 x 65 x 6mm
1101.48
-
-
... More
Providing and Fixing of MS Square Bar 25 x 25 mm
41
-
-
... More
Providing and Fixing Stainless Steel Flat
226.94
-
-
... More
Providing and Fixing ISMB 250 x 125 mm
1475.48
-
-
... More
Providing and Fixing of Anchor
189.65
-
-
... More
Threading of Pins complete in all respects and to entire satisfaction of Engineer-in-Charge (Upto 75mm)
36
-
-
... More
Fillet welding with high strength steel rods complete in all respects (6mm)
138118
-
-
... More
Drilling/Boring hole including rimming complete in all respects and to entire satisfaction of engineer in charge
14144
-
-
... More
Providing and Fixing SHS
500.12
-
-
... More
Providing and Fixing GI Pipe 40 N.B.
277.83
-
-
... More
Supply of multi purpose Synthetic hetiv grease
60
-
-
... More
Supply of Diesel
30
-
-
... More
Supply of Mobil Oil
30
-
-
... More
Providing and Fixing ISMC 150 x 75 mm
360.14
-
-
... More
Providing and Fixing ISA 100 X 100 x 10 mm
17.88
-
-
... More
Machining of Anchor Bolt to give shape complete in all respects and to entire satisfaction of Engineer-in-Charge
189.65
-
-
... More
Providing & Fixing of Pin in position complete in all respects and to entire satisfaction of Engineer-in - charge. (upto 75mm/above 75mm)
6
-
-
... More
Providing & Fixing Oil Seal
24
-
-
... More
Providing & Fixing Oil Ring Cord
24
-
-
... More
Dismantling of Mechanical structure (lumsum).
1
-
-
... More
EARTH WORK (6.19) Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
239.62
-
-
... More
Any other item
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements