Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 1,62,320Document Cost
₹ 2,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_126677_20Tender No
03 of 2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earthwork Filling in 0.152 mtr. Layers in foundation, including ramming, watering and consolidation under bed. CSR Item 6.8 (b-i)
1
-
-
Re-handling of earthwork recently executed CSR Item 6.2 (a)-note II
1
-
-
Dag belling single kassi stroke minimum 7.5 cm depth. CSR Item 6.18 (a)
1
-
-
Dressing of Bed and Preparation of Sub-grade for Lining CSR Item 19.1
1
-
-
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i)
1
-
-
10 mm thick Cement Plaster 1:4 on Side Walls CSR Item 15.6
1
-
-
10 mm thick Cement Plaster 1:4 on Floors CSR Item 15.38
1
-
-
Supplying of RCC Shutter with One Extra Frame for Nakka and Branch Offtakes
1
-
-
Fixing of Shutter and Frames for Nakka and Branch Offtakes
1
-
-
Supplying & Laying Dry Brick Bats
1
-
-
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. All classes of soil except rocky (a) Earth work upto 1.5 m. Depth
1
-
-
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. All classes of soil except rocky (b) Exceeding 1.5 m depth but not exceeding 2.25 m depth
1
-
-
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. All classes of soil except rocky (C) Exceeding 2.25 m depth but not exceeding 3 m depth
1
-
-
Earth work evacuation in foundation wheren pick jumper is not involved & not exceeding 2 mtr. Depth & subsequent filling around masonary in 15 cm layers with compaction including disposal of surplus soil.
1
-
-
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls CSR Item 11.3 (i)
1
-
-
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
1
-
-
Cement conc.1:4:8 with brick ballast
1
-
-
Centering &shuttering for Concrete faces as per item (9.1) of CSR
1
-
-
10 mm thick Cement Plaster 1:4 on Floors CSR Item 15.38
1
-
-
10 mm thick Cement Plaster 1:4 on Side Walls CSR Item 15.6
1
-
-
RCC work hand mixed 1:2:4 for slab including Steel reinforcement up to 80 kg per cum
1
-
-
Providing & fixing of Jungla & Man hole complete as per CSR item
No, (18.4)
1
-
-
Providing & placing of Steel foot steps complete
1
-
-
Providing,Lowering,jointing & Cutting of RCC pipes 150 mm dia for vent pipe
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 250 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 300 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 350 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 400 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 450 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 500 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 600 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 700 mm dia into trenches & laying same to correct alignment
1
-
-
Providing,lowering,jointing & cutting of RCC pipes 800 mm dia into trenches & laying same to correct alignment
1
-
-
Providing & jointing Alfa valve 250 mm dia complete
1
-
-
Providing & jointing Alfa valve 300 mm dia complete
1
-
-
Providing & jointing Alfa valve 350 mm dia complete
1
-
-
Providing & jointing Alfa valve 400 mm dia complete
1
-
-
Providing & jointing Alfa valve 450 mm dia complete
1
-
-
Providing & jointing Alfa valve 500 mm dia complete
1
-
-
Providing & jointing Alfa valve 600 mm dia complete
1
-
-
Providing & jointing Alfa valve 700 mm dia complete
1
-
-
Providing & jointing Alfa valve 800 mm dia complete
1
-
-
Providing and fixing alfa valve 250 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 300 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 350 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 400 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 450 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 500 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 600 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 700 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Providing and fixing alfa valve 800 mm dia with lifting arrangement to open/shut the pipeline
1
-
-
Dismantling Brick Work in Cement CSR Item 8.5 (b)
1
-
-
Any Other Item.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%