Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Construction Material
Eprocure
Opening Date5 Aug 2024
Closing Date20 Aug 2024
Tender Amount₹ 79,83,648 
Notes
Download

Costs

  • EMD

    ₹ 1,59,673
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mtr depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation. (For Sleepers) (CSR item no. 6.6)

209.36

-

-

... More
Excavation in soil (any type) using Hydraulic Excavator CK 90 Excavation with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30m. (CSR item no. 6.19)

2091.65

-

-

... More
Extra for Compaction of earth including laying earth in 20cm layers, watering and rolling to specifications. CSR ITEM 24.5(i+ii+iii)

1996.49

-

-

... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth) CSR ITEM 19.19 (a)

1319.63

-

-

... More
from depth 1.5mtr to 3mtr CSR ITEM 19.19(b)

66.22

-

-

... More
Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 19.2)

11698.92

-

-

... More
Shuttering for faces of concrete foundations and foundation beam and plinth beam ( vertical or battering )

231.64

-

-

... More
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 19.12)

12885

-

-

... More
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic to the site in transit computerized transported mixers with an average lead of 1 Km (FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) Without mechanical concrete paver (CSR item no. 19.40)

747.92

-

-

... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) for coping & sleeper. (CSR item no. 19.40)

209.36

-

-

... More
Extra bitumen painting at 0.69 kg per sqm. Priming coat as per IS 3384-1985 for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(CSR item 13.54)

737.82

-

-

... More
Laying LDPE film of 150 microm over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge. (CSR item no. 3/M-73)

101.82

-

-

... More
Filling Construction/contraction joints with special impervious hot pour

4207.57

-

-

... More
Filling expansion joints with special impervious hot pour 12.5 mm wide. (CSR item no. 19.16)

5.36

-

-

... More
Dressing of earthwork for new work or remodeling work Unit CSR 6.3 (i)

8573.28

-

-

... More
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With 'H' more than 0.5 m. but upto 0.9m CSR ITEM NO. 20.01 B (ii)

3

-

-

... More
Earth work involved in dismantling gullet walls of outlets for adjusting 'Y' of A.P.M. or 'B' of open flume outlets:- With 'H' more than 0.5 m. but upto 0.9 m CSR ITEM NO. 20.01 c (ii)

3

-

-

... More
Extra labour for dressing of bricks on Open Flume and A.P.M type Outlets With 'H' more than 0.5 m. but upto 0.9 m CSR ITEM NO. 20.10 (ii)

3

-

-

... More
Adjusting A.P.M. to the correct 'Y' and fixing in position:- Extra over item No. 20.4 In case of old outlets where dismantling and reconstructing of gullet walls is involved including change in width of gullet i.e. 'B' of the outlet upto 30m.m. CSR ITEM NO. 20.04 C With 'H' more than 0.5 m. but upto 0.9 m CSR ITEM NO. 20.03 c (ii)

3

-

-

... More
Cement Conc 1:3:6 mechanically mixed with stone ballast or shingle using concrete mixer volumetric type

8.08

-

-

... More
1st Class burnt Brick work laid in csm 1:4 in foundation & Plinth

22.04

-

-

... More
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. CSR item 18.18

1.4

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixture as per IS 1791 and vibrator by needele vibrator but excluding steel reinforcement and centring-shuttering complete in all respect. CSR item 10.15

1.74

-

-

... More
Centering shuttering For slab of culverts for vent height up to 3.00 mtr. For slab

0.78

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976

-

-

-

... More
0.20 ft = 6.1cm (min wt 65 kg) CSR ITEM NO. 20.15 (i)

1

-

-

... More
0.32 ft = 9.9cm (min wt 72 kg) CSR ITEM NO. 20.15 (iii)

1

-

-

... More
0.4 ft = 12.2 cm (min wt 76 kg) CSR ITEM NO. 20.15 (iv)

1

-

-

... More
Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type (10.13 (a)(ii))

1.33

-

-

... More
(18.18) Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

1.16

-

-

... More
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type (10.12 (a)(ii))

0.38

-

-

... More
(19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads

-

-

-

... More
((a)) Disposal/carraige from 0 upto 450m

500

-

-

... More
((b)) Disposal/ carraige additional beyond 450m upto 1Km

500

-

-

... More
((c)) Disposal/carraige for total lead upto 4.07Km

500

-

-

... More
Any Other Item

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.