Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 2,51,380Document Cost
₹ 5,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WR_92592_3Bid Award Id
ViewTender No
13/2022-23 dated 18-11-2022Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dressing of earth work (i) New work or remodeling work.
Unit
12704.65
-
-
... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
16392.5
-
-
... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed
within lead of 30 metres.
254.41
-
-
... More
Dressing side slopes and preparation of sub grade for lining.
17768.8
-
-
... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
20818.67
-
-
... More
Filling expansion joints with special impervious hot pour 12.5mm wide.
30.69
-
-
... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :-
-
-
-
... More
0 to 1.5m depth
5063.79
-
-
... More
depth exceeding 1.5 ms but upto 3.0 ms.
-
-
-
... More
Cement concrete lining 60mm. Thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic compterized Bathing and Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km ( FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
1308.44
-
-
... More
Compaction
-
-
-
... More
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
18070.2
-
-
... More
Compaction Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
18070.2
-
-
... More
Extra for rolling to specifications.
18070.2
-
-
... More
Dismantling brick work, tile masonry or tile lining(In cement)
1573.19
-
-
... More
Filling contraction joint with sealing compound complete in all respects.
5697.76
-
-
... More
Shuttering for faces of concrete lining on side slopes and bed complete in all respect.
346.39
-
-
... More
Dag belling single kassi stroke complete in all respect
4.64
-
-
... More
Applying Bitumen Primer coat on sides of lining and top of sleeper for construction joint, expansion joint & contraction joint. complete in all respect
816.01
-
-
... More
Providing and laying 250mm wide LDPE film 150 micron over sleepers.
112.61
-
-
... More
Earth work for outlet:-((b)) Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing )
-
-
-
... More
With H upto 0.5 m
7
-
-
... More
With H more than 0.5 m. but upto 0.9 m
1
-
-
... More
Earth work involved in dismantling gullet walls of outlets for adjusting 'Y' of A.P.M. or 'B' of open flume outlets:-
-
-
-
... More
With H upto 0.5 m
7
-
-
... More
With H more than 0.5 m. but upto 0.9 m
1
-
-
... More
Adjusting A.P.M to the correct Y and fixing in position:- ((c )) Extra over item No. 20.4 In case of old outlets where dismantling and reconstructing of gullet walls is involved including change in width of gullet i.e. 'B' of the outlet upto 30 m.m.
-
-
-
... More
With 'H' upto 0.5 m
7
-
-
... More
with H more than 0.5 m but upto 0.9 m
1
-
-
... More
Extra labour for dressing bricks On O.F. And A.P.M. type outlets
-
-
-
... More
With H upto 0.5 m
7
-
-
... More
With H more than 0.5 m. but upto 0.9 m
1
-
-
... More
Centring and shuttering for slab of culverts for vent height up to 3.00 mtr
0.46
-
-
... More
Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type
18.04
-
-
... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
3.53
-
-
... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth
38.24
-
-
... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
3.27
-
-
... More
Supply of APM block @ 1500
8
-
-
... More
dressing of dowel
-
-
-
... More
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (Plains)
-
-
-
... More
Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolley. (Katcha)
-
-
-
... More
Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolley. (pacca)
-
-
-
... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolley. (Katcha)
-
-
-
... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolley. (pacca)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements