Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date6 Mar 2024
Closing Date20 Mar 2024
Tender Amount₹ 51,58,351 
Notes
Download

Costs

  • EMD

    ₹ 1,03,167
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Disposal/carraige from 0 upto 450m

821.86

-

-

... More
Disposal/carraige additional beyond 450m upto 530m

821.86

-

-

... More
Rehandling of E/work (CSR chapter 6 note no.2 )

238.56

-

-

... More
PCC M-15 cement concrete in sub-structure complete as per drawing and Technical specifications (CSR item No. 21.32 (a))

37.91

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete RCC M-25 in sub-structure complete as per drawing Technical specifications height upto 5 mtr using Batching Plant,transit mixer & concrete pump including centering and shuttering. (CSR Item No. 21.32-F/a/ii)

65.85

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete RCC M-30 in sub-structure complete as per drawing Technical specifications height upto 5 mtr using Batching Plant,transit mixer & concrete pump including centering and shuttering. (CSR Item No. 21.32-G/a/ii)

241.98

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete RCC M-30 in super-structure complete as per drawing Technical specifications height upto 5 mtr using Batching Plant,transit mixer & concrete pump for solid slab including centering and shuttering. (CSR Item No. 22.1-C/a/ii)

55.13

-

-

... More
Provision of an Reinforcedcement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, onstructed withM-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture. (CSR Item No. 22.12A)

61.87

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and Technical Specifications. (CSR item no.21.33)

27.5

-

-

... More
Providing and fixing 160 mm dia PVC pipe for service duct single socketed (working pressure 4 kgf / cm²) (CSR item no. 13.74-ii)

61.87

-

-

... More
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. (CSR item no: 16.17 )

137.94

-

-

... More
Applying priming coat with cement primer in all shade on newly plastered or concrete exterior surface (CSR item No. 16.31 )

137.97

-

-

... More
Filling expansionjoints with special impervious hot pour. (CSR item No. 19.16)

46.32

-

-

... More
Drainage Spouts complete as per drawing no. SD/205 and Technical specification with 0.6 meter long GI 100 mm dia discharge GI light grade pipe (for Bridges) (CSR Item no. 22.8-B)

10

-

-

... More
Any Other Item

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.