Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date3 Dec 2024
Closing Date13 Jan 2025
Tender Amount₹ 2,35,86,000
Costs
EMD
₹ 4,71,720Document Cost
₹ 20,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_130972_1Bid Award Id
ViewTender No
15/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://https://irrigation.punjab.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete 1:3:6 (a) with stone ballast 20mm gauge ii)mixing by mechanical means using concrete
mixer volumetric type
1
-
-
... More
Cement Concrete 1:2:4 with stone ballast using mixing by mechanical means using concrete
mixer volumetric type
1
-
-
... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. (extra using computerised conc.batch mixing plant and carrige by 1 Km )
1
-
-
... More
Cold twisted deformed bar (Ribbed/Tor steel) Bars (Fe 500 grade as per IS 1786/2008), For RCC works,where not including the complete rate of RCC including bending and binding placing in position complete.
1
-
-
... More
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
1
-
-
... More
Providing, lowering in trenches to correct gradient and alignment, jointing with tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall rest on the beds at all joints through their lengths and fixing of rubber ring, facing, testing the pipes for leakage and making good the same leakage and all defects to the entire satisfaction of the Engineer-in-charge including all cartage etc 1000mm dia
1
-
-
... More
Extra for providing 1:2 cement sand mortar on tytone rubber joint of RCC pipes having sockets extended out of barrel, in trenches including facing trowelling and finishing the joints at the angle of 45 degree with faces of socket keeping joints wet till cured, testing the pipe joints for leakproof and making good all leakage and defects as per specifications.
1
-
-
... More
compaction of earth
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements