Water Resources Department Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date28 Dec 2023
Closing Date8 Jan 2024
Tender Amount₹ 30,64,744
Costs
EMD
₹ 61,295Document Cost
₹ 2,000Tender Fee
₹ 3,616
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WR_114625_1Bid Award Id
ViewTender No
57/2023-24/Kandi Canal-1Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dressing of earth work ((i)) New work or remodeling work.
2907.2
-
-
... More
Dag-belling:- ((a)) Single Kassi stroke minimum 7.5 cm depth.
2.39
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m
458.83
-
-
... More
((b)) Disposal/ carraige additional beyond 450m upto 1Km
458.83
-
-
... More
((c)) Disposal/carraige for every additional 1Km upto 5.37 Km
458.83
-
-
... More
Dressing bed and preparation of sub grade for lining.
688.31
-
-
... More
Dressing side slopes and preparation of sub grade for lining.
1785.35
-
-
... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
2549.47
-
-
... More
Filling expansion joints with special impervious hot pour 12.5mm wide.
160.26
-
-
... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- ((a)) 0 to 1.5 m depth
275.95
-
-
... More
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
219.96
-
-
... More
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
666.08
-
-
... More
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
666.08
-
-
... More
Extra for rolling to specifications.
666.08
-
-
... More
Filling contraction joints with special impervious hot pour 12.5mm wide. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.
6335.28
-
-
... More
Extra bitumen painting at 0.69 Kg. per sqm
146.84
-
-
... More
Supplying and laying of LDPE geomembrane sheet for sleepers of 150 micron thickness as approved by
engineer incharge pasting on faces of sleepers including laying in position, carriage to site, jointing/welding etc. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.
418.27
-
-
... More
Dismantling brick work tile, masonry or tile lining ((b)) In cement
124.93
-
-
... More
((b)) In cement
34.99
-
-
... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth
20.58
-
-
... More
12.5 mm thick cement plaster 1:3
267.01
-
-
... More
Cement concrete 1:2:4 volumetric with stone ballast or shingle by mechanical means using concrete mixture
using volumetric type.
13.5
-
-
... More
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
153.2
-
-
... More
Dressing side slopes and preparation of sub grade for lining.
75.86
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (B) Mechanical Means (a) Depth upto 3 m
321
-
-
... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
23.13
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (F) RCC Grade M25 ((a)) Height upto 5m ((ii)) With Batching Plant,Transit Mixer and Concrete Pump
62.9
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing andTechnical Specifications.
3.53
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (B) Sandy material
23.05
-
-
... More
Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer
volumetric type
1.85
-
-
... More
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. (A) D.I. Pipe as per IS 8329 DI-K7 (( c)) 150mm i/d pipe lines laid complete
15
-
-
... More
Earth work for outlet:- ((a)) Earth work for dismantling or construction of new pipe or barrel type outlets (including excavation, refilling, consolidation and dressing) ((i)) Channel discharge upto 1.5 cums per second.
5
-
-
... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. ((a) ) Pipe or barrel type outlets ((i)) Channel discharge upto 1.5 cum/s
5
-
-
... More
Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer
volumetric type
4.27
-
-
... More
Earth work for outlet:- ((a)) Earth work for dismantling or construction of new pipe or barrel type outlets (including excavation, refilling, consolidation and dressing) ((i)) Channel discharge upto 1.5 cums per second.
7
-
-
... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. ((a) ) Pipe or barrel type outlets ((i)) Channel discharge upto 1.5 cum/s
7
-
-
... More
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. (A) D.I. Pipe as per IS 8329 DI-K7 (( c)) 150mm i/d pipe lines laid complete
48.3
-
-
... More
Laying RCC 1:2:4 (M-15) batch mixed with stone ballast or shingle
0.51
-
-
... More
Bending binding and placing in position steel reinforcement 10 mm dia bars as per drawing
0.36
-
-
... More
Bending binding and placing in postion steel reinforcement 10 mm dia bars as per drawing
0.2
-
-
... More
Laying C.C. M-10 with stone ballast or shingle i/c supply and carriage of material at site of work complete in all respects
0.29
-
-
... More
Laying RCC 1:2:4 (M-15) batch mixed with stone ballast
or shingle
0.06
-
-
... More
ANY OTHER ITEM
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements