Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 4,32,308Document Cost
₹ 20,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_129720_1Tender No
008/FazilkaCanal/2024-25 dated 11/11/2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not
involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches,
stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in
15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
443.06
-
-
Dismantling of brick Masonry in cement
2359.83
-
-
Dismentling of Coping
216.32
-
-
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications. (CSR item no. 24.5 b (i+ii+iii))
9156.28
-
-
Shuttering for faces of concrete foundations and foundation beam & plinth beam (Vertical or battering) (CSR item no. 9.1)
1417.32
-
-
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc
2.39
-
-
Extra bitumen painting at 0.69 Kg. per sqm
1660.32
-
-
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side
slopes before laying concrete on bed and side slope
27339.88
-
-
Filling expansion joints with special impervious hot pour 12.5mm wide
283.1
-
-
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing
-
-
-
(Up to 1.50 mtr depth)
6223.85
-
-
From Depth 1.5 mtr to 3 mtr
986.37
-
-
Dressing side slopes and preparation of sub grade for lining.
25360.56
-
-
Excavation of soil using JCB and hydraulic tractor trolley including cutting and loading in trolley and
transporting to the embankment location with all lifts and leads including cost of earth complete in all
respect, but excluding royalty. (Lead 3.0 Km pucca
12184.77
-
-
Filling contraction / construction joints with sealing compound to be applied hot after applying primer
coat including supply & carriage all material complete in all respect
8985.48
-
-
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto
9cum/s including boundary road (Discharge above 1.5 cum/s to 4.50 cum/s)
4.54
-
-
Cement concrete lining 75 mm. thick or less (60 mm thick) laid manually for irrigation channels, using
cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching &
Mixing Plant and transported to the site in transit mixers with all lifts and leads. (FOR TRAPEZOIDAL
SECTION AND CUP SECTION OF ALL RADII)
1541.33
-
-
Providing and laying cement concrete (M-15) for coping & Sleepers mixed in automatic computerized
batching and mixing plant and transported to the site in transit mixers including supply and carriage &
loading unloading of all materials complete in all respect as per PWD specifications and
engineer-in-charge
443.06
-
-
Laying cement concrete 1:3:6 mechanically mixed with stone ballast or shingle using concrete mixer
volumetric type.
0.72
-
-
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as
per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering
in foundation & plinth
1.31
-
-
Laying Plain Cement Concrete 1:4:8 with stone ballast 40 mm gauge mixing by mechanical means using
concrete mixer volume metric type.
20.08
-
-
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe-500 grade as per IS 1786-1985, for R.C.C
works, where not including in the complete rate of RCC including bending and placing in position
complete.
3.99
-
-
Laying Plain cement concrete M-10 in foundation complete as per drawing and technical specifications
using concrete mixer volumetric type
3.32
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including
setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,
dressing of sides and bottom and backfilling with excavated surplus soil.
In Ordinary soil
-
-
-
Depth upto 3 m
119.47
-
-
Depth 3 m to 6 m
3.49
-
-
plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical
Specifications RCC Grade M30 Using Batching Plant, Transit Mixer and Concrete Pump
10.88
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
2.08
-
-
Re-handling of Earth work.
57.3
-
-
Making dewatering arrangement by pumping set 4 *4 (Tractor driven)
30
-
-
Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire confoming to IS:
280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and
joints laid with stone boulders weighing not less than 18 kg, Including excavation for trimming for
prepration of bed Boulder Apron Laid in Wire Crates
15.73
-
-
Supplying, Fitting and Placing un coated HYSD bar Reinforcement in Foundation complete as per Drawing
and Technical Specifications.
1.48
-
-
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Double Flanged pipes with
screwed flanged as per IS:8329-2000, Class-K9 and laying the same in trenches to correct alignment and
gradients,jointed with nut bolts and rubber insertion joints fitted complete including all cartage.500mm i/d pipe lines laid complete
21.64
-
-
Providing & fixing C.I/D.I Flanged end, stem of SS (AIS 1410) and Bronze(gunmetal) working parts
Sluice Valves ISI marked 14846-2000, including jointing , testing & cost of Nut ,Bolt & insertion sheet,
all carriage complete (with the approval of Engineer in-charge).Class PN-1 as per IS500mm i/d Sluice Valves flanged
1
-
-
Proving & fixing ISI Marked Non-return valves flanged end class PN-1.0 as per IS:5312/2004 in pipe
lines including jointing & cost of Nut Bolt , rubber insertion etc. complete.
Note: If Non-return valves class PN-1.6 is used instead of class PN-1.0 , than 5% will be paid extra.Class PN-1.0 as per ISI with rubber Flat 500mm i/d Non-return valve
1
-
-
Construction of masonary Sluice Valve Chamber excluding Sluice valve cover as per standard design &
drawings of public health department Size 0.9 m. x 0.9 m
1
-
-
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation,
refilling , consolidation and dressing )With H more than 0.5 m. but upto 0.9 m
8
-
-
Earth work involved in dismantling gullet walls of outlets for adjusting 'Y' of A.P.M. or 'B' of open flume
With H more than 0.5 m. but upto 0.9 m
8
-
-
Earth work for dismantling or construction of new pipe or barrel type outlets (including excavation,
refilling, consolidation and dressing Channel discharge upto 1.5 cums per second
1
-
-
Adjusting A.P.M. to the correct 'Y' and fixing in positionxtra over item No. 20.3(a) in case of old Outlets where dismantling and reconstructing of gullet walls
is involved including change in width of gullet i.e. B of the outlet upto 30 m.m With H more than 0.5 m. but upto 0.9 m
8
-
-
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m
8
-
-
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
49.06
-
-
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per
IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in
foundation and plinth.
3.18
-
-
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern
making, as per ISI specifications no. 7986-19766
-
-
-
0.20 ft = 6.1 cm (min wt 65 kg)
1
-
-
0.32 ft= 9.9 cm (min wt 72 kg)
5
-
-
0.40 ft= 12.2 cm (min wt 76 kg)
2
-
-
Dismantling outlets including removal of dismantled material involving lead upto 100 metresipe or barrel type outlets Channel discharge upto 1.5 cum/s
1
-
-
Laying iron pipes for outlets upto 150 m.m. diameter
1
-
-
Any Other Item
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%