Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Feb 2024
Closing Date22 Feb 2024
Tender Amount₹ 1,79,59,841
Costs
EMD
₹ 3,60,000Document Cost
₹ 10,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_116761_2Bid Award Id
ViewTender No
E-Tendering Notice No.48/Abohar Canal Ground Water Division /2023-24 Dated 01/02/2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Extra for compaction of earth including laying earth in 20cm layers, watering and rolling to specifications.
9240
-
-
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth)
1421
-
-
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (1.50 mtr - 3 mtr depth)
618
-
-
Dressing of side slopes and preparation of subgrade for lining complete in all respect as per PWD specifications and engineer-in-charge.
22521
-
-
E/work in excavation in foundation/ trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 mt depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation.
255
-
-
Excavating conglomerate for drains and bed sleepers under the lining.
223
-
-
Extra bitumen painting at 0.69 Kg. per Sqm (as per IS 3384-1985)
1445
-
-
Supplying and Laying LDPE film of 150 microm over sleepers (for construction & expansion joints) I/C carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.(M-73)
199
-
-
Shuttering for faces of Concrete
778
-
-
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.
25187
-
-
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km
1740
-
-
Providing and filling Construction joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings complete in all respect
41243
-
-
Dressing of earth work for new work or remodeling work Unit
12192
-
-
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge exceeding 1.5 Cum/s but upto 4.5 Cum/s including boundary road
3.11
-
-
Cement concrete lining 15cm thick or less for irrigation channels, using cement concrete 1:2:4 (M-15) 19
-19.23 Machine mixed concrete lining on side slopes for vertical height upto 3.5 m.
478
-
-
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((a)) Disposal/carraige from 0 upto 450m
8257
-
-
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((b)) Disposal/ carraige additional beyond 450m upto 1Km
8257
-
-
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads . total lead 2.92km pucca ((c)) Disposal/carraige for 1.99km from 1km upto 2.92km.
8257
-
-
Sub Estimate : 1.1 - Outlet on petrollling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
3
-
-
Sub Estimate : 1.1 - Outlet on petrollling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
3
-
-
Sub Estimate : 1.1 - Outlet on petrollling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
3
-
-
Sub Estimate : 1.1 - Outlet on petrollling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
8.52
-
-
Sub Estimate : 1.1 - Outlet on petrollling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
23.85
-
-
Sub Estimate : 1.1 - Outlet on petrollling side RCC M-20 in superstructure
1.8
-
-
Sub Estimate : 1.1 - Outlet on petrollling side Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
29.49
-
-
Sub Estimate : 1.1 - Outlet on petrollling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
0.78
-
-
Sub Estimate : 1.1 - Outlet on petrollling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
1.44
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5 m but upto 0.9 m
1
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m
1
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m
1
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
2.14
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
5.25
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side RCC M-20 in superstructure
0.25
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
8.16
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
0.26
-
-
Sub Estimate : 1.2 - Outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.
0.22
-
-
Sub Estimate : 1.3 - distance mark Laying cement concrete 1:3 :6 (M-10) with stone ballast or shingle I/c supply and carriage of material at site of work complete in all respect
0.48
-
-
Sub Estimate : 1.3 - distance mark Laying R.C.C. 1:2 :4 (M-15)
excluding steel reinforcement but including centering and shuttering and vibrating the concrete (precast concrete )
0.1
-
-
Sub Estimate : 1.3 - distance mark Bending binding and placing in position steel reinforcement
0.34
-
-
Any Other
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements