Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date28 Jan 2025
Closing Date13 Feb 2025
Tender Amount₹ 27,28,903
Costs
EMD
₹ 54,578Document Cost
₹ 2,000Tender Fee
₹ 3,220
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WR_133675_1Tender No
51/2024-25/KANDI CANAL 1Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
3.37
-
-
... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth
311.63
-
-
... More
10mm thick Cement Plaster 1:3
2360.72
-
-
... More
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Earth work upto 1.5 m. Depth for. All classes of soil except rocky
276.75
-
-
... More
Providing orange colour safety footrest of minimum 6mm thick plastic encapsulated as per IS:10910 on 12mm dia steel bar confirming to IS: 1786 having minimun cross section as 23mm x 25mm and over all minimum length 263mm and width as 165mm with minimum 112mm space between protruted legs having 2mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specification and having manufacturer's permanent identification mark to be visible even after fixing, including fixing in manholes with 230x150x75cm cement concrete block 1:2:4 (1 cement: 2 sand: 4 stone aggragate) complete as per design
15
-
-
... More
Providing lowering precast 250 mm concrete NP-2 plain end pipes and collar with reinforcement,in trenches to correct gradient and alignment,cutting of reinforcement cement concrete plain end pipes,stringing in trenches,jointing ends and fixing collar, with cement mortar 1:2 as per IS 458:2003 into trenches for all depths and laying oout same to correct alignment,gradient,levels etc,complete in all respect
164
-
-
... More
Earth work excavation in ordinary soil, exclusive of compensation of earth: Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
423.58
-
-
... More
Earth work undressed with a combined lead upto 15 metres including breaking of clods.
638
-
-
... More
Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the plinth in 15cm layers including ramming, watering and consolidating lead upto 30 metres
424
-
-
... More
Rehandling of recently excavated
423.58
-
-
... More
Cement concrete 1:2:4 With stone ballast or shingle mixing by manual means
1.01
-
-
... More
Any Other Item (CSR + SP)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%