Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date19 Nov 2024
Closing Soon27 Nov 2024
Tender Amount₹ 3,76,54,761 
Notes
Download

Costs

  • EMD

    ₹ 7,53,095
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dressing of dowels along water carrying channel in addition to payment for dressed earth work.

9867.99

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

10

-

-

... More
Dismantling brick work tile, masonry or tile lining in cement. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

11.9

-

-

... More
Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

10

-

-

... More
Providing and laying in position design mix 1:3:6 (M-10) concrete 50.8 mm/100 mm thick below damage portion of brick lining both in bed and side slope Mixing By Mechanical Means using concrete mixer .

33.46

-

-

... More
First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level.( For repair of pacca stucture)

20

-

-

... More
Extra bitumen painting at 0.69 Kg. per Sqm. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

51.7

-

-

... More
Dressing bed and preparation of sub grade for lining. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

143.05

-

-

... More
Dressing side slopes and preparation of sub grade for lining. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

296.17

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.

55526.69

-

-

... More
Bending and fixing iron rungs on lined slope

37

-

-

... More
Earthwork for lip cutting for lining of irrigation channels inclusive of all allowance, lead and dressing. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

-

-

-

... More
For 0 to 1.5 m depth.

145.81

-

-

... More
Depth exceeding 1.5 m but upto 3.0 m

2.95

-

-

... More
Rubbing and cleaning the surface of Existing Brick lining (to be used as sub grade) in side slope by means of wire brushes, water & air applied under pressure through nozzle to get rid of dirt , sand etc deposited on it complete in all respect as per specification and instruction of engineer

55103.8

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

-

-

-

... More
Disposal/carraige from 0 upto 450 m.

29962

-

-

... More
Disposal/ carraige additional beyond 450 m upto 1Km.

29962

-

-

... More
Disposal/carraige for every additional beyond 1 Km upto 7Km.

29962

-

-

... More
Cement concrete lining 75 mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII). Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. ( For lining and coping)

3525.71

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. (Depth 3 m )

20

-

-

... More
Plan/Rcc in open foundation complete as per drawing and technical specifications PCC grade M15 ( For Sleeper)

2.81

-

-

... More
Rcc M-25 in sub structure complete as per drawing and technical specification with batching plant transit mixer and comcrete pump up height 5m

20

-

-

... More
Supplying, fitting and placing HYSD bar reinforcumcement in super-structure completeas per drawing and technical specifications.

20

-

-

... More
Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

-

-

-

... More
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.

263.72

-

-

... More
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.

263.72

-

-

... More
Extra for rolling to specifications.

263.72

-

-

... More
Filling expension joints with special impervious hot pour 12.5 mm wide.

113.35

-

-

... More
Filling Construction/Contraction with sealing compound including supply and carriage of material complete in all respects.

157.84

-

-

... More
Clearance of weed, jalla, deela, sarkanda,jungle,Butti, Dhora, Silt,etc Manually from inner secton of lined Channel (Medium Growth)

-

-

-

... More
discharge exceeding 1.42 but upto 2.83 cumecs

7347.26

-

-

... More
discharge exceeding 2.83 cumecs

2520.73

-

-

... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

-

-

-

... More
For Discharge upto 1.5 cum/s.

7.35

-

-

... More
For Discharge upto 1.5 cum/s. to 4.5 cum/s

2.52

-

-

... More
Providing, Laying and fixing of Tail cluster Bifurcation including dismantling of old tail clusters. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.

1

-

-

... More
Providing, Laying and fixing of DI-dk-7 pipe of 150 mm dia outlet petrolling side Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.

2

-

-

... More
Providing, Laying and fixing of DI-dk-7 pipe of 150 mm dia outlet Non-petrolling side Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.

14

-

-

... More
Any Other

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.