Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Water Resources Department - WRD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date20 Oct 2023
Closing Date5 Dec 2023
Tender Amount₹ 2,19,19,419
Costs
EMD
₹ 4,38,388Document Cost
₹ 5,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_WR_111365_1Bid Award Id
ViewTender No
43/22A/2023-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (a) Disposal/carraige from 0 upto 450m
36802.53
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km
36802.53
-
-
... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km
36802.53
-
-
... More
Extra for laying earthwork as per specifications for compaction in 20 cm layer and dressing including cost of rolling and watering as per specifications
25759.63
-
-
... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
2456.27
-
-
... More
Dressing of earth work
25800.06
-
-
... More
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification
9465.14
-
-
... More
Providing and laying cement concrete M-15 for Sleeper in beds and side slopes below the joints of concrete lining mixed in automatic computerised batching and mixing plant and transported to the site in transit mixers complete in all respect in PWD specifications: in Sleepers
35.61
-
-
... More
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
10915.06
-
-
... More
Cement concrete lining 60mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
559.14
-
-
... More
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN COPING
126.36
-
-
... More
Filling of construction joints with sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth
3040.29
-
-
... More
Filling expansion joints with special impervious hot pour 12.5 mm wide including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications : a) For 60 mm thick Slab of lining
100.55
-
-
... More
Providing and laying LDPE 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
63.37
-
-
... More
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
791.05
-
-
... More
Applying Bitumen Primer on side of Lining and top of sleeper for construction joint,etc. complete in all respects
466.49
-
-
... More
Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications
3.04
-
-
... More
Providing, lowering in trenches to correct gradient and alignment, jointing with
tyton rubber joint and cutting of reinforced cement concrete spigot and socketed pipes and specials with rubber ring ISI marekd as per IS code IS 458-2003 into trenches for all depths and laying out the same to correct alignment, gradients, levels etc. cutting of concrete beds and joints holes, supporting the pipes and specials in correct position in a suitable rigid manner while the same are being jointed and until the surrounding benchings, haunches and envelopes are completed. The pipes shall
rest on the beds at all joints through their lengths and
fixing of rubber ring, facing, testing the pipes for leakage
and making good the same leakage and all defects to the
entire satisfaction of the Engineer-in-charge including
all cartage etc.
400 mm Dia Pipe
7.32
-
-
... More
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
6
-
-
... More
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
6
-
-
... More
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
6
-
-
... More
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
43.59
-
-
... More
RCC M-20 in superstructure
2.67
-
-
... More
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars
Fe 500 grade as per IS 1786-1985, for R.C.C works,
where not including in the complete rate of RCC including bending and placing in position complete.
2.19
-
-
... More
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
6.37
-
-
... More
P & F of Distance Marks
10
-
-
... More
P & F of Boundary Pillar
20
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with approved material
72.01
-
-
... More
Cement concrete 1:3:6 by mechanical means
19.03
-
-
... More
Plain/Reinforced cement concrete in sub-structure
complete as per drawing and Technical Specifications RCC Grade M25 With Batching Plant, Transit Mixer and Concrete Pump RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
15.35
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical
Specifications.
1.27
-
-
... More
Providing and laying of filter media with granular media/stone crushed aggregates satisfying requirements laid down in clause 2504.2.2 of Morth specifications toa thickness not lesser than 600mm with smaller size towards soil and larger size towards wall
0.06
-
-
... More
Backfilling behing abutment,wing wall and
return wall complete as per drawing and technical
specification sandy material
0.46
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications-RCC Grade M 20 height upto 5m with batching plant, Transit Mixer and Concrete
Pump
4.48
-
-
... More
Any Other Items
1
-
-
Evaluation Notes How It Works ?