Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date30 Sep 2023
Closing DateCancelled
Tender Amount₹ 8,47,636 
Notes
Download

Costs

  • EMD

    ₹ 16,953
  • Document Cost

    ₹ 500
  • Tender Fee

    ₹ 1,000

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)

-

-

-

... More
Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)

-

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15

-

-

-

... More
Plain/Reinforced cement concrete grade M25 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.

-

-

-

... More
Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.

-

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

-

-

-

... More
Earth work for lip cutting for lining of irrigation channels including of all allowances lead and dressing (0-1.5 mtr)

-

-

-

... More
Dressing side slopes and preparation of sub grade for lining

-

-

-

... More
Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes

-

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For side slopes

-

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Sleeper

-

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Coping

-

-

-

... More
Extra bitumen painting at 0.69 per sqm (on sleeper)

-

-

-

... More
Providing & laying 150 micron Polyethene Sheet over sleeper

-

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specification

-

-

-

... More
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.

-

-

-

... More
Drainage Spouts complete as per drawing no. SD/205 and Technical specification with 0.6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)

-

-

-

... More
Filling expansion joints of bridge with special bituminous material of size approx wide 20mm and 385 mm depth

-

-

-

... More
Filling expansion joints with special impervious hot pour 12.5 mm wide

-

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 and Tippers with Disposal up to 450 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 450m

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.