Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date2 Dec 2024
Closing Date19 Dec 2024
Tender Amount₹ 3,25,00,000 
Notes
Download

Costs

  • EMD

    ₹ 6,50,000
  • Document Cost

    ₹ 20,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dressing of earthwork.

1

-

-

... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth

1

-

-

... More
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m

1

-

-

... More
Dressing of Dowel

1

-

-

... More
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.

1

-

-

... More
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.

1

-

-

... More
Dressing of Bed and prepration of sub grade for lining complete in all respect as per pwd specification.

1

-

-

... More
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.

1

-

-

... More
Cement concrete lining 10 cm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for lining)

1

-

-

... More
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km.( for lining cup)

1

-

-

... More
Cement concrete lining laid manually for coping using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Coping) for coping

1

-

-

... More
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. for sleeper

1

-

-

... More
"Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)"

1

-

-

... More
Filling Contraction/Construction Joint with sealing compound complete in all respect

1

-

-

... More
Filling expansion joints with special impervious hot pour 12.5 mm wide.

1

-

-

... More
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm

1

-

-

... More
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.

1

-

-

... More
Dag belling single Kassi stroke minimum 7.5 cm depth.

1

-

-

... More
Dismantling brick work, tile masonry or tile lining (in cement mortar).

1

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Deduction for Credit Material old brick bat LINING (19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m

1

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Deduction for Credit Material old brick bat LINING (19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((b)) Disposal/ carraige additional beyond 450m upto 1Km

1

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads Deduction for Credit Material old brick bat LINING (19.38) Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((c)) Disposal/carraige lead from 1Km to 4.64Km

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with ‘H‘ more than 0.5 m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side Dismantling O.F., A.P.M. Or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with ‘H‘ more than 0.5m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with ‘H‘ more than 0.5m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side "Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)"

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.

1

-

-

... More
Sub Estimate : 1.1 - Outlet on petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.

1

-

-

... More
CHAPTER NO. 10 CONCRETE (10.11) Cement concrete 1:4:8 ((a)) with stone ballast 20mm gauge (i) with stone ballast 20mm gauge

1

-

-

... More
CHAPTER NO. 10 CONCRETE (10.15) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side E/W involved in constructing new O.F,A.P.M. or O.S.M. type outlets with 'H' more than 0.5m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling i.e. R.C. Slab and cement Masonry with 'H' more than 0.5m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.5m but upto 0.9 m

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side "Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)"

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.

1

-

-

... More
Sub Estimate : 1.2 - Outlet on non petrolling side Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete. position complete.

1

-

-

... More
CHAPTER NO. 10 CONCRETE (10.11) Cement concrete 1:4:8 ((a)) with stone ballast 20mm gauge (i) with stone ballast 20mm gauge

1

-

-

... More
CHAPTER NO. 10 CONCRETE (10.15) Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.

1

-

-

... More
Sub Estimate : 1.3 - distance mark CHAPTER NO. 10 (10.12) Cement concrete 1:3:6 (a) with stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

1

-

-

... More
Sub Estimate : 1.3 - distance mark CHAPTER NO. 10 (10.13) Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type

1

-

-

... More
CHAPTER NO. 18 STEEL AND IRON WORK (18.18)Sub Estimate : 1.3 - distance mark STEEL AND IRON WORK Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

1

-

-

... More
Any Other

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.