Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date12 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 2,12,96,530 
Notes
Download

Costs

  • EMD

    ₹ 4,25,931
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Desposal carrage lead 450 mtr - 1 km (katcha)

5214.24

-

-

... More
Desposal carrage lead Above 10 km (katcha)

5214.24

-

-

... More
Desposal carrage lead 450 mtr - 1 km (Pucca)

5214.24

-

-

... More
Desposal carrage lead Above 10 km (Pucca)

5214.24

-

-

... More
Extra for laying earth/fly ash as per specifications for compaction in 20 cm layers and dressing,watering, rolling as per specifications for compaction.

7083.84

-

-

... More
Dressing of new Earth work

24873.91

-

-

... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :(a ) 0 to 1.5m depth

1160.18

-

-

... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :(b) 1.5m to 3.0m depth

190.06

-

-

... More
Earthwork excavation in foundations trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing ofbottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.

515.72

-

-

... More
Dressing side slopes and preparation of sub grade for linning

30834.38

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes

33801.5

-

-

... More
Cement concrete lining 75mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km.

2313.14

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

659.21

-

-

... More
Filling Contraction Joint with special impervious hot pour 12.5mm wide.

9745.9

-

-

... More
Applying Bitumen Primer coat on side of lining and top of sleeper for construction joint, Expansion Joint & Contraction Joint. Complete in all respect.

2490.31

-

-

... More
LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.

280.88

-

-

... More
Dismantling brick work, tile masonry or tile lining (in cement mortar).

2788.99

-

-

... More
Providing and Fixing Distance Marks

17

-

-

... More
Filling expansion joints with special impervious hot pour 12.5mm wide.

339.3

-

-

... More
Ordinary jungle clearance with discharge more than 1.5 cumes upto 4.5 cumes

1.5

-

-

... More
Brick Masonary Work in cement mortar 1:3 in foundation and plinth

91.84

-

-

... More
Deep Pointing on Brick work in 1:2 cement mortar

120

-

-

... More
Crane 35 tonne

24

-

-

... More
Laying R.C.C. (M-15) including supply and carriage of material to site of work complete in all respects as per PWD specifications in super structure

15

-

-

... More
TOR Steel Reinforcement for R.C.C. work including bending, binding and placing in position complete in all respects(*CTD bars)

12.84

-

-

... More
Providing and laying Sign Boards on both sides

6

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Case I Using Batching Plant, Transit Mixer and Concrete Pump For Solid slab super-structure- including centering and shuttering Height up to 5m

27

-

-

... More
Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc.

7.98

-

-

... More
Cement concrete 1:4:8 with stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type

18.51

-

-

... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.

3.23

-

-

... More
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete

2.58

-

-

... More
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling , consolidation and dressing ) With H more than 0.5 m. but upto 0.9 m

7

-

-

... More
Dismantling outlets including removal of dismantled material involving lead upto 100 metres Dismantling O.F., A.P.M. Or O.S.M. type outlets involving dismantling cement masonry and removing of precast R.C. Slab With H more than 0.5 m. but upto 0.9 m

7

-

-

... More
Extra labour for dressing bricks On O.F. and A.P.M. type outlets With H more than 0.5 m. but upto 0.9 m

7

-

-

... More
Any other Items

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.