Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Feb 2024
Closing Date2 May 2024
Tender Amount₹ 4,92,00,000 
Notes
Download

Costs

  • EMD

    ₹ 9,84,000
  • Document Cost

    ₹ 5,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Soil (any type) using HydraulicExcavator CK 90 with hydraulic excavator of 0.9cum bucket capacity including cutting, trimmingbottom and side slopes, in accordance with requirements of grades and cross sections, including all lifts and combined lead upto 30m

-

-

-

... More
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads

-

-

-

... More
((a)) Disposal/carraige from 0 upto 450m (Kacha)

-

-

-

... More
((b)) Disposal/ carraige additional beyond 450m upto 1Km (Kacha)

-

-

-

... More
((c)) Disposal/carraige for every additional Km upto 10 Km (Kacha)

-

-

-

... More
((b)) Disposal/ carraige additional beyond 450m upto 1Km (pucca)

-

-

-

... More
((c)) Disposal/carraige for every additional Km upto 10 Km (pucca)

-

-

-

... More
Dressing of dowel along water carrying channel in addition to payment for dressed earthwork

-

-

-

... More
Excavating conglomerate for Drains and Bed Sleepers under the lining.

-

-

-

... More
Extra for laying earth/fly ash as per specifications for compaction in 20 cm layers and dressing watering, rolling as per specificaitons for compaction

-

-

-

... More
Dressing of New Earth work

-

-

-

... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- 0 to 1.5 m depth

-

-

-

... More
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- 1.5 to 3.0 m depth

-

-

-

... More
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.

-

-

-

... More
Dressing side slopes and prepration of sub grade for linning

-

-

-

... More
Dressing bed and prepration of sub grade for linning

-

-

-

... More
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes

-

-

-

... More
Cement concrete lining 100mm. thick or less with mechanical Paver for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km( for vertical height up to 2m)

-

-

-

... More
Cement concrete lining 100 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (for vertical height above 2.0 m but upto 3.50 m)

-

-

-

... More
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km( For trapezoidal Section and cup section of all Raddi)

-

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

-

-

-

... More
Filling Contraction/construction Joint with sealing compound complete in all respect

-

-

-

... More
Filling Expansion Joint with special impervious hot pour 12.5mm wide.

-

-

-

... More
Extra bitumen painting over concrete surface at joints @ 0.69 Kg per sqm

-

-

-

... More
LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loadingunloading of all material complete in all respect as perPWD specification andEngineer in Charge

-

-

-

... More
Dismantling brick work, tile masonry or tile lining (in cement mortar)

-

-

-

... More
Providing and Fixing Distance Marks

-

-

-

... More
Providing and Fixing outlet (Patrolling and non patrollingSide)

-

-

-

... More
Brick masonary work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical specifications.

-

-

-

... More
Deep pointing on brick work in 1:2 cement mortar.

-

-

-

... More
Crane 35 Tone

-

-

-

... More
Laying RCC (M-20) including supply and carriage of material to site of work complete in all respects as per PWD specifications in super-structure

-

-

-

... More
Laying RCC (M-15) including supply and carriage of material to site of work complete in all respects as per PWD specifications in super-structure

-

-

-

... More
TOR steel Reinforcement For RCC work including bending, binding and placing in position complete in all respects.

-

-

-

... More
Providing and laying sign boards on both sides

-

-

-

... More
Any other item

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.