Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Sep 2024
Closing Soon21 Oct 2024
Tender Amount₹ 1,65,22,000 
Notes
Download

Costs

  • EMD

    ₹ 3,30,440
  • Document Cost

    ₹ 2,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling Brick work in cement.

11.49

-

-

... More
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)

272.08

-

-

... More
Extra bitumen painting at 0.69 kg per sqm. Priming coat as per IS 3384-1985 for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specifications and engineer-in-charge.

1129.25

-

-

... More
Cold twisted deformed (ribbed/ tor steel) Bars Fe 500 grade as per IS 1786-1985 for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete.

61.94

-

-

... More
Dressing of BED and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge.

6064.61

-

-

... More
Dressing of side slopes and preparation of sub grade for lining complete in all respect as per PWD specifications and engineer-in-charge.

14006.17

-

-

... More
Cement water slurry 1:3 with cement @ 2.25 kg per Sqmt as on prepared side slopes before laying concrete on side slopes including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.)

19774.96

-

-

... More
Filling Contraction Joint with special impervious hot pour 12.5mm wide.

3834.18

-

-

... More
E/work for lip cutting for lining of irrigation Channels inclusive of all allowances, lead and dressing (up to 1.50 mtr depth).

2117.93

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 0 to 450m including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 450m to 1km including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 1km to 2km including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 2km to 3km including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 3km to 4km including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Excavation in soil using Hydraulic excavator and Hydraulic Tractor trolley with disposal 4km to 5km including cutting and loading in trolley Transporting to the embankment locations with all lift and leads

19015.83

-

-

... More
Cement concrete lining 75mm thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic to the site in transit computerized transported mixers with an average lead of 1 Km (FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (Without mechanical Paver)

826.52

-

-

... More
Providing and laying cement concrete (M-15) for coping & Sleepers mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply and carriage & loading unloading of all materials complete in all respect as per PWD specifications and engineer-in-charge.

231.12

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976. (0.20 ft= 6.1 cm (min wt 65kg))

1

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976.(0.25 ft= 7.6 cm (min wt 68 kg))

2

-

-

... More
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976.(0.32 ft= 9.9 cm (min wt 72 kg))

3

-

-

... More
Earthwork in excavation in foundation of bridges, culverts, buildings including handling of materials with a combined lead of 15 meters dressing of bed and side stacking the excavated soil from the edge of excavation and subsequent filling around:- (a) For ordinary gravel soil involving pick work. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.

141.11

-

-

... More
Laying Plain Cement Concrete 1:3:6 (M-10) nominal mix in foundation with crshed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

13.27

-

-

... More
Laying Reinforced cement concrete (M-20) mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrated but excluding steel reinforcement, centering and shuttering in super structure.

1.83

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete RCC M-25 in sub-structure complete as per drawing Technical specifications height upto 5 mtr using Concrete Mixer including centering and shuttering.

21.37

-

-

... More
Back filling behind abutment, wing wall andreturn wall complete as perdrawing and TechnicalSpecification. Sandy material.

43.03

-

-

... More
Furnishing and placing reinforcement / prestressed cement concrete RCC Grade M-25 for solid slab by using concrete Mixture ht.upto 5 m as per Drawing and Technical specification including shuttering & centering.

35.4

-

-

... More
Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. (a) Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.

16028.62

-

-

... More
Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. (b) Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.

16028.62

-

-

... More
Compaction. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge. (c) Extra for rolling to specifications.

16028.62

-

-

... More
Ordinary jungle clearance of both banks of running distributaries, minors and drains with Discharge upto 9cum/s including boundary road Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.

4.23

-

-

... More
Providing and Fixing Outlet (Patrolling Side)

1

-

-

... More
Providing and Fixing Outlet (Non-Patrolling Side)

4

-

-

... More
Supply and fixing distance Marks.

14

-

-

... More
Providing boundary pillars.

21

-

-

... More
Any Other Item

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.